Drawings.pdf

PDF 465 KB Posted

Attached to
Carpet Replacement Federal contract opportunity
Solicitation number
FA303024Q0039
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains a set of drawings related to a federal contract opportunity for Carpet Replacement at Goodfellow AFB in Texas. The solicitation, numbered FA303024Q0039, is being issued by the 17th Contracting Squadron, Air Education and Training Command, Department of the Air Force. The scope includes removal of existing carpet and floor tiles, and replacement with Luxury Vinyl Plank (LVP/LVT) flooring in Buildings 3226, 3303, and 430, as well as providing new thresholds and resilient rubber base. The contract will be awarded on a Firm Fixed-Price basis to the responsible offeror with the most advantageous proposal. The Period of Performance is 90 days after date of award. The acquisition is a 100% Small Business Set-Aside. A site visit is scheduled for July 19, 2024, and proposals are due by August 2, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Carpet Replacement, newest first.
File Type Posted
Flooring - Questions With Answers.pdf PDF
Solicitation Amendment FA303024Q00390001 SF 30.pdf PDF
SOW.pdf PDF
(CUI) BAL Template.pdf PDF
CLIN Schedule without Pricing.pdf PDF
Service Wage Determination.pdf PDF
Solicitation - FA303024Q0039.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMM

MECH RM

FOYER

103 104

FOYER

WOMEN

MEN

JAN

STAIRS

UP

YARD

EQUIPMENT

Phase 1 CARPET - Rooms 103/104, 108

Phase 2 CARPET - Rooms 105, 106/107

*Dimensions are estimates only.

The Contractor shall field verify dimensions and site conditions prior to start of work*

Total Carpet - 950 sq. ft.

Total LVT - 1,305 sq. ft.

Primary Entrance/Exit for Contractor Use

Phase 3 CARPET- Rooms 102, 109

Phase 4 LVT - Lobby 101/116

Work shall be incrementally performed throughout each phase to ensure government functionality.

N

DATE:

SEP 2014

SCALE: 3/32" = 1'-0"

DRAWN BY: VTD

BLDG 3226

1st FLOOR PLAN

3226 Drawing
Sheets and Views
8.5 x 11
3303 Drawing
430 Drawing

File details come from the government source that posted it. Updated .