FA303020B0002 Form_66.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Construct Splash Park at Goodfellow AFB Federal contract opportunity
- Solicitation number
- FA3030
About this file
This document contains a federal contract solicitation and related submittal register for a construction project. The Air Force is seeking bids to construct a splash park at Goodfellow Air Force Base in Texas for between $250,000 and $500,000. Bids are due no later than 2:00 PM on April 20, 2020 at the base. This procurement is set aside only for woman-owned small businesses. The submittal register outlines over 70 data, document, and product samples that will need to be provided to the government at various stages of the project, including plans, schedules, licenses, warranties, and equipment information for the construction of the splash pad and associated facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA303020B0002 Splash Park SF 1419 Abstract.pdf | ||
| Solicitation Amendment FA303020B00020004 SF 30.pdf | ||
| Solicitation Amendment - FA303020B00020004.pdf | ||
| Conformed Copy Solicitation - FA303020B00020003.pdf | ||
| Solicitation Amendment FA303020B00020003 SF 30.pdf | ||
| FA303020B0002 Questions-Answers.pdf | ||
| Solicitation Amendment FA303020B00020002 SF 30.pdf | ||
| Solicitation Amendment FA303020B00020001 SF 30.pdf | ||
| FA303020B0002 BAL Request Form.docx | DOCX document | |
| FA303020B0002 SOW_Specifications 10-28-19.docx | DOCX document | |
| FA303020B0002 DRAWINGS_SPLASH_PARK_10-31-2019.pdf | ||
| FA303020B0002 af3000.pdf | ||
| FA303020B0002 AF Form 3065.docx | DOCX document | |
| FA303020B0002 After Hours Supplemental BAL.docx | DOCX document | |
| Solicitation - FA303020B0002.pdf | ||
| FA303020B0002 Wage Determination TX20200002.pdf | ||
| FA303020B0002 AF 3064.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| REGISTER OF MATERIAL SUBMITTALS | Project Number | Solicitation / Control No. | ||||||||||||||||||||
| Construct Splash Park (B123) | 1073123 | |||||||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| Line Number | Item or Description of Item Contract Reference Type of Submittal | PreConstruction Submittal | Contract Closeout Submittal | Information Only | SUBMITTAL DESCRIPTION | Date Received In Contracting | Date To Civil engineering | Return Suspense Date | Submittal Number | Date Contractor Notified | Contractor Resubmittal Number | Final Approval | Remarks | |||||||||
| CERTIFICATION | SHOP DRAWINGS | SAMPLES / COLORS | MFR'S INSTRUCTIONS | MFR'S PRODUCT DATA | MFR'S WARRANTY | REPORTS | O&M INSTRUCTIONS | OTHER | ||||||||||||||
| APPROVED | DIS APPROVED | |||||||||||||||||||||
| 1 | Work Plan and AF103 Dig Permit | ● | ● | |||||||||||||||||||
| 01 01 00-2.1.1 | ||||||||||||||||||||||
| 2 | Pre-Construction Survey | ● | ● | |||||||||||||||||||
| 01 01 00-2.1.1.1 | ||||||||||||||||||||||
| 3 | Management Plan | ● | ● | |||||||||||||||||||
| 01 01 00-2.6 | ||||||||||||||||||||||
| 4 | Material Approval | ● | ● | |||||||||||||||||||
| 01 01 00-11.1 | ||||||||||||||||||||||
| 5 | Form 1354 | ● | ● | |||||||||||||||||||
| 01 01 00-12.1 | ||||||||||||||||||||||
| 6 | AF3064 Construction Progress Schedule | ● | ● | |||||||||||||||||||
| 01 01 00-16.9a | ||||||||||||||||||||||
| 7 | Schedule of Material Submittals | ● | ● | Gov schedule or Contractor alternative | ||||||||||||||||||
| 01 01 00-16.9b | ||||||||||||||||||||||
| 8 | Electronic copy of approved submittals | ● | ● | |||||||||||||||||||
| (PDF format) 01 01 00-16.10 | ||||||||||||||||||||||
| 9 | Drinking Water Analysis Report | ● | ● | |||||||||||||||||||
| 01 02 00-3.3 | ||||||||||||||||||||||
| 10 | Storm Water Pollution Prev. Plan | ● | ● | |||||||||||||||||||
| 01 40 00-2.4.1 | ||||||||||||||||||||||
| 11 | Hazardous Material | ● | ● | |||||||||||||||||||
| 01 40 00-7.1 | ||||||||||||||||||||||
| 12 | Concrete Coloring | ● | ● | Include MSDS | ||||||||||||||||||
| 03 30 00-1.3.1a | ||||||||||||||||||||||
| 13 | Coloring | ● | ● | |||||||||||||||||||
| 03 30 00-1.3.2a | ||||||||||||||||||||||
| 14 | Curing Compound | ● | ||||||||||||||||||||
| 03 30 00-1.3.2b | ||||||||||||||||||||||
| 15 | Chemical Hardener | ● | ||||||||||||||||||||
| 03 30 00-1.3.2c | ||||||||||||||||||||||
| 16 | Joint Sealant | ● | ||||||||||||||||||||
| 03 30 00-1.3.2d | ||||||||||||||||||||||
| 17 | Slump | ● | ||||||||||||||||||||
| 03 30 00-1.3.3a | ||||||||||||||||||||||
| 18 | Strength | ● | ||||||||||||||||||||
| 03 30 00-1.3.3b | ||||||||||||||||||||||
| 19 | Copy Plumbing Contractor's License | ● | ||||||||||||||||||||
| 11 68 00-1.2.1a | ||||||||||||||||||||||
| 20 | Manufacturer's Qualifications | ● | ||||||||||||||||||||
| 11 68 00-1.2.1b | ||||||||||||||||||||||
| 21 | Installer's Qualifications | ● | ||||||||||||||||||||
| 11 68 00-1.2.1 c | ||||||||||||||||||||||
| 22 | Proj Record Docs (As-Builts - Pad) | ● | ● | |||||||||||||||||||
| 11 68 00-1.2.2a | ||||||||||||||||||||||
| 23 | Proj. Record Docs (As-Builts - Water | ● | ● | |||||||||||||||||||
| Mgt. System) 11 68 00-1.2.2b | ||||||||||||||||||||||
| 24 | Project Record Documents (As-Builts | ● | ● | |||||||||||||||||||
| Equipment Shed) 11 68 00-1.2.2c | ||||||||||||||||||||||
| 25 | Paints (Powder coat, metal roof, field | ● | ||||||||||||||||||||
| applied enamels) 11 68 00-1.2.3 | ||||||||||||||||||||||
| 26 | Installation (Play Features) | ● | ||||||||||||||||||||
| 11 68 00-1.2.4a | ||||||||||||||||||||||
| 27 | Installation (Electronic Operation Sys.) | ● | ||||||||||||||||||||
| 11 68 00-1.2.4b | ||||||||||||||||||||||
| 28 | Installation (Water Mgt. System) | ● | ||||||||||||||||||||
| 11 68 00-1.2.4c | ||||||||||||||||||||||
| 29 | Play Features | ● | ● | ● | ● | |||||||||||||||||
| 11 68 00-1.2.5a | ||||||||||||||||||||||
| 30 | Equipment Shed | ● | ● | ● | ● | Provide for pre-manufactured product in lieu of | ||||||||||||||||
| 11 68 00-1.2.5b | as-builts' for conventionally constructed structure | |||||||||||||||||||||
| 31 | Controller | ● | ● | ● | ● | Include wiring diagrams | ||||||||||||||||
| 11 68 00-1.2.5c | ||||||||||||||||||||||
| 32 | Switches & Motor Starters | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5d | ||||||||||||||||||||||
| 33 | Water Distribution Manifold | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5e | ||||||||||||||||||||||
| 34 | Valves (general duty and speciality) & | ● | ● | ● | ||||||||||||||||||
| Valve Boxes 11 68 00-1.2.5f | ||||||||||||||||||||||
| 35 | Solenoids | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5g | ||||||||||||||||||||||
| 36 | Meters | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5h | ||||||||||||||||||||||
| 37 | Drains, Diverter & Strainer | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5i | ||||||||||||||||||||||
| 38 | Water Treatment/Conditioning Devices | ● | ● | ● | ● | |||||||||||||||||
| 11 68 00-1.2.5j | ||||||||||||||||||||||
| 39 | Pipes, Tubing and Fittings | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5k | ||||||||||||||||||||||
| 40 | Doors, Frames & Hardware | ● | ● | ● | Door & Frame required for conventionally constructed | |||||||||||||||||
| 11 68 00-1.2.5l | structure. Door hardware required for both types. | |||||||||||||||||||||
| 41 | Interior Light Fixtures, Cages & Switch | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5m | ||||||||||||||||||||||
| 42 | Paint (factory powder coat) | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5n | ||||||||||||||||||||||
| 43 | Paint & Primer (field applied) | ● | ● | ● | Include MSDS data | |||||||||||||||||
| 11 68 00-1.2.50 | ||||||||||||||||||||||
| 44 | Splash Pad Rubber Surfacing and Turf | ● | ● | ● | ||||||||||||||||||
| 11 68 00-1.2.5p | ||||||||||||||||||||||
| 45 | Warranties (all materials & equipment) | ● | ● | |||||||||||||||||||
| 11 68 00-1.2.6 | ||||||||||||||||||||||
| 46 | Piping (Water pressure & leakage) | ● | ||||||||||||||||||||
| 11 68 00-1.2.7a | ||||||||||||||||||||||
| 47 | Controller operation | ● | ||||||||||||||||||||
| 11 68 00-1.2.7b | ||||||||||||||||||||||
| 48 | System Commissioning | ● | ||||||||||||||||||||
| 11 68 00-1.2.7c | ||||||||||||||||||||||
| 49 | Instructions | ● | ● | |||||||||||||||||||
| 11 68 00-1.2.8a | ||||||||||||||||||||||
| 50 | Parts List | ● | ● | |||||||||||||||||||
| 11 68 00-1.2.8b | ||||||||||||||||||||||
| 51 | Copy Electrical Contractor's License | ● | ||||||||||||||||||||
| 26 00 00-1.4.1 | ||||||||||||||||||||||
| 52 | Panelboard Layout & Wiring Diagrams | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.2 | ||||||||||||||||||||||
| 53 | Surge Arrester | ● | ||||||||||||||||||||
| 26 00 00-1.4.3a | ||||||||||||||||||||||
| 54 | Panelboard & Enclosure | ● | ||||||||||||||||||||
| 26 00 00-1.4.3b | ||||||||||||||||||||||
| 55 | Control & Protective Devices | ● | ||||||||||||||||||||
| 26 00 00-1.4.3c | ||||||||||||||||||||||
| 56 | Grounding Components | ● | ||||||||||||||||||||
| 26 00 00-1.4.3d | ||||||||||||||||||||||
| 57 | Insulated Wire | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.4a | ||||||||||||||||||||||
| 58 | Surge Arrester | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.4b | ||||||||||||||||||||||
| 59 | Panelboard & Enclosure | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.4c | ||||||||||||||||||||||
| 60 | Conrol & Protective Devices | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.4d | ||||||||||||||||||||||
| 61 | Conduit & Fittings | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.4e | ||||||||||||||||||||||
| 62 | Grounding Components | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.4f | ||||||||||||||||||||||
| 63 | Interior Light Fixture & Switches | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.4g | ||||||||||||||||||||||
| 64 | Warranties (all equipment) | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.5 | ||||||||||||||||||||||
| 65 | Panelboard: Continuity Test | ● | ||||||||||||||||||||
| 26 00 00-1.4.6a | ||||||||||||||||||||||
| 66 | Panelboard: Insulaton Test | ● | ||||||||||||||||||||
| 26 00 00-1.4.6b | ||||||||||||||||||||||
| 67 | Grounding Test: Resistance | ● | ||||||||||||||||||||
| 26 00 00-1.4.6c | ||||||||||||||||||||||
| 68 | Surge Arrester | ● | ||||||||||||||||||||
| 26 00 00-1.4.7a | ||||||||||||||||||||||
| 69 | Control & Protective Devices | ● | ||||||||||||||||||||
| 26 00 00-1.4.7b | ||||||||||||||||||||||
| 70 | Voltage Drop Calculations | ● | ||||||||||||||||||||
| 26 00 00-1.4.8a | ||||||||||||||||||||||
| 71 | Keys (enclosure doors) | ● | ● | |||||||||||||||||||
| 26 00 00-1.4.8b |