This document is a set of Questions and Answers (Q&A) regarding an Anechoic Chamber Inspection for the Department of the Air Force Air Education and Training Command. The document provides specific details about the inspection scope, including two chambers measuring 36 feet long, 36 feet wide, and 20 feet high, located within a 48-inch-deep pit. The chambers are estimated to be 45-50 years old, dating back to the late 1970s or early 1980s, and were inherited within the last five years.

The Q&A outlines inspection logistics and access requirements, specifying that technicians will have work hours from 0730L to 1630L, Monday through Friday, with recommended reduced hours on Friday. All personnel must be escorted and must provide credentials several business days in advance for security clearance. The inspection scope includes microwave absorber treatment on the four walls, ceiling, and floor, potentially including the physical flooring above the absorber as specified in the Statement of Work (SOW).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Anechoic Chamber Inspection Questions

Q) What is the size of each of the two chambers to be inspected; length, width and height?

A) The chamber measures 36 feet in length, 36 feet in width, and 20 feet in height. It is understood that the chamber is located within an approximately 48-inch-deep pit.

Q) When were the chambers built, how long ago?

A) The chamber spaces were inherited within the last five years. While the exact construction date is unknown, it is estimated that the chambers date back to the late 1970s or early

1980s—placing their age in the range of approximately 45 to 50 years.

Q) Is the microwave absorber treatment on all four walls, ceiling and floor, or just walls and ceiling?

A) Scope is limited to the four walls, ceiling, and floor. This may also include the physical flooring located above the absorber if stated in the SOW.

Q) How many hours of access per day do our technicians have to inspect the chambers, if they are escorted?

A) Work hours are 0730L to 1630L, Monday through Friday. It is recommended to reduce hours on Friday by one or two hours.

All personnel must be escorted and provide credentials a few business days in advance to allow the security team to coordinate access.