FA3030-12-B-0001.pdf
PDF 2 MB Posted
- Attached to
- FLOOR COVERING IDIQ
- Solicitation number
- FA3030-12-B-0001
About this file
Solicitation FA3030-12-B-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions from Contractor Corrected typos.pdf | ||
| Site Visit Details.pdf | ||
| FA3030-12-B-0001-0001.pdf | ||
| Questions from Contractor.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Floor Covering IDIQ Contract
ENTER PRICES IN SECTION B, USE TYPE WRITE OR BLACK INK.
This acquisition is being solicited as a 100% Small Business Set-Aside.
The magnitude of this project is betw een $1,00,000 and $5,000,000.
Offers are solicited only from those offerors w ho are neither debarred or suspended, nor proposed for debarment or suspension.
Verbal explanations given before aw ard WILL NOT BE BINDING. Any authorized changes w ill be made in w riting by issuing amendment(s).
Offers shall acknow ledge reciept of amendments in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) w ith the offer.
A Site Visit is scheduled for 21 Aug 12 at 9:30a.m. Offerors are encouraged to submit any questions concerning this solicitation no later than 5 business days prior to site visit, (See Section L, FAR 52.236-27 ALT I)
Contractor is responsible for making arrangements w ith the Contracting Office prior to the site visit to get temporary access to the base to attend the site visit.
X
TAYLOR W. HAILE (325) 654-4543
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
03-Aug-2012
(RFP)
(IFB)
CALL:
BASE FLOORING IDIQ
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________05 Sep 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
17TH CONTRACTING SQUADRON -FA3030
210 SCHERZ BLVD
BRENDA.SIZEMORE.1@US.AF.MIL
GOODFELLOW AFB TX 76908-4705
FA3030
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
JCGU 02-1400
8. ADDRESS OFFER TO (If Other Than Item 7)
(325) 654-5052FAX:TEL: (325) 654-3821 TEL: FAX:
FA3030-12-B-0001 287
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA3030-12-B-0001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 200 Labor Hours
Remove/Reinstall Movable Furniture
FFP
Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location FOB: Destination
NSN: Z2AA-FL-COV-RING
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 200 Labor
Remove/Reinstall Systems Furniture:
Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.
Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
0003 5,000 Square Foot
Remove/Dispose Of VCT W/ Mastic Or Sheet
Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
0004 5,000 Square
Provide New VCT:
Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
0005 5,000 Linear
Remove/Reinstall Wood Base Shoe/Board/Mo
Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold
UNIT UNIT PRICE MAX AMOUNT
0006 3,500 Square Yard
Remove/Dispose Of Glue Down Carpet:
Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
0007 UNDEFINED
Provide New Glue Down Carpet: Includes
FFP
Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
0007AA 50 Square
Type I, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AB 50 Square
Type II, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AC 50 Square
Type III, W/Cushion Back
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AD 50 Square
Type IV, W/Cushion Back
Type IV, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AE 50 Square
Type V, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AF 50 Square
Type VI, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AG 50 Square
Type VII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AH 50 Square
Type VIII, W/Cushion Back
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AJ 250 Square
Type IX, W/Cushion Back
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AK 50 Square
Type XI, W/Cushion Back
Type XI, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AL 50 Square
Type XII, W/ Cushion Back
Type XII, W/ Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AM 50 Square
Type XIII, W/Cushion Back
Type XIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0007AN 50 Square
Type I, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
0007AP 50 Square
Type IV, W/Action Back
Type IV, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
0007AQ 2,500 Square
Type IX, W/Action Back
Type IX, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
0008 50 Square
Remove/Dispose Of Stretch-In Carpet And
Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
0009 UNDEFINED Square
Provide New Carpet Tiles:
Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
0009AA 50 Square
Type I, W/Tile Back
Type I, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
0009AB 50 Square
Type III, W/Cushion Back
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0009AC 50 Square
Type VII, W/Cushion Back
Type VII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0009AD 50 Square
Type VIII, W/Cushion Back
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0009AE 50 Square
Type IX, W/Cushion Back
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0009AF 50 Square
Type X, W/O Cushion Back
Type X, W/O Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0009AG 50 Square
Type XII, W/Cushion Back
Type XII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
0009AH 500 Square
Type IX, W/Tile Back
Type IX, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
0010 7,500 Linear
Remove/Dispose Of Resilient Wall Base:
Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
0011 UNDEFINED
Provide New 4" Rubber Base:
FFP
UNIT UNIT PRICE MAX AMOUNT
0011AA 7,500 Linear
Provide New 4" Rubber Base:
Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
0011AB 200 Each Provide New 4" Rubber Base moulded outsi
FFP
Provide New 4" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
0012 UNDEFINED
Provide New 6" Rubber Base
FFP
3.25
UNIT UNIT PRICE MAX AMOUNT
0012AA 100 Linear
Provide New 6" Rubber Base
: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
0012AB 100 Each Provide New 6" Rubber Base moulded outsi
FFP
Provide New 6" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
0013 250 Square
Remove/Dispose Of Rubber Flooring:
Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
0014 500 Square
Provide New Solid Rubber Flooring:
Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
0015 1,000 Linear
Provide New Rubber Stair Treads/Risers:
Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
0016 1,000 Linear
Remove/Dispose Of Ceramic Tile Flooring:
Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
0017 UNDEFINED
Provide New Ceramic Tile Flooring Or Bas
FFP
Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
0017AA 500 Square
Mosaic Tile
UNIT UNIT PRICE MAX AMOUNT
0017AB 500 Square
Quarry Tile
Quarry Tile
UNIT UNIT PRICE MAX AMOUNT
0017AC 500 Square
Tile Base
Tile Base
UNIT UNIT PRICE MAX AMOUNT
0018 500 Square
Asbestos Removal, Complete
Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods
UNIT UNIT PRICE MAX AMOUNT
0019 UNDEFINED
Remove And Reinstall Toilet
FFP
Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials
UNIT UNIT PRICE MAX AMOUNT
0019AA 10 Each Stalls
FFP
Stalls
UNIT UNIT PRICE MAX AMOUNT
0019AB 10 Each Toilets
FFP
Toilets
UNIT UNIT PRICE MAX AMOUNT
0020 UNDEFINED
Provide Metal Reducer/Transition:
FFP
Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary
UNIT UNIT PRICE MAX AMOUNT
0020AA 500 Linear
1/2" Standard Pin Clampdown
1/2" Standard Pin Clampdown
UNIT UNIT PRICE MAX AMOUNT
0020AB 500 Linear
1/2" Standard Pinless Clampdown
1/2" Standard Pinless Clampdown
UNIT UNIT PRICE MAX AMOUNT
0020AC 500 Linear
1 1/2" Binder Bar (Flat Metal)
1 1/2" Binder Bar (Flat Metal)
UNIT UNIT PRICE MAX AMOUNT
0020AD 500 Linear
1 1/2" Rubber Transition
UNIT UNIT PRICE MAX AMOUNT
0021 UNDEFINED
Provide Installation Of GFE: Includes Tr
FFP
Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.
UNIT UNIT PRICE MAX AMOUNT
0021AA 100 Square
VCT - Includes Stripping And Applying Wa
VCT - Includes Stripping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
0021AB 100 Square
Broadloom Glue Down Carpet
Broadloom Glue Down Carpet
UNIT UNIT PRICE MAX AMOUNT
0021AC 100 Square
Carpet Tiles
Carpet Tiles
UNIT UNIT PRICE MAX AMOUNT
0021AD 100 Linear
Cove Base
Cove Base
UNIT UNIT PRICE MAX AMOUNT
0022 5 Each Moisture Tests
FFP
UNIT UNIT PRICE MAX AMOUNT
0023 100 Bag Major Floor Prep beyond 1/8" in 10 ft
FFP
Major Floor Prep beyond 1/8" in 10 ft
UNIT UNIT PRICE MAX AMOUNT
0024 50 Square
Re-stretch existing carpet
Re-stretch existing carpet
UNIT UNIT PRICE MAX AMOUNT
1001 200 Labor
OPTION Remove/Reinstall Movable Furniture
Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
1002 200 Labor
OPTION Remove/Reinstall Systems Furniture:
Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.
Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
1003 5,000 Square
OPTION Remove/Dispose Of VCT W/ Mastic Or Sheet
Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
1004 5,000 Square
OPTION Provide New VCT:
Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
1005 5,000 Linear
OPTION Remove/Reinstall Wood Base Shoe/Board/Mo
Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold
UNIT UNIT PRICE MAX AMOUNT
1006 3,500 Square
OPTION Remove/Dispose Of Glue Down Carpet:
Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
1007 UNDEFINED
OPTION Provide New Glue Down Carpet: Includes
FFP
Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
1007AA 50 Square
OPTION Type I, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AB 50 Square
OPTION Type II, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AC 50 Square
OPTION Type III, W/Cushion Back
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AD 50 Square
OPTION Type IV, W/Cushion Back
Type IV, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AE 50 Square
OPTION Type V, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AF 50 Square
OPTION Type VI, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AG 50 Square
OPTION Type VII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AH 50 Square
OPTION Type VIII, W/Cushion Back
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AJ 250 Square
OPTION Type IX, W/Cushion Back
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AK 50 Square
OPTION Type XI, W/Cushion Back
Type XI, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AL 50 Square
OPTION Type XII, W/ Cushion Back
Type XII, W/ Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AM 50 Square
OPTION Type XIII, W/Cushion Back
Type XIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1007AN 50 Square
OPTION Type I, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
1007AP 50 Square
OPTION Type IV, W/Action Back
Type IV, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
1007AQ 2,500 Square
OPTION Type IX, W/Action Back
Type IX, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
1008 50 Square
OPTION Remove/Dispose Of Stretch-In Carpet And
Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
1009 UNDEFINED Square
OPTION Provide New Carpet Tiles:
Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
1009AA 50 Square
OPTION Type I, W/Tile Back
Type I, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
1009AB 50 Square
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1009AC 50 Square
Type VII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1009AD 50 Square
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1009AE 50 Square
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1009AF 50 Square
OPTION Type X, W/O Cushion Back
Type X, W/O Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1009AG 50 Square
OPTION Type XII, W/Cushion Back
Type XII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
1009AH 500 Square
OPTION Type IX, W/Tile Back
Type IX, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
1010 7,500 Linear
OPTION Remove/Dispose Of Resilient Wall Base:
Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
1011 UNDEFINED
OPTION Provide New 4" Rubber Base:
FFP
UNIT UNIT PRICE MAX AMOUNT
1011AA 7,500 Linear
OPTION Provide New 4" Rubber Base:
Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
1011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi
FFP
Provide New 4" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
1012 UNDEFINED
OPTION Provide New 6" Rubber Base
FFP
UNIT UNIT PRICE MAX AMOUNT
1012AA 100 Linear
OPTION Provide New 6" Rubber Base
: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
1012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi
FFP
Provide New 6" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
1013 250 Square
OPTION Remove/Dispose Of Rubber Flooring:
Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
1014 500 Square
OPTION Provide New Solid Rubber Flooring:
Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
1015 1,000 Linear
OPTION Provide New Rubber Stair Treads/Risers:
Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
1016 1,000 Linear
OPTION Remove/Dispose Of Ceramic Tile Flooring:
Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
1017 UNDEFINED
OPTION Provide New Ceramic Tile Flooring Or Bas
FFP
Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
1017AA 500 Square
OPTION Mosaic Tile
UNIT UNIT PRICE MAX AMOUNT
1017AB 500 Square
OPTION Quarry Tile
Quarry Tile
UNIT UNIT PRICE MAX AMOUNT
1017AC 500 Square
OPTION Tile Base
Tile Base
UNIT UNIT PRICE MAX AMOUNT
1018 500 Square
OPTION Asbestos Removal, Complete
Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods
UNIT UNIT PRICE MAX AMOUNT
1019 UNDEFINED
OPTION Remove And Reinstall Toilet
FFP
Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials
UNIT UNIT PRICE MAX AMOUNT
1019AA 10 Each OPTION Stalls
FFP
Stalls
UNIT UNIT PRICE MAX AMOUNT
1019AB 10 Each OPTION Toilets
FFP
Toilets
UNIT UNIT PRICE MAX AMOUNT
1020 UNDEFINED
OPTION Provide Metal Reducer/Transition:
FFP
Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary
UNIT UNIT PRICE MAX AMOUNT
1020AA 500 Linear
OPTION 1/2" Standard Pin Clampdown
1/2" Standard Pin Clampdown
UNIT UNIT PRICE MAX AMOUNT
1020AB 500 Linear
OPTION 1/2" Standard Pinless Clampdown
1/2" Standard Pinless Clampdown
UNIT UNIT PRICE MAX AMOUNT
1020AC 500 Linear
OPTION 1 1/2" Binder Bar (Flat Metal)
1 1/2" Binder Bar (Flat Metal)
UNIT UNIT PRICE MAX AMOUNT
1020AD 500 Linear
OPTION 1 1/2" Rubber Transition
UNIT UNIT PRICE MAX AMOUNT
1021 UNDEFINED
OPTION Provide Installation Of GFE: Includes Tr
FFP
Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.
UNIT UNIT PRICE MAX AMOUNT
1021AA 100 Square
OPTION VCT - Includes Stripping And Applying Wa
VCT - Includes Stripping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
1021AB 100 Square
OPTION Broadloom Glue Down Carpet
Broadloom Glue Down Carpet
UNIT UNIT PRICE MAX AMOUNT
1021AC 100 Square
OPTION Carpet Tiles
Carpet Tiles
UNIT UNIT PRICE MAX AMOUNT
1021AD 100 Linear
OPTION Cove Base
Cove Base
UNIT UNIT PRICE MAX AMOUNT
1022 5 Each OPTION Moisture Tests
FFP
UNIT UNIT PRICE MAX AMOUNT
1023 100 Bag OPTION Major Floor Prep beyond 1/8" in 10 ft
FFP
Major Floor Prep beyond 1/8" in 10 ft
UNIT UNIT PRICE MAX AMOUNT
1024 50 Square
OPTION Re-stretch existing carpet
Re-stretch existing carpet
UNIT UNIT PRICE MAX AMOUNT
2001 200 Labor
Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
2002 200 Labor
Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.
Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
2003 5,000 Square
Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
2004 5,000 Square
Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
2005 5,000 Linear
Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold
UNIT UNIT PRICE MAX AMOUNT
2006 3,500 Square
Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
2007 UNDEFINED
OPTION Provide New Glue Down Carpet: Includes
FFP
Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
2007AA 50 Square
UNIT UNIT PRICE MAX AMOUNT
2007AB 50 Square
UNIT UNIT PRICE MAX AMOUNT
2007AC 50 Square
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2007AD 50 Square
Type IV, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2007AE 50 Square
UNIT UNIT PRICE MAX AMOUNT
2007AF 50 Square
UNIT UNIT PRICE MAX AMOUNT
2007AG 50 Square
UNIT UNIT PRICE MAX AMOUNT
2007AH 50 Square
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2007AJ 250 Square
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2007AK 50 Square
Type XI, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2007AL 50 Square
Type XII, W/ Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2007AM 50 Square
Type XIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2007AN 50 Square
UNIT UNIT PRICE MAX AMOUNT
2007AP 50 Square
Type IV, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
2007AQ 2,500 Square
Type IX, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
2008 50 Square
Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
2009 UNDEFINED Square
Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
2009AA 50 Square
Type I, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
2009AB 50 Square
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2009AC 50 Square
Type VII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2009AD 50 Square
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2009AE 50 Square
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2009AF 50 Square
Type X, W/O Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2009AG 50 Square
Type XII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
2009AH 500 Square
Type IX, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
2010 7,500 Linear
Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
2011 UNDEFINED
OPTION Provide New 4" Rubber Base:
FFP
UNIT UNIT PRICE MAX AMOUNT
2011AA 7,500 Linear
Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
2011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi
FFP
Provide New 4" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
2012 UNDEFINED
OPTION Provide New 6" Rubber Base
FFP
UNIT UNIT PRICE MAX AMOUNT
2012AA 100 Linear
: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
2012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi
FFP
Provide New 6" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
2013 250 Square
Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
2014 500 Square
Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
2015 1,000 Linear
Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
2016 1,000 Linear
Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
2017 UNDEFINED
OPTION Provide New Ceramic Tile Flooring Or Bas
FFP
Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
2017AA 500 Square
UNIT UNIT PRICE MAX AMOUNT
2017AB 500 Square
Quarry Tile
UNIT UNIT PRICE MAX AMOUNT
2017AC 500 Square
Tile Base
UNIT UNIT PRICE MAX AMOUNT
2018 500 Square
Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods
UNIT UNIT PRICE MAX AMOUNT
2019 UNDEFINED
OPTION Remove And Reinstall Toilet
FFP
Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials
UNIT UNIT PRICE MAX AMOUNT
2019AA 10 Each OPTION Stalls
FFP
Stalls
UNIT UNIT PRICE MAX AMOUNT
2019AB 10 Each OPTION Toilets
FFP
Toilets
UNIT UNIT PRICE MAX AMOUNT
2020 UNDEFINED
OPTION Provide Metal Reducer/Transition:
FFP
Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary
UNIT UNIT PRICE MAX AMOUNT
2020AA 500 Linear
1/2" Standard Pin Clampdown
UNIT UNIT PRICE MAX AMOUNT
2020AB 500 Linear
1/2" Standard Pinless Clampdown
UNIT UNIT PRICE MAX AMOUNT
2020AC 500 Linear
1 1/2" Binder Bar (Flat Metal)
UNIT UNIT PRICE MAX AMOUNT
2020AD 500 Linear
UNIT UNIT PRICE MAX AMOUNT
2021 UNDEFINED
OPTION Provide Installation Of GFE: Includes Tr
FFP
Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.
UNIT UNIT PRICE MAX AMOUNT
2021AA 100 Square
VCT - Includes Stripping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
2021AB 100 Square
Broadloom Glue Down Carpet
UNIT UNIT PRICE MAX AMOUNT
2021AC 100 Square
Carpet Tiles
UNIT UNIT PRICE MAX AMOUNT
2021AD 100 Linear
Cove Base
UNIT UNIT PRICE MAX AMOUNT
2022 5 Each OPTION Moisture Tests
FFP
UNIT UNIT PRICE MAX AMOUNT
2023 100 Bag OPTION Major Floor Prep beyond 1/8" in 10 ft
FFP
Major Floor Prep beyond 1/8" in 10 ft
UNIT UNIT PRICE MAX AMOUNT
2024 50 Square
Re-stretch existing carpet
UNIT UNIT PRICE MAX AMOUNT
3001 200 Labor
Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
3002 200 Labor
Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.
Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
3003 5,000 Square
Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
3004 5,000 Square
Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
3005 5,000 Linear
Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold
UNIT UNIT PRICE MAX AMOUNT
3006 3,500 Square
Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
3007 UNDEFINED
OPTION Provide New Glue Down Carpet: Includes
FFP
Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
3007AA 50 Square
UNIT UNIT PRICE MAX AMOUNT
3007AB 50 Square
UNIT UNIT PRICE MAX AMOUNT
3007AC 50 Square
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3007AD 50 Square
Type IV, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3007AE 50 Square
UNIT UNIT PRICE MAX AMOUNT
3007AF 50 Square
UNIT UNIT PRICE MAX AMOUNT
3007AG 50 Square
UNIT UNIT PRICE MAX AMOUNT
3007AH 50 Square
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3007AJ 250 Square
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3007AK 50 Square
Type XI, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3007AL 50 Square
Type XII, W/ Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3007AM 50 Square
Type XIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3007AN 50 Square
UNIT UNIT PRICE MAX AMOUNT
3007AP 50 Square
Type IV, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
3007AQ 2,500 Square
Type IX, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
3008 50 Square
Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
3009 UNDEFINED Square
Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
3009AA 50 Square
Type I, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
3009AB 50 Square
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3009AC 50 Square
Type VII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3009AD 50 Square
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3009AE 50 Square
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3009AF 50 Square
Type X, W/O Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3009AG 50 Square
Type XII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
3009AH 500 Square
Type IX, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
3010 7,500 Linear
Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
3011 UNDEFINED
OPTION Provide New 4" Rubber Base:
FFP
UNIT UNIT PRICE MAX AMOUNT
3011AA 7,500 Linear
Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
3011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi
FFP
Provide New 4" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
3012 UNDEFINED
OPTION Provide New 6" Rubber Base
FFP
UNIT UNIT PRICE MAX AMOUNT
3012AA 100 Linear
: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
3012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi
FFP
Provide New 6" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
3013 250 Square
Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
3014 500 Square
Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
3015 1,000 Linear
Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
3016 1,000 Linear
Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
3017 UNDEFINED
OPTION Provide New Ceramic Tile Flooring Or Bas
FFP
Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
3017AA 500 Square
UNIT UNIT PRICE MAX AMOUNT
3017AB 500 Square
Quarry Tile
UNIT UNIT PRICE MAX AMOUNT
3017AC 500 Square
Tile Base
UNIT UNIT PRICE MAX AMOUNT
3018 500 Square
Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods
UNIT UNIT PRICE MAX AMOUNT
3019 UNDEFINED
OPTION Remove And Reinstall Toilet
FFP
Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials
UNIT UNIT PRICE MAX AMOUNT
3019AA 10 Each OPTION Stalls
FFP
Stalls
UNIT UNIT PRICE MAX AMOUNT
3019AB 10 Each OPTION Toilets
FFP
Toilets
UNIT UNIT PRICE MAX AMOUNT
3020 UNDEFINED
OPTION Provide Metal Reducer/Transition:
FFP
Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary
UNIT UNIT PRICE MAX AMOUNT
3020AA 500 Linear
1/2" Standard Pin Clampdown
UNIT UNIT PRICE MAX AMOUNT
3020AB 500 Linear
1/2" Standard Pinless Clampdown
UNIT UNIT PRICE MAX AMOUNT
3020AC 500 Linear
1 1/2" Binder Bar (Flat Metal)
UNIT UNIT PRICE MAX AMOUNT
3020AD 500 Linear
UNIT UNIT PRICE MAX AMOUNT
3021 UNDEFINED
OPTION Provide Installation Of GFE: Includes Tr
FFP
Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.
UNIT UNIT PRICE MAX AMOUNT
3021AA 100 Square
VCT - Includes Stripping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
3021AB 100 Square
Broadloom Glue Down Carpet
UNIT UNIT PRICE MAX AMOUNT
3021AC 100 Square
Carpet Tiles
UNIT UNIT PRICE MAX AMOUNT
3021AD 100 Linear
Cove Base
UNIT UNIT PRICE MAX AMOUNT
3022 5 Each OPTION Moisture Tests
FFP
UNIT UNIT PRICE MAX AMOUNT
3023 100 Bag OPTION Major Floor Prep beyond 1/8" in 10 ft
FFP
Major Floor Prep beyond 1/8" in 10 ft
UNIT UNIT PRICE MAX AMOUNT
3024 50 Square
Re-stretch existing carpet
UNIT UNIT PRICE MAX AMOUNT
4001 200 Labor
Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
4002 200 Labor
Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.
Furniture Shall Be Moved And Reinstalled To The Original Location
UNIT UNIT PRICE MAX AMOUNT
4003 5,000 Square
Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
4004 5,000 Square
Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant
UNIT UNIT PRICE MAX AMOUNT
4005 5,000 Linear
Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold
UNIT UNIT PRICE MAX AMOUNT
4006 3,500 Square
Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
4007 UNDEFINED
OPTION Provide New Glue Down Carpet: Includes
FFP
Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
4007AA 50 Square
UNIT UNIT PRICE MAX AMOUNT
4007AB 50 Square
UNIT UNIT PRICE MAX AMOUNT
4007AC 50 Square
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4007AD 50 Square
Type IV, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4007AE 50 Square
UNIT UNIT PRICE MAX AMOUNT
4007AF 50 Square
UNIT UNIT PRICE MAX AMOUNT
4007AG 50 Square
UNIT UNIT PRICE MAX AMOUNT
4007AH 50 Square
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4007AJ 250 Square
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4007AK 50 Square
Type XI, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4007AL 50 Square
Type XII, W/ Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4007AM 50 Square
Type XIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4007AN 50 Square
UNIT UNIT PRICE MAX AMOUNT
4007AP 50 Square
Type IV, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
4007AQ 2,500 Square
Type IX, W/Action Back
UNIT UNIT PRICE MAX AMOUNT
4008 50 Square
Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
4009 UNDEFINED Square
Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
4009AA 50 Square
Type I, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
4009AB 50 Square
Type III, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4009AC 50 Square
Type VII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4009AD 50 Square
Type VIII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4009AE 50 Square
Type IX, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4009AF 50 Square
Type X, W/O Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4009AG 50 Square
Type XII, W/Cushion Back
UNIT UNIT PRICE MAX AMOUNT
4009AH 500 Square
Type IX, W/Tile Back
UNIT UNIT PRICE MAX AMOUNT
4010 7,500 Linear
Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
4011 UNDEFINED
OPTION Provide New 4" Rubber Base:
FFP
UNIT UNIT PRICE MAX AMOUNT
4011AA 7,500 Linear
Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
4011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi
FFP
Provide New 4" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
4012 UNDEFINED
OPTION Provide New 6" Rubber Base
FFP
UNIT UNIT PRICE MAX AMOUNT
4012AA 100 Linear
: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
4012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi
FFP
Provide New 6" Rubber Base moulded outside corners
UNIT UNIT PRICE MAX AMOUNT
4013 250 Square
Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
4014 500 Square
Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
4015 1,000 Linear
Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation
UNIT UNIT PRICE MAX AMOUNT
4016 1,000 Linear
Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required
UNIT UNIT PRICE MAX AMOUNT
4017 UNDEFINED
OPTION Provide New Ceramic Tile Flooring Or Bas
Provide New Cerami
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .