FA3030-12-B-0001.pdf

PDF 2 MB Posted

Attached to
FLOOR COVERING IDIQ
Solicitation number
FA3030-12-B-0001
Issued by

About this file

Solicitation FA3030-12-B-0001

View the file

Other files

File Type Posted
Questions from Contractor Corrected typos.pdf PDF
Site Visit Details.pdf PDF
FA3030-12-B-0001-0001.pdf PDF
Questions from Contractor.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Floor Covering IDIQ Contract

ENTER PRICES IN SECTION B, USE TYPE WRITE OR BLACK INK.

This acquisition is being solicited as a 100% Small Business Set-Aside.

The magnitude of this project is betw een $1,00,000 and $5,000,000.

Offers are solicited only from those offerors w ho are neither debarred or suspended, nor proposed for debarment or suspension.

Verbal explanations given before aw ard WILL NOT BE BINDING. Any authorized changes w ill be made in w riting by issuing amendment(s).

Offers shall acknow ledge reciept of amendments in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) w ith the offer.

A Site Visit is scheduled for 21 Aug 12 at 9:30a.m. Offerors are encouraged to submit any questions concerning this solicitation no later than 5 business days prior to site visit, (See Section L, FAR 52.236-27 ALT I)

Contractor is responsible for making arrangements w ith the Contracting Office prior to the site visit to get temporary access to the base to attend the site visit.

X

TAYLOR W. HAILE (325) 654-4543

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

03-Aug-2012

(RFP)

(IFB)

CALL:

BASE FLOORING IDIQ

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________05 Sep 2012 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

17TH CONTRACTING SQUADRON -FA3030

210 SCHERZ BLVD

BRENDA.SIZEMORE.1@US.AF.MIL

GOODFELLOW AFB TX 76908-4705

FA3030

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

JCGU 02-1400

8. ADDRESS OFFER TO (If Other Than Item 7)

(325) 654-5052FAX:TEL: (325) 654-3821 TEL: FAX:

FA3030-12-B-0001 287

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA3030-12-B-0001

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 200 Labor Hours

Remove/Reinstall Movable Furniture

FFP

Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location FOB: Destination

NSN: Z2AA-FL-COV-RING

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 200 Labor

Remove/Reinstall Systems Furniture:

Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.

Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

0003 5,000 Square Foot

Remove/Dispose Of VCT W/ Mastic Or Sheet

Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

0004 5,000 Square

Provide New VCT:

Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

0005 5,000 Linear

Remove/Reinstall Wood Base Shoe/Board/Mo

Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold

UNIT UNIT PRICE MAX AMOUNT

0006 3,500 Square Yard

Remove/Dispose Of Glue Down Carpet:

Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

0007 UNDEFINED

Provide New Glue Down Carpet: Includes

FFP

Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

0007AA 50 Square

Type I, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AB 50 Square

Type II, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AC 50 Square

Type III, W/Cushion Back

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AD 50 Square

Type IV, W/Cushion Back

Type IV, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AE 50 Square

Type V, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AF 50 Square

Type VI, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AG 50 Square

Type VII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AH 50 Square

Type VIII, W/Cushion Back

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AJ 250 Square

Type IX, W/Cushion Back

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AK 50 Square

Type XI, W/Cushion Back

Type XI, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AL 50 Square

Type XII, W/ Cushion Back

Type XII, W/ Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AM 50 Square

Type XIII, W/Cushion Back

Type XIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0007AN 50 Square

Type I, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

0007AP 50 Square

Type IV, W/Action Back

Type IV, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

0007AQ 2,500 Square

Type IX, W/Action Back

Type IX, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

0008 50 Square

Remove/Dispose Of Stretch-In Carpet And

Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

0009 UNDEFINED Square

Provide New Carpet Tiles:

Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

0009AA 50 Square

Type I, W/Tile Back

Type I, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

0009AB 50 Square

Type III, W/Cushion Back

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0009AC 50 Square

Type VII, W/Cushion Back

Type VII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0009AD 50 Square

Type VIII, W/Cushion Back

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0009AE 50 Square

Type IX, W/Cushion Back

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0009AF 50 Square

Type X, W/O Cushion Back

Type X, W/O Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0009AG 50 Square

Type XII, W/Cushion Back

Type XII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

0009AH 500 Square

Type IX, W/Tile Back

Type IX, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

0010 7,500 Linear

Remove/Dispose Of Resilient Wall Base:

Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

0011 UNDEFINED

Provide New 4" Rubber Base:

FFP

UNIT UNIT PRICE MAX AMOUNT

0011AA 7,500 Linear

Provide New 4" Rubber Base:

Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

0011AB 200 Each Provide New 4" Rubber Base moulded outsi

FFP

Provide New 4" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

0012 UNDEFINED

Provide New 6" Rubber Base

FFP

3.25

UNIT UNIT PRICE MAX AMOUNT

0012AA 100 Linear

Provide New 6" Rubber Base

: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

0012AB 100 Each Provide New 6" Rubber Base moulded outsi

FFP

Provide New 6" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

0013 250 Square

Remove/Dispose Of Rubber Flooring:

Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

0014 500 Square

Provide New Solid Rubber Flooring:

Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

0015 1,000 Linear

Provide New Rubber Stair Treads/Risers:

Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

0016 1,000 Linear

Remove/Dispose Of Ceramic Tile Flooring:

Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

0017 UNDEFINED

Provide New Ceramic Tile Flooring Or Bas

FFP

Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

0017AA 500 Square

Mosaic Tile

UNIT UNIT PRICE MAX AMOUNT

0017AB 500 Square

Quarry Tile

Quarry Tile

UNIT UNIT PRICE MAX AMOUNT

0017AC 500 Square

Tile Base

Tile Base

UNIT UNIT PRICE MAX AMOUNT

0018 500 Square

Asbestos Removal, Complete

Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods

UNIT UNIT PRICE MAX AMOUNT

0019 UNDEFINED

Remove And Reinstall Toilet

FFP

Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials

UNIT UNIT PRICE MAX AMOUNT

0019AA 10 Each Stalls

FFP

Stalls

UNIT UNIT PRICE MAX AMOUNT

0019AB 10 Each Toilets

FFP

Toilets

UNIT UNIT PRICE MAX AMOUNT

0020 UNDEFINED

Provide Metal Reducer/Transition:

FFP

Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary

UNIT UNIT PRICE MAX AMOUNT

0020AA 500 Linear

1/2" Standard Pin Clampdown

1/2" Standard Pin Clampdown

UNIT UNIT PRICE MAX AMOUNT

0020AB 500 Linear

1/2" Standard Pinless Clampdown

1/2" Standard Pinless Clampdown

UNIT UNIT PRICE MAX AMOUNT

0020AC 500 Linear

1 1/2" Binder Bar (Flat Metal)

1 1/2" Binder Bar (Flat Metal)

UNIT UNIT PRICE MAX AMOUNT

0020AD 500 Linear

1 1/2" Rubber Transition

UNIT UNIT PRICE MAX AMOUNT

0021 UNDEFINED

Provide Installation Of GFE: Includes Tr

FFP

Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.

UNIT UNIT PRICE MAX AMOUNT

0021AA 100 Square

VCT - Includes Stripping And Applying Wa

VCT - Includes Stripping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

0021AB 100 Square

Broadloom Glue Down Carpet

Broadloom Glue Down Carpet

UNIT UNIT PRICE MAX AMOUNT

0021AC 100 Square

Carpet Tiles

Carpet Tiles

UNIT UNIT PRICE MAX AMOUNT

0021AD 100 Linear

Cove Base

Cove Base

UNIT UNIT PRICE MAX AMOUNT

0022 5 Each Moisture Tests

FFP

UNIT UNIT PRICE MAX AMOUNT

0023 100 Bag Major Floor Prep beyond 1/8" in 10 ft

FFP

Major Floor Prep beyond 1/8" in 10 ft

UNIT UNIT PRICE MAX AMOUNT

0024 50 Square

Re-stretch existing carpet

Re-stretch existing carpet

UNIT UNIT PRICE MAX AMOUNT

1001 200 Labor

OPTION Remove/Reinstall Movable Furniture

Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

1002 200 Labor

OPTION Remove/Reinstall Systems Furniture:

Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.

Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

1003 5,000 Square

OPTION Remove/Dispose Of VCT W/ Mastic Or Sheet

Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

1004 5,000 Square

OPTION Provide New VCT:

Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

1005 5,000 Linear

OPTION Remove/Reinstall Wood Base Shoe/Board/Mo

Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold

UNIT UNIT PRICE MAX AMOUNT

1006 3,500 Square

OPTION Remove/Dispose Of Glue Down Carpet:

Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

1007 UNDEFINED

OPTION Provide New Glue Down Carpet: Includes

FFP

Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

1007AA 50 Square

OPTION Type I, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AB 50 Square

OPTION Type II, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AC 50 Square

OPTION Type III, W/Cushion Back

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AD 50 Square

OPTION Type IV, W/Cushion Back

Type IV, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AE 50 Square

OPTION Type V, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AF 50 Square

OPTION Type VI, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AG 50 Square

OPTION Type VII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AH 50 Square

OPTION Type VIII, W/Cushion Back

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AJ 250 Square

OPTION Type IX, W/Cushion Back

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AK 50 Square

OPTION Type XI, W/Cushion Back

Type XI, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AL 50 Square

OPTION Type XII, W/ Cushion Back

Type XII, W/ Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AM 50 Square

OPTION Type XIII, W/Cushion Back

Type XIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1007AN 50 Square

OPTION Type I, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

1007AP 50 Square

OPTION Type IV, W/Action Back

Type IV, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

1007AQ 2,500 Square

OPTION Type IX, W/Action Back

Type IX, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

1008 50 Square

OPTION Remove/Dispose Of Stretch-In Carpet And

Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

1009 UNDEFINED Square

OPTION Provide New Carpet Tiles:

Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

1009AA 50 Square

OPTION Type I, W/Tile Back

Type I, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

1009AB 50 Square

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1009AC 50 Square

Type VII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1009AD 50 Square

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1009AE 50 Square

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1009AF 50 Square

OPTION Type X, W/O Cushion Back

Type X, W/O Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1009AG 50 Square

OPTION Type XII, W/Cushion Back

Type XII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

1009AH 500 Square

OPTION Type IX, W/Tile Back

Type IX, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

1010 7,500 Linear

OPTION Remove/Dispose Of Resilient Wall Base:

Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

1011 UNDEFINED

OPTION Provide New 4" Rubber Base:

FFP

UNIT UNIT PRICE MAX AMOUNT

1011AA 7,500 Linear

OPTION Provide New 4" Rubber Base:

Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

1011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi

FFP

Provide New 4" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

1012 UNDEFINED

OPTION Provide New 6" Rubber Base

FFP

UNIT UNIT PRICE MAX AMOUNT

1012AA 100 Linear

OPTION Provide New 6" Rubber Base

: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

1012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi

FFP

Provide New 6" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

1013 250 Square

OPTION Remove/Dispose Of Rubber Flooring:

Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

1014 500 Square

OPTION Provide New Solid Rubber Flooring:

Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

1015 1,000 Linear

OPTION Provide New Rubber Stair Treads/Risers:

Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

1016 1,000 Linear

OPTION Remove/Dispose Of Ceramic Tile Flooring:

Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

1017 UNDEFINED

OPTION Provide New Ceramic Tile Flooring Or Bas

FFP

Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

1017AA 500 Square

OPTION Mosaic Tile

UNIT UNIT PRICE MAX AMOUNT

1017AB 500 Square

OPTION Quarry Tile

Quarry Tile

UNIT UNIT PRICE MAX AMOUNT

1017AC 500 Square

OPTION Tile Base

Tile Base

UNIT UNIT PRICE MAX AMOUNT

1018 500 Square

OPTION Asbestos Removal, Complete

Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods

UNIT UNIT PRICE MAX AMOUNT

1019 UNDEFINED

OPTION Remove And Reinstall Toilet

FFP

Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials

UNIT UNIT PRICE MAX AMOUNT

1019AA 10 Each OPTION Stalls

FFP

Stalls

UNIT UNIT PRICE MAX AMOUNT

1019AB 10 Each OPTION Toilets

FFP

Toilets

UNIT UNIT PRICE MAX AMOUNT

1020 UNDEFINED

OPTION Provide Metal Reducer/Transition:

FFP

Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary

UNIT UNIT PRICE MAX AMOUNT

1020AA 500 Linear

OPTION 1/2" Standard Pin Clampdown

1/2" Standard Pin Clampdown

UNIT UNIT PRICE MAX AMOUNT

1020AB 500 Linear

OPTION 1/2" Standard Pinless Clampdown

1/2" Standard Pinless Clampdown

UNIT UNIT PRICE MAX AMOUNT

1020AC 500 Linear

OPTION 1 1/2" Binder Bar (Flat Metal)

1 1/2" Binder Bar (Flat Metal)

UNIT UNIT PRICE MAX AMOUNT

1020AD 500 Linear

OPTION 1 1/2" Rubber Transition

UNIT UNIT PRICE MAX AMOUNT

1021 UNDEFINED

OPTION Provide Installation Of GFE: Includes Tr

FFP

Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.

UNIT UNIT PRICE MAX AMOUNT

1021AA 100 Square

OPTION VCT - Includes Stripping And Applying Wa

VCT - Includes Stripping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

1021AB 100 Square

OPTION Broadloom Glue Down Carpet

Broadloom Glue Down Carpet

UNIT UNIT PRICE MAX AMOUNT

1021AC 100 Square

OPTION Carpet Tiles

Carpet Tiles

UNIT UNIT PRICE MAX AMOUNT

1021AD 100 Linear

OPTION Cove Base

Cove Base

UNIT UNIT PRICE MAX AMOUNT

1022 5 Each OPTION Moisture Tests

FFP

UNIT UNIT PRICE MAX AMOUNT

1023 100 Bag OPTION Major Floor Prep beyond 1/8" in 10 ft

FFP

Major Floor Prep beyond 1/8" in 10 ft

UNIT UNIT PRICE MAX AMOUNT

1024 50 Square

OPTION Re-stretch existing carpet

Re-stretch existing carpet

UNIT UNIT PRICE MAX AMOUNT

2001 200 Labor

Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

2002 200 Labor

Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.

Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

2003 5,000 Square

Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

2004 5,000 Square

Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

2005 5,000 Linear

Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold

UNIT UNIT PRICE MAX AMOUNT

2006 3,500 Square

Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

2007 UNDEFINED

OPTION Provide New Glue Down Carpet: Includes

FFP

Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

2007AA 50 Square

UNIT UNIT PRICE MAX AMOUNT

2007AB 50 Square

UNIT UNIT PRICE MAX AMOUNT

2007AC 50 Square

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2007AD 50 Square

Type IV, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2007AE 50 Square

UNIT UNIT PRICE MAX AMOUNT

2007AF 50 Square

UNIT UNIT PRICE MAX AMOUNT

2007AG 50 Square

UNIT UNIT PRICE MAX AMOUNT

2007AH 50 Square

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2007AJ 250 Square

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2007AK 50 Square

Type XI, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2007AL 50 Square

Type XII, W/ Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2007AM 50 Square

Type XIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2007AN 50 Square

UNIT UNIT PRICE MAX AMOUNT

2007AP 50 Square

Type IV, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

2007AQ 2,500 Square

Type IX, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

2008 50 Square

Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

2009 UNDEFINED Square

Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

2009AA 50 Square

Type I, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

2009AB 50 Square

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2009AC 50 Square

Type VII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2009AD 50 Square

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2009AE 50 Square

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2009AF 50 Square

Type X, W/O Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2009AG 50 Square

Type XII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

2009AH 500 Square

Type IX, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

2010 7,500 Linear

Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

2011 UNDEFINED

OPTION Provide New 4" Rubber Base:

FFP

UNIT UNIT PRICE MAX AMOUNT

2011AA 7,500 Linear

Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

2011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi

FFP

Provide New 4" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

2012 UNDEFINED

OPTION Provide New 6" Rubber Base

FFP

UNIT UNIT PRICE MAX AMOUNT

2012AA 100 Linear

: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

2012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi

FFP

Provide New 6" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

2013 250 Square

Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

2014 500 Square

Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

2015 1,000 Linear

Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

2016 1,000 Linear

Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

2017 UNDEFINED

OPTION Provide New Ceramic Tile Flooring Or Bas

FFP

Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

2017AA 500 Square

UNIT UNIT PRICE MAX AMOUNT

2017AB 500 Square

Quarry Tile

UNIT UNIT PRICE MAX AMOUNT

2017AC 500 Square

Tile Base

UNIT UNIT PRICE MAX AMOUNT

2018 500 Square

Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods

UNIT UNIT PRICE MAX AMOUNT

2019 UNDEFINED

OPTION Remove And Reinstall Toilet

FFP

Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials

UNIT UNIT PRICE MAX AMOUNT

2019AA 10 Each OPTION Stalls

FFP

Stalls

UNIT UNIT PRICE MAX AMOUNT

2019AB 10 Each OPTION Toilets

FFP

Toilets

UNIT UNIT PRICE MAX AMOUNT

2020 UNDEFINED

OPTION Provide Metal Reducer/Transition:

FFP

Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary

UNIT UNIT PRICE MAX AMOUNT

2020AA 500 Linear

1/2" Standard Pin Clampdown

UNIT UNIT PRICE MAX AMOUNT

2020AB 500 Linear

1/2" Standard Pinless Clampdown

UNIT UNIT PRICE MAX AMOUNT

2020AC 500 Linear

1 1/2" Binder Bar (Flat Metal)

UNIT UNIT PRICE MAX AMOUNT

2020AD 500 Linear

UNIT UNIT PRICE MAX AMOUNT

2021 UNDEFINED

OPTION Provide Installation Of GFE: Includes Tr

FFP

Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.

UNIT UNIT PRICE MAX AMOUNT

2021AA 100 Square

VCT - Includes Stripping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

2021AB 100 Square

Broadloom Glue Down Carpet

UNIT UNIT PRICE MAX AMOUNT

2021AC 100 Square

Carpet Tiles

UNIT UNIT PRICE MAX AMOUNT

2021AD 100 Linear

Cove Base

UNIT UNIT PRICE MAX AMOUNT

2022 5 Each OPTION Moisture Tests

FFP

UNIT UNIT PRICE MAX AMOUNT

2023 100 Bag OPTION Major Floor Prep beyond 1/8" in 10 ft

FFP

Major Floor Prep beyond 1/8" in 10 ft

UNIT UNIT PRICE MAX AMOUNT

2024 50 Square

Re-stretch existing carpet

UNIT UNIT PRICE MAX AMOUNT

3001 200 Labor

Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

3002 200 Labor

Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.

Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

3003 5,000 Square

Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

3004 5,000 Square

Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

3005 5,000 Linear

Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold

UNIT UNIT PRICE MAX AMOUNT

3006 3,500 Square

Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

3007 UNDEFINED

OPTION Provide New Glue Down Carpet: Includes

FFP

Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

3007AA 50 Square

UNIT UNIT PRICE MAX AMOUNT

3007AB 50 Square

UNIT UNIT PRICE MAX AMOUNT

3007AC 50 Square

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3007AD 50 Square

Type IV, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3007AE 50 Square

UNIT UNIT PRICE MAX AMOUNT

3007AF 50 Square

UNIT UNIT PRICE MAX AMOUNT

3007AG 50 Square

UNIT UNIT PRICE MAX AMOUNT

3007AH 50 Square

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3007AJ 250 Square

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3007AK 50 Square

Type XI, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3007AL 50 Square

Type XII, W/ Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3007AM 50 Square

Type XIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3007AN 50 Square

UNIT UNIT PRICE MAX AMOUNT

3007AP 50 Square

Type IV, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

3007AQ 2,500 Square

Type IX, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

3008 50 Square

Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

3009 UNDEFINED Square

Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

3009AA 50 Square

Type I, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

3009AB 50 Square

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3009AC 50 Square

Type VII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3009AD 50 Square

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3009AE 50 Square

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3009AF 50 Square

Type X, W/O Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3009AG 50 Square

Type XII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

3009AH 500 Square

Type IX, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

3010 7,500 Linear

Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

3011 UNDEFINED

OPTION Provide New 4" Rubber Base:

FFP

UNIT UNIT PRICE MAX AMOUNT

3011AA 7,500 Linear

Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

3011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi

FFP

Provide New 4" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

3012 UNDEFINED

OPTION Provide New 6" Rubber Base

FFP

UNIT UNIT PRICE MAX AMOUNT

3012AA 100 Linear

: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

3012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi

FFP

Provide New 6" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

3013 250 Square

Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

3014 500 Square

Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

3015 1,000 Linear

Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

3016 1,000 Linear

Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

3017 UNDEFINED

OPTION Provide New Ceramic Tile Flooring Or Bas

FFP

Provide New Ceramic Tile Flooring Or Base Tile: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

3017AA 500 Square

UNIT UNIT PRICE MAX AMOUNT

3017AB 500 Square

Quarry Tile

UNIT UNIT PRICE MAX AMOUNT

3017AC 500 Square

Tile Base

UNIT UNIT PRICE MAX AMOUNT

3018 500 Square

Asbestos Removal, Complete: Includes Labor, Transportation, Materials, Testing And Disposal Using RFCI Methods

UNIT UNIT PRICE MAX AMOUNT

3019 UNDEFINED

OPTION Remove And Reinstall Toilet

FFP

Remove And Reinstall Toilet & Privacy Stall: Includes Labor, Transportation, Materials

UNIT UNIT PRICE MAX AMOUNT

3019AA 10 Each OPTION Stalls

FFP

Stalls

UNIT UNIT PRICE MAX AMOUNT

3019AB 10 Each OPTION Toilets

FFP

Toilets

UNIT UNIT PRICE MAX AMOUNT

3020 UNDEFINED

OPTION Provide Metal Reducer/Transition:

FFP

Provide Metal Reducer/Transition: Includes Labor, Transportation, Storage, Accessories, And Materials Necessary

UNIT UNIT PRICE MAX AMOUNT

3020AA 500 Linear

1/2" Standard Pin Clampdown

UNIT UNIT PRICE MAX AMOUNT

3020AB 500 Linear

1/2" Standard Pinless Clampdown

UNIT UNIT PRICE MAX AMOUNT

3020AC 500 Linear

1 1/2" Binder Bar (Flat Metal)

UNIT UNIT PRICE MAX AMOUNT

3020AD 500 Linear

UNIT UNIT PRICE MAX AMOUNT

3021 UNDEFINED

OPTION Provide Installation Of GFE: Includes Tr

FFP

Provide Installation Of GFE: Includes Transportation, All Labor, Surface Prep And Adhesive.

UNIT UNIT PRICE MAX AMOUNT

3021AA 100 Square

VCT - Includes Stripping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

3021AB 100 Square

Broadloom Glue Down Carpet

UNIT UNIT PRICE MAX AMOUNT

3021AC 100 Square

Carpet Tiles

UNIT UNIT PRICE MAX AMOUNT

3021AD 100 Linear

Cove Base

UNIT UNIT PRICE MAX AMOUNT

3022 5 Each OPTION Moisture Tests

FFP

UNIT UNIT PRICE MAX AMOUNT

3023 100 Bag OPTION Major Floor Prep beyond 1/8" in 10 ft

FFP

Major Floor Prep beyond 1/8" in 10 ft

UNIT UNIT PRICE MAX AMOUNT

3024 50 Square

Re-stretch existing carpet

UNIT UNIT PRICE MAX AMOUNT

4001 200 Labor

Labor To Move Non-Systems Furniture And Office Equipment. Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

4002 200 Labor

Remove/Reinstall Systems Furniture: Labor To Move Systems Furniture.

Furniture Shall Be Moved And Reinstalled To The Original Location

UNIT UNIT PRICE MAX AMOUNT

4003 5,000 Square

Remove/Dispose Of VCT W/ Mastic Or Sheet Vinyl Floor W/ Mastic: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

4004 5,000 Square

Provide New VCT: Labor And Materials For Installing New VCT, Including Transportation, Surface Preparation, Storage Costs, Striping And Applying Wax/Sealant

UNIT UNIT PRICE MAX AMOUNT

4005 5,000 Linear

Remove/Reinstall Wood Base Shoe/Board/Molding: Labor, Materials, Equipment Required To Remove, Then Reinstall Wood Base Shoe/Board/Mold

UNIT UNIT PRICE MAX AMOUNT

4006 3,500 Square

Remove/Dispose Of Glue Down Carpet: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

4007 UNDEFINED

OPTION Provide New Glue Down Carpet: Includes

FFP

Provide New Glue Down Carpet: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

4007AA 50 Square

UNIT UNIT PRICE MAX AMOUNT

4007AB 50 Square

UNIT UNIT PRICE MAX AMOUNT

4007AC 50 Square

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4007AD 50 Square

Type IV, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4007AE 50 Square

UNIT UNIT PRICE MAX AMOUNT

4007AF 50 Square

UNIT UNIT PRICE MAX AMOUNT

4007AG 50 Square

UNIT UNIT PRICE MAX AMOUNT

4007AH 50 Square

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4007AJ 250 Square

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4007AK 50 Square

Type XI, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4007AL 50 Square

Type XII, W/ Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4007AM 50 Square

Type XIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4007AN 50 Square

UNIT UNIT PRICE MAX AMOUNT

4007AP 50 Square

Type IV, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

4007AQ 2,500 Square

Type IX, W/Action Back

UNIT UNIT PRICE MAX AMOUNT

4008 50 Square

Remove/Dispose Of Stretch-In Carpet And Pad: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

4009 UNDEFINED Square

Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

4009AA 50 Square

Type I, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

4009AB 50 Square

Type III, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4009AC 50 Square

Type VII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4009AD 50 Square

Type VIII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4009AE 50 Square

Type IX, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4009AF 50 Square

Type X, W/O Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4009AG 50 Square

Type XII, W/Cushion Back

UNIT UNIT PRICE MAX AMOUNT

4009AH 500 Square

Type IX, W/Tile Back

UNIT UNIT PRICE MAX AMOUNT

4010 7,500 Linear

Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

4011 UNDEFINED

OPTION Provide New 4" Rubber Base:

FFP

UNIT UNIT PRICE MAX AMOUNT

4011AA 7,500 Linear

Includes Requirements When Less Than 4" High. Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

4011AB 200 Each OPTION Provide New 4" Rubber Base moulded outsi

FFP

Provide New 4" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

4012 UNDEFINED

OPTION Provide New 6" Rubber Base

FFP

UNIT UNIT PRICE MAX AMOUNT

4012AA 100 Linear

: Includes Labor, Transportation, Storage, And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

4012AB 100 Each OPTION Provide New 6" Rubber Base moulded outsi

FFP

Provide New 6" Rubber Base moulded outside corners

UNIT UNIT PRICE MAX AMOUNT

4013 250 Square

Remove/Dispose Of Rubber Flooring: Includes All Labor, Transportation, Storage, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

4014 500 Square

Provide New Solid Rubber Flooring: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

4015 1,000 Linear

Provide New Rubber Stair Treads/Risers: Includes Labor And Materials Necessary, Including Surface Preparation

UNIT UNIT PRICE MAX AMOUNT

4016 1,000 Linear

Remove/Dispose Of Ceramic Tile Flooring: Includes All Labor, Materials, Equipment, And Disposal Costs Required

UNIT UNIT PRICE MAX AMOUNT

4017 UNDEFINED

OPTION Provide New Ceramic Tile Flooring Or Bas

Provide New Cerami