This document is a Requests for Information (RFI) for the B158 Repair LRS Warehouse project (Solicitation Number FA302225R0004). The RFI contains 11 questions and answers addressing various project details, including personnel requirements, work trailer specifications, and site conditions. Key clarifications include: the superintendent and QAQC roles must be separate individuals, no contract-specific QA/QC or Safety Plans are required, the project is not tax-exempt, and the temporary work trailer needs to accommodate 6 personnel without special systems, bathrooms, or kitchen facilities. The document references CUI record drawings for additional details about ceiling demolition, office locations, and underground utilities, with specific guidance provided for each query to help potential contractors understand the project scope and requirements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information

FA302225R0004, B158 Repair LRS Warehouse, Add Restrooms:

Q1: In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles?

A1: Superintendent and QAQC must be separate individuals.

Q2: Are contractors required to issue a contract specific QA/QC Plan?

A2:No.

Q3: Are contractors required to issue a contract specific Safety Plan?

A3: No

Q4: Is this project tax exempt?

A4: No

Q5: Section 2.1 of the Statement of Work states, “Demolish and remove the existing suspended ceiling in attached document ‘Conceptual Drawing of Area of interest’”, but the drawings do not show a conceptual drawing of area of interest. Please advise.

A5: See page 3 on the CUI Record Drawings.

Q6: Section 2.12 of the Statement of Work states, “Demolish existing office location marked on attached concept drawings” but the drawings do not show which offices are marked to be demolish. Please advise

A6: CUI record drawing page 2 has been updated with the office highlighted.

Q7: How many personnel will the temporary work trailer need to accommodate?

A7:6

Q8:Are there drawings that show underground utilities?

A8:See pages 5-7 of CUI record drawings.

Q9: Is there access to the crawl space under the building?

A9: No crawl space, the pit that was seen on the site visit was only in that area.

Q10: Will temporary work trailer require installation of special systems (IT, Phone, etc.) by the contractor or will CAFB handle the installation of special systems?

A10:.Not required of the contractor.

Q11:Will temporary work trailer need to have bathroom and kitchen facilities?

A11: No