FA3047-11-B-0004-0004
17 KB Posted
- Solicitation number
- FA3047-11-B-0004-GasMains-9000-10000areas
About this file
FA3047-11-B-0004-0004 (Amendment) (16 Jun 11)
Text of this file
MPLS 06 9041
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Purpose: To incorporate Revised Statement of Work (SOW) dated 9 Jun 11 and to confirm the bid opening/due date to 27 Jun 11 (Monday), 1:00 pm CST.
POC: Jackie L. Murray, Contracting Officer, jackie.murray@us.af.mil (210) 671-1711
Ryan D. Bueno, Contract Specialist, ryan.bueno.1@us.af.mil (210) 925-1842
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2011
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3047-11-B-0004
X 9B. DATED (SEE ITEM 11)
21-Apr-2011
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2011
CODE
802D CONTRACTING SQUADRON
1655 SELFRIDGE AVE
LACKLAND AFB TX 78236-5253
FA3047 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA3047-11-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
A. The required response date/time is 27-Jun-2011 01:00 PM CST.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from
Design, repair of gas lines in 10000 area in accordance with the Statement of Work dated 9 Feb 11. Contractor shall present a 65%, 95%, and As-built design for review.
to
Design, repair of gas lines in 10000 area in accordance with the Revised Statement of Work dated 9 Jun 11.
Contractor shall present a 65%, 95%, and As-built design for review.
CLIN 0002
The CLIN extended description has changed from
Repair of Gas Mains in accordance with Statement of Work dated 9 Feb 11. MPLS069041 to
Repair of Gas Mains in accordance with Revised Statement of Work dated 9 Jun 11. MPLS069041.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Attachment 1 Revised Statement of Work (SOW) dated 9 Jun 11 is incorporated to replace original SOW dated 9
Feb 11. All other attachments remain unchanged.
ATTACHMENTS
Documents Type Description Pages Date
Attachment 1 Revised Statement of Work 21 9 Jun 11
Attachment 2 Wage Determination TX41 7 12 Mar 10
Attachment 3 Wage Determination Building 5 1 Apr 11
(End of Summary of Changes)
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .