Appendix A - Cost Breakdown.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
B268 Replace STUS Backup Generator
Solicitation number
FA302226R00023
Issued by

About this file

This is a Cost Breakdown Template for a construction project at Columbus Air Force Base. The template is designed for offerors to submit detailed pricing information for solicitation FA302226R00023, titled "B268 Replace STUS Backup Generator." Offerors must complete all cost categories including bonds and insurance, mobilization, architecture and engineering design (35%, 65%, 95%, and 100% design phases), materials, equipment, labor (with hours and rates), and miscellaneous charges including Mississippi State Tax. The template requires vendor information (name, address, phone, email, NAICS code, and CAGE code), solicitation details (project title, solicitation number, period of performance, and proposal validity duration), and a final construction project total price line.

The government emphasizes that offerors bear full responsibility for providing adequate supporting data and documentation to justify the reasonableness of all proposed costs. According to the related solicitation, this project involves replacing a 277/480V 30 kW backup generator, fuel tank, fuel pump, and Automatic Transfer Switch (ATS) at the Simulator Training Facility (B268) at Columbus Air Force Base, with an estimated project range between $100,000 and $250,000. A mandatory site visit is scheduled for August 13, 2026, at 9:00 AM CST, with registration required by August 7, 2026. All RFIs must be submitted by August 19, 2026, at 7:30 AM CST, and proposals are to be submitted electronically. Contractors must complete CUI training and obtain access to controlled documents through SAM.gov before accessing detailed technical specifications and drawings.

View the file

Other files

File Type Posted
B268_Site Visit-Sign in Sheet.pdf PDF
Solicitation Amendment FA302226R00230001 SF 30.pdf PDF
B268 RFIs.pdf PDF
CUI Contractor Training Acknowledgment.pdf PDF
EAL Form.pdf PDF
AF Form 66 B268.xlsx XLSX spreadsheet
Solicitation - FA302226R0023.pdf PDF
CUI Contractor Training Slides.pptx PPTX presentation
21 April Statement of Work B268.pdf PDF
18 May Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAFB

Appendix A - COLUMBUS AIR FORCE BASE
INSTRUCTIONS: Please provide information that properly reflects the total cost of the project. Refer to the Statement of Work and Sections L and M in the solicitation to ensure that your proposal meets the requirementsof this project.
SOLICITATION NUMBER:
CONSTRUCTION PRICE PROPOSAL BREAKDOWN
VENDOR'S INFORMATION
Name:
Address:
Phone Number:
Email:
NAICS Code
Cage Code:
SOLICITATION INFORMATION
Title of Project:
Solicitation Number:
Proposed Period of Performance
Number of Days Proposal and Price are Valid:
BONDS AND INSURANCEQTYUNIT OF ISSUEPRICETOTAL
Certificate of Insurance1
Performance Bonds1
Payment Bonds1
Bid Bonds1
subtotal
MOBILIZATIONQTYUNIT OF ISSUEPRICETOTAL
subtotal
ARCHITECTURE AND ENGINEERING DESIGNQTYUNIT OF ISSUEPRICETOTAL
35% Design
65% Design
95% Design
100% Design (Construction Set)
subtotal
MATERIALQTYUNIT OF ISSUEPRICETOTAL
subtotal
EQUIPMENTQTYUNIT OF ISSUEPRICETOTAL
subtotal
LABORHOURSUNIT OF ISSUERATEAMOUNT
subtotal
MISCELLANEOUS CHARGESQTYUNIT OF ISSUEPRICETOTAL
Misissippi State Tax
subtotal
CONSTRUCTION PROJECTTOTAL PROJECT PRICE
GENERAL INFORMATION
The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal that reflects the total cost of the project. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.