24Q6003 amend 0002 CO Signed.pdf

PDF 379 KB Posted

Attached to
Camp Bullis Containerized Showers Federal contract opportunity
Solicitation number
FA301625Q6003
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is an amendment to a solicitation for three (3) containerized showers with a total of eighteen (18) shower heads at Joint Base San Antonio (JBSA) Camp Bullis, TX. The amendment provides additional answers to industry-generated questions received prior to the due date of November 7, 2024. Key details include: the contractor must provide new containers and construction materials, both male and female showers are required, and the government will provide the 3,000-gallon freshwater tank but the contractor must be able to refill it and provide the gray water tanks. The quotation package is due by November 12, 2024 at 4:00 PM Central Time. The solicitation is being issued by the Department of the Air Force's Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Other files attached to Camp Bullis Containerized Showers, newest first.
File Type Posted
24Q6003 amend 0001 CO signed.pdf PDF
Attachment 3 - Clauses and Provisions.pdf PDF
Attachment 4 Containerized Shower Projected Timeline.xlsx XLSX spreadsheet
Attachment 2 - Schedule of Supplies (CLIN stucture).xlsx XLSX spreadsheet
Attachment 1 - Statement of Work (SOW) dated 18 Oct 24.docx DOCX document
Combo Solicitation BOLC Showers.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

FA301624Q6003 – Amendment 0002 Continuation

Page: Industry Generated Questions and Answers

Q1. What is the lead time you are expecting for this project?

A1. As soon the contract is awarded, the contractor will have until 14 February 2025 to have showers in place before first BOLC training is scheduled. This includes scheduling with the customer on delivery and installation.

Q2. Our subcontractor has asked whether the government requires additional external waste tank capacity beyond the waste tanks that come with the shower trailers themselves? Please let us know if any external waste tank capacity is needed or if the built-in waste tanks with the trailers will suffice.

A2. Trailers will not work; external waste containers will be required.

Q3. Would trailer showers be an acceptable alternative to the containerized showers?

A3. No

Q4. Is it a total of (3) containers with 6 showers for each?

A4. Yes, or two containers with nine showers each for a total of 18 showers.

Q5. Is there a set number for men or women?

A5. No, it fluctuates based on the different classes. Shower containers do not need to be gender specific.

Q6. Is power really 220v, 100-amp, single phase? When it is written this way, it could be understood as 50 Hz which is for overseas. We know this is not going overseas so we assume this is 120/240v, single phase. Just wanted to clarify.

A6. Yes, is 120/240 single phase.

Q7. Grinder pumps are used for black water, shower water is grey water. Do they really need a grinder pump or is it okay to use a lift station that does not have to worry about trash getting into the drain line?

A7. No requirement for grinder pumps, since is only gray water.

Q8. Wastewater tanks, is it 3500-gal capacity for all three containers? Or for each container? It calls out two tanks, is it 3500 gals per tank?

A8. The current grey water tank (blivet bladder) is 4000 gals for all 3 containers (18 showers).

Q9. What size freshwater tanks?

A9. 3,000 gallons

Q10. Training Schedule: Could you please provide more information on how the 14 training periods are divided throughout the calendar year? This will help us plan appropriately for staffing and cleaning schedules.

A10. There are seven major training periods, approximately 2-3 weeks each. A schedule will be provided with exact dates. Generally, these are the months we conduct training OCT, NOV-DEC, FEB, APR-MAY, JUN-JUL, AUG.

Q11. Potable Water Storage: Will external potable water tanks need to be furnished by the contractor? If so, could you confirm the minimum tank size required, as the solicitation specifically mentions only a grey water tank.

A11. We will provide the 3,000 gallons tank for fresh water. Contractor will need to be able to refill the freshwater tank and provide gray water tanks.

Q12. Water Truck Approval: Would the government approve the use of a potable and a nonportable water truck on-site for this project to ensure efficient water delivery and waste removal?

A12. Yes

Q13. Contract Conclusion: At the end of the 5-year contract term, does the government intend to purchase only the container shower units, or the entire system (including the container showers, propane tank, and both potable and non-potable water. At the sixtieth

(60) month, the Government will own the containerized showers and accessories.

A13. Each month, the invoiced payments for the showers will be allocated towards the lease-to-own costs. At the conclusion of the 60-month term, the government will assume ownership of the showers and the entire system associated with the shower operation, including pumps, exterior plumbing, and gray water systems essential for their operation. This will NOT include the hauling system (the truck/trailer used to haul potable and grey water).

Q14.How much propane needs to be included? We would locate the bottles on the exterior opposite end of the a/c unit.

A14. It varies per class because our class sizes range from 200 to 400 personnel. The current 3 shower trailers utilize 5 x 100 lb. propane tanks.

Q15.What is the anticipated number of people using the showers daily?

A15. 200 to 400 personnel.

Q16. Additionally, if we’re unable to discharge wastewater into a drainage ditch or grassy swale, we would need to arrange for pump trucks to empty it. Could you confirm the accepted method for shower water disposal?

A16. Gray water can be disposed of on Camp Bullis into a manhole. The manhole is located about 1.5 miles from the shower location.

Q17. Lastly our units require connection to permanent shore power, with 3–5 panels at 20- 30 amps each at 110V. Could you confirm what is expected of us regarding the electrical connections?

A17. There is currently one panel where all three container units are connected.

Q18. What size should the container be? 20ft or 40ft standard height or High Cube (9.6')?

A18. Either size, at longest there is a total of 18 shower heads, but at least two containers, because males and females. Standard height will be fine.

Q 19. Can you clarify if the engineered manufactured units must be certified to specific ISO container standards, or will a general modular design that meets military durability and transport standards suffice?

A19. A general modular design that meets military durability and transport standards suffice.

Q20. Are there specific certifications or inspections required for anti-scald valves, backflow preventers, and HVAC systems to meet military or federal standards? What about efficiency standards?

A20.Both

Q21. Would preference be given to companies with certified propane specialists on staff?

A21. No

Q22. Are electrical components required to be rated to specific environmental standards (e.g., IP65 or NEMA ratings) to handle exposure to outdoor weather conditions and wet environments?

A22. Yes

Q23. Will an electrical inspection by MEDCoE engineering personnel be mandatory after installation, or can this be done by the contractor’s licensed team members?

A23. It can be done by the contractor’s licensed team members.

Q24. Can you clarify the one-hour emergency response requirement—does it apply to all types of issues (e.g., plumbing, electrical, HVAC), and must the contractor have qualified personnel on-call locally to meet this?

A24. Yes

Q25. Is the government open to proposals that include advanced monitoring and maintenance technology (e.g., remote monitoring for water and propane levels), which might reduce emergency maintenance calls?

A25. Yes

Q26. Can the contracting officer confirm if there are any environmental reporting requirements tied to water usage or gray water disposal that the contractor should prepare for?

A26. No

Q27. Will the government provide specific performance thresholds or inspection criteria, or must contractors develop these as part of their proposal?

A27. Develop as part of the proposal.

Q28. Can you provide more details about on-site inspection and acceptance protocols?

Are there specific licensing/certifications (e.g. licensed Electric & HVAC, NFPA, OSHA,) required for personnel handling the installation of water, propane, and electrical connections?

A28. No

Q29. Does the solicitation require new containers and construction materials for the shower units? Based on the discussion during the site walk, we understand the incumbent would be required to provide newly constructed units, please confirm this is correct.

A29. Yes

Q30. Will the evaluation criteria include points for military-grade, low-maintenance materials or certifications, such as using corrosion-resistant materials or offering modular, future-ready units?

A30. Yes

Q31. Is a 5-year warranty required since there is a purchase option with this solicitation?

Please provide the Warranty Requirements.

A31. No. Only warranty necessary is while the showering system is being leased

Q32. Are waterproof materials required for the interior finish of the containers?

A32. Yes

Q33. We plan to Polyurea the floor and 2’-4’ up the walls in order to waterproof the interior area. If we put a shower pan, like Item # 321018157 (Home Depot), can we poly the shower stall wall area instead of using the inserts (Item #321017406 Home Depot)?

A33. Yes

Q34. As of now, we have the shower floor plan laid out in 4 showers/area. Can we have 1 vanity/sink for the 4 showers, or do we need 2 vanity/sink in the 4-shower area?

Q34. One sink per area.

Q35. On the grey water holding tank, it states 3,500-gallon tanks. Can we use one 2,500-gallon stationary tank and a 1,000-gallon tank on the dump trailer?

A35. No trailers will be stationary on site. However, trailers to transport/remove fresh water/grey water is acceptable.

Q36. Can the maintenance person stay on site in their own container cabin at the training site during the maintenance period?

A36. Yes.

Q37. If we set a stationary 500- or 1,000-gallon propane tank, can it be set within the fence or does it have to be set outside the fence area? If it can be set within the fenced area, it will be distanced appropriately from electrical and buildings. If the distance is still too close to the building/electrical and has to be set outside the fence, can it be set outside the fence?

A37. Yes.

Q38. The pump we will use already has a check valve (backflow preventer) built in. Do we need an additional backflow preventer?

A38. No.

Q39. Our plumber said an RPZ is only used when coming off a municipal water supply and typically not used on storage tanks. Since we are using a storage tank, do we still need the

RPZ?

A39. No.

Q40. Would one (1) containerized shower unit with 18 heads satisfy the requirement?

A40. No, both males and females will be showering at the same time. Showers can be divided into two nine and nine headed units.

Q41. Please confirm that contractors must also provide new electrical infrastructure that needs to be connected to the base power supply. By this we are speaking of the new panel box, electrical breakers, and wiring/cabling. Is this correct?

A41. Yes, this is correct.

Q42. Will the government provide a potable water source on post to draw water from?

A42. Yes.

Q43. Could you provide the grid coordinates for the potable water source points?

A43. MGRS- 14R NT 4113 7918 / Google Maps- 29.6419117, -98.5749733

Q44. Could you provide grey water disposable locations?

A44. MGRS- 14R NT 3932 8114 / Google Maps- 29.6597013, -98.5935898

Q45. Will the government provide a small laydown yard on post for contractor equipment?

A45. Yes.

Q46. Will the contractor have to move the showers after they are in place?

A46. No.

24Q6003 amend 0002
Amendment 0001 Industry Generated Questions and Answers
SF 30 FA301621U0148 Amendment 0001

Addtional Industry Generated Questions 0002

topmostSubform[0]:
Page1[0]:
ContractIDCode[0]:
Page[0]: 1
Pages[0]: 6
AmendmentNo[0]: 0002
EffectiveDate[0]: 11/013/2024
ReqNumber[0]:
ProjectNo[0]:
IssuedBy[0]: 502 CONS/JBKBA

395 B STREET WEST STE 2

JBSA RANDOLPH, TX 78150-4525

Code[0]: FA3016
AdministeredBy[0]: See Item 6
Code[2]:
NameandAddress[0]:
Code[1]:
FacilityCode[0]:
CheckBox9[0]: Off
AmendmentNo[1]: FA301624Q6003
Dated9B[0]: 10/23/2024
CheckBox10[0]: Off
ModificationNo[0]:
Dated10B[0]:
CheckBox11[0]: 1
Extended[0]: Off
NotExtended[0]: 1
Copies[0]: 1
AccountingData[0]:
CheckBox13A[0]: Off
A13[0]:
CheckBox13B[0]: Off
CheckBox13C[0]: Off
C13[0]:
CheckBox13D[0]: Off
D13[0]:
IsNot[0]: Off
Is[0]: Off
CopiesReturned[0]:
Description[0]:

The purpose of this Amendment is to:

1. Provide additional Answers to Industry Generated Questions that were received before 7 November 2024.

All other terms and conditions remain unchanged.

NameandTitleSigner[0]:
Signature1[0]:
DateSigned[0]:
NameandTitleOfficer[0]: Brian Cooper, Contracting Officer
Signature2[0]:
DateSigned[1]: 13 Nov 2024