Amendment 2.doc
DOC document 41 KB Posted
- Solicitation number
- FA3020-10-R-0025
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FPRAsbestos.doc | DOC document | |
| Performance_Questionnaire.doc | DOC document | |
| Price Exhibits.xlsx | XLSX spreadsheet | |
| Amendment 1.doc | DOC document | |
| Base Pass Form.doc | DOC document | |
| Section 13280 Asbestos Abatement-ACM_LBP IDIQ.doc | DOC document | |
| Price Exhibits.xlsx | XLSX spreadsheet | |
| Section 13283 Remove Disp of Lead based Paint-ACM_LBP IDIQ.doc | DOC document | |
| WD302.docx | DOCX document | |
| Contractor Past Performance Submittal Form.doc | DOC document | |
| sflll.pdf | ||
| Solicitation.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 – BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to incorporate changes to the solicitation, and to answer questions submitted by potential offerors.
1. Replace Attachment 6 “Contractor Past Performance Submittal” with “Past Performance Questionnaire” to the solicitation. This attachment to be submitted by the proposal due date.
2. Change Instructions to Offerors Section L, Part III Technical Proposal
FROM:
(a) Factor – Reference Specifications for Asbestos Abatement Section 13280, General Part 1, Contractor Qualifications 1.1Documentation of Performance in Asbestos Abatement Removal:
The Contractor must be licensed as required by federal and state for the purpose of removal, encapsulation, enclosure, demolition and maintenance of structures or components covered by or composed of asbestos-containing materials. The contractor shall provide his/her registration and license with the state of Texas.
Contractors not certified for the purpose of removal, encapsulation, enclosure, demolition and maintenance of structures or components covered by or composed of asbestos-containing materials by federal and state at the time of submission of a proposal, including prices, shall be rejected. If a joint venture or other arrangement is contemplated, the above applies to all firms involved in the arrangement.
TO READ:
(a) Factor – Reference Specifications for Asbestos Abatement Section 13280, General Part 1, Contractor Qualifications 1.1Documentation of Performance in Asbestos Abatement Removal:
The Contractor must be licensed as required by federal and state for the purpose of removal, encapsulation, enclosure, demolition and maintenance of structures or components covered by or composed of asbestos-containing materials. The contractor shall provide his/her registration and license with the state of Texas.
Contractors not certified for the purpose of removal, encapsulation, enclosure, demolition and maintenance of structures or components covered by or composed of asbestos-containing materials by federal and state at the time of submission of a proposal, including prices, shall be rejected.
3. The following information is provided in response to questions submitted by potential offerors:
Q1. Amendment 1 Question 1. We are questioning the validity of the requirement for the State of Texas. We feel this is incorrect. As long as one contractor or subcontractor meets the licensing requirements it should be sufficient.
A1. The Technical Proposal Part III in section L of this solicitaiton has been changed to reflect that one contractor or subcontractor meets the the licensing requirements will be sufficient.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .