This document is a comprehensive Questions and Answers (Q&A) file for a Dorm Camera Replacement project at Joint Base San Antonio (JBSA) Lackland, TX, solicitation number FA301625Q0167. The project involves replacing the existing camera system in Buildings 1184B, 1184C, and 1184D with a new stand-alone security monitoring system that will not connect to Air Force or Navy networks. Key technical specifications include installing 63 indoor and 7 outdoor 4MP cameras, 2 Network Video Recorders (NVRs) with 48TB storage, 3 POE switches, and approximately 7,000 feet of new CAT6 plenum cable, with a video retention requirement of at least 30 days.

The solicitation is set aside for 100% Total Small Business, with contractors required to provide all personnel, equipment, and services necessary for a complete system installation. Notable requirements include compliance with the Buy American Act (65% of products made in the United States), NDAA Section 889 restrictions on surveillance equipment, and meeting specific technical characteristics outlined in the Statement of Work. The project does not require audio capabilities, FIPS compliance, or integration with existing networks, and contractors are expected to handle cable routing, system testing, training, and project documentation upon completion.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

502 CONS/JBKAE FA301625Q0167

JBSA Lackland, TX Dorm Camera Replacement

QUESTIONS & ANSWERS: Site Visit for 7/15/2025 @ 10:00 am

Question 1: Is this project subject to any prevailing wage rates such as SCA or Davis Bacon?

Government Response: This requirement should be a product with incidental services (one time install). SCA or Davis Bacon will not be looked at.

Question 2: May the QCM assume the responsibilities of the SSHO on this project?

Government Response: SSHO will be the responsibility of the Contractor.

Question 3: May the QCM assume the responsibilities of the Superintendent on this project?

Government Response: Refer to Question #2. It is not the Government’s position to instruct contractor to proceeding delivery and installing requirement based on industry practice.

Question 4: May the SSHO assume the responsibilities of the Superintendent on this project?

Government Response: Refer to question #2 and #3.

Question 5: Given the response date, it is unlikely that the project can be completed prior to the requested 09/30/2025. Is there flexibility with this period of performance?

Government Response: Delivery date will change based on 90 days from awarding the contract.

Question 6: Please confirm if this project is based on calendar days or business days?

Government Response: Calander days.

Question 7: Will all cameras, monitors, switches, and related components be required to comply with the Buy American Act (BAA), or is the Trade Agreements Act (TAA) sufficient for compliance? Please confirm whether equipment manufactured in TAA-compliant countries (e.g., South Korea, Japan, Taiwan) is acceptable, or if only U.S.-manufactured products will be accepted for this project.

Government Response: IAW FAC 2022-04, effective 2024, 65% of products have to be made in the United States.

IAW 25.402, table 1, refer to tables as far as dollar amounts.

Additionally, contractor must identify if they’re quote is IAW the buy American act or TAA.

Question 8: Please post the sign in sheet and Q&A's from the site visit.

Government Response: Sign in sheet is a Government internal document. Sign in sheet will not be posted.

Question 9: Please post the drawings and the key for the drawings.

Government Response: Information has been posted.

Question 10: Does this project require compliance with NDAA Section 889 and associated FCC bans on certain surveillance equipment? Specifically, must all cameras and related components exclude prohibited manufacturers (e.g., Hikvision, Dahua, Huawei, Hytera, ZTE, Uniview affiliates, etc.) in order to be eligible for procurement under federal guidelines?

Government Response: IAW Section (a)(1)(A), the above statement is correct. Additionally FAR clauses 52.204-24, 52.204-25, and 52.204-26 are a part of the contract to ensuring to staying in compliance.

Question 11: Would the government consider a cloud solution? If so, would the cloud solution require a FedRAMP Authorization?

Government Response: The Government is only requesting what is on the Statement of Work / Specifications documentation.

Question 12: Please provide/post other “Q & A” requests.

Government Response: The Government has no response / does not understand the question.

Question 13: What is the range of the budget for this project, and is it already appropriated?

Government Response: The Government is not entitled to provide this information during the solicitation process of this requirement.

Question 14: Does the Government want the contractor to reuse the cable that is running to existing cameras? Or to run new cable to cameras going to existing cable locations?

Government Response: New CAT6 cable shall be installed. I know the SOW references 1,500’ of CAT6 cable but that is just an estimate. The government is aware that the number is much larger than that.

Question 15: If the Government wants new cable run to the existing camera locations, do they want the Contractor to demo (remove) the existing cable running to those locations?

Government Response: No this is not necessary as long as there is not any exposed cable from any of the areas where the old cable is exposed.

Question 16: Is there existing interbuilding connectivity (i.e., fiber) that will be reutilized to connect Bravo and Delta to Charlie?

Government Response: No, all existing equipment shall be replaced.

Question 17: There are a total of 71 camera locations on the provided drawings. The scope of work calls for 68 indoor cameras and 7 outdoor cameras. Should we provide installation for the quantity of cameras in the scope? Or the quantity of cameras in the drawing?

Government Response: The Specifications list on the SOW and on the Salient Characteristics document was incorrect. The correct number should be 63 indoor cameras and 7 outdoor cameras that make up 70 total.

Question 18: CLIN 0014 requests quantity 1,500 of CAT6e plenum cable. CAT6e does not exist, please confirm Government is looking for CAT6 plenum cable.

Government Response: The government is looking for CAT6 plenum cable.

Question 19: CLIN 0014 requests quantity 1,500 of CAT6e plenum cable. Assuming 1,500 corresponds to feet, this looks to be an insufficient amount of cable to connect all cameras. We anticipate a requirement of closer to 7,000 feet of cable for new cameras. Can the Government please update cable quantity? Remove wording closer to

Government Response: The 1,500’ was an estimate. The contractor shall replace all existing cable with new CAT6 cable. The government understands that the 1500’ was underestimated.

Please provide info for 7,000 feet of CAT6 cable.

Question 20: During the site walk, we were not able to see the pathway above the ceiling. Can Government confirm that no new pathway will be required, and that existing pathway will be utilized?

Government Response: The existing pathway for the camera system will be utilized. There is a small crawlspace between the floors where the existing cable is being ran through.

Question 21: There are no patch cords in the requested supplies. Does the Government prefer all cameras be home-run back to the switches, as opposed to utilizing patch cables on each end?

Government Response: This system will not be on the Air Force or Navy network and shall be stand alone. Patch cords will not be necessary.

Question 22: Please confirm that there is existing power for the new POE switches, and that the Government is responsible for providing power if it does not exist.

Government Response: There is power in all areas. This is a replacement system (removal and installation of new equipment).

Question 23: How many NVRs needed? The list mentioned (1) but the specs (SOW - 2.4) say 2 NVRs.

Government Response: Two NVRs are needed. One will be located in Bldg 1184C Room 105 and the other will replace the NVR in the existing network rack.

Question 24: What camera resolution is required? The list says 2MP but the specs (SOW - 3.1 & 3.2) say 4MP.

Government Response: The government requires a 4MP resolution camera. Both the Salient Characteristics document and the Statement of work state that the camera resolution should be

4MP.

Question 25: Is the government asking for 2MP or 4MP cameras? In the “Supplies or Services & Prices or Costs” list, the government identifies “2.0 PM Indoor Dome Camera IAW statement of work, 28 May 25” and “2.0 Outdoor Megapixel (1080p) day/night dome camera.” When you go to the statement of work “3.0 Specifications,” the government specifies under “Resolution 4 megapixel.” Which is does not match the 2.0, which represents 2MP model camera, in the “Supplies or Services & Prices or Costs”.

Government Response: Refer to question #24

Question 26: The maps show 70 cameras in total, but your BOM lists out a total of 75 cameras (68 indoor and 7 outdoor). Please clarify the correct counts.

Government Response: Refer to question #17

Question 27: In the drawings there are 69 cameras identified either existing or new interior and exterior. In the “Supplies or Services & Prices or Costs,” There are 75 cameras being requested.

During the site visit we did notice some cameras were missing from the drawings.

We would like to confirm that the indoor cameras being requested are 68 and the indoor cameras are 7?

Government Response: Refer to question #17

Question 28: We would like to confirm that 30 new cameras are being requested, based on drawings?

Government Response: Refer to question #17

Question 29: If 30 new cameras are being requested, the Cat6 Plenum cable is insufficient amount. Generally, for Cat6e new install you calculate 250 ft. per camera for the runs to be safe.

Is the 1500 ft. for Cat6e Plenum cable fixed?

Government Response: Refer to question #17 and #19

Question 30: Clarification on Camera and License Counts: * RFI: The solicitation requests 68 Indoor Dome Cameras (Item 0001) and 7 Outdoor Megapixel Cameras (Item 0002), totaling 75 cameras [Page 4, Supplies or Services & Prices or Costs, Item 0001, 0002].

However, it requests 70 ACC 7 Enterprise Edition Camera Licenses (Item 0006) [Page 4, Supplies or Services & Prices or Costs, Item 0006]. * Please confirm if the quantity of 70 camera licenses is accurate for the 75 cameras being installed. If not, please clarify the correct number of licenses required for the total cameras specified.

Government Response: Refer to question #17

Question 31: The Spec calls out for (68) Indoor cameras and (7) Outdoor cameras, but in the floor plans there is a total of only (68) cameras, what is the total counts of cameras?

Government Response: Refer to question #17

Question 32: The total camera counts are (75) but only calls out for (70) camera license. Do we need to quote for (75) licenses?

Government Response: Refer to question #17

Question 33: “ACC7 Enterprise” is an older version of requested cameras specs requested. The requested brand of cameras current software version is “Unity8” version licenses. ACC7 is slowly being phased out by the manufacturer, do we still want ACC7 priced for this project?

Government Response: The government is not requesting a specific brand just that whatever is offered in the solution meet or exceed salient characteristics listed. Also refer to question #10

Question 34: Do cameras need to be FIPS compliant? Only time they will need to be FIPS compliant is if they will be required to go on the network. If the system will be a stand-alone system for duration of life span, then FIPS would not be required as it is more expensive based on meeting network specs for the government.

Government Response: This system will stay as a stand-alone system, it will not be integrated into the Air Force or Navy network.

Question 35: Motorola has two brands of camera lines that are identical, Avigilon and Pelco.

They have the same cameras with different name tapes on the camera. We know this will have a local network video recorder, so it will be stand-alone, this is where the difference exists, Pelco can be purchased at a much lower price than the Avigilon line. Will Pelco be acceptable for this project or is Avigilon the fixed brand to be installed?

Government Response: The government is not requesting a particular brand, only that salient characteristics listed are to meet or exceeded. IAW with the solicitation, technical evaluations are LPTA. Please submit your best offer.

Question 36: Confirmation of System Manufacturer (Avigilon) and Integration: * RFI: The "Supplies or Services & Prices or Costs" table lists "ACC 7 ENTERPRISE EDITION CAMERA LICENSES" as Item 0006 [Page 4, Supplies or Services & Prices or Costs, Item 0006]. * a) Please confirm if the new security monitoring system is intended to be exclusively an Avigilon-branded solution (including cameras, NVR, and VMS), given the specification of Avigilon Control Center 7 Enterprise Edition licenses. * b) If the current camera system being replaced is an Avigilon system, please confirm.

Government Response: The government is not requesting a particular brand, only that salient characteristics listed are met or exceeded.

Question 37: Detailed System Drawings for Cabling Paths: * RFI: The "Statement of Work (SOW)," Section 1.0, states that "Marking codes used on cables shall correspond to the codes shown on system drawings" [Page 45, Statement of Work (SOW), Section 1.0]. While "Attachment 3 - Layout" (Pages 58-64) shows camera locations and numerical codes, it does not explicitly detail cable routing paths or specific termination points within the network racks for all cables. * Please confirm if more detailed system drawings or schematics for cable routing, conduit paths, and specific termination points at network racks will be provided to aid in the installation of the new CAT6 lines.

Government Response: The government is not in possession of any schematics or drawings that outline this information. The requirement is for the CAT6 cable to be marked with the corresponding camera that it is connected to utilizing the layout.

Question 38: * **Discrepancy in NVR Storage Capacity: ** Item 0007, "PREMIUM 64 TB 2U RACK MOUNT, NETWORK VIDEO RECORDER," is listed in the "Supplies or Services & Prices or Costs" table. However, both the "Statement of Work (SOW)" and "Salient Characteristics" specify a "Storage capacity 48 TB" for the Network Video Recorder. Please clarify the required storage capacity: 64 TB or 48 TB.

Government Response: The system requires 48TB NVRs.

Question 39: * **Discrepancy in Workstation Dimensions: ** The "Statement of Work (SOW)" provides individual dimensions for the workstation (Depth 292 mm, Height 290 mm, Width 92.6 mm), while the "Salient Characteristics" lists "Approximate dimensions: 11.5"H x 3.6"W x 11.5"D". Please confirm the precise or preferred dimensions for the workstation.

Government Response: Dimensions are approximately the same, one is just listed in millimeters while the other is listed in inches. Both are just approximate measurements.

Question 40: * **Building 10904 Reference: ** The "Addendum to FAR 52.212-1" mentions "The contractor shall submit specifications for the Camera Monitoring System for Building 10904". However, the project's stated location and all detailed camera placements are exclusively for "Bldgs. 1184B, 1184C, and 1184D". Please clarify if Building 10904 is part of this solicitation's scope, or if this is a typographical error.

Government Response: No, Building 10904 is not part of this project. This is a completely different project that is not mentioned in this requirement.

Question 41: * **Clarity on "AF BPN NO MILSBILLS PROCESSES" in Ship To Address:** The "Ship To" address for all line items includes "AF BPN NO MILSBILLS PROCESSES".

Please clarify the meaning and significance of "AF BPN NO MILSBILLS PROCESSES" within the shipping address for proper delivery and invoicing.

Government Response: The significance of "AF BPN NO MILSBILLS PROCESSES" is coding for WAWF and invoicing purposes.

344 TRS DET 1

480 WEST RD

PORT HUENEME, CA 93043-4402

UNITED STATES

Question 42: * **Specificity of "New" and "Existing" Camera Locations:** For camera locations in Buildings 1184B, 1184C, and 1184D, some camera numbers are designated as "(Existing)" and others as "(New)". For "New" cameras, are there specific mounting points or requirements beyond the general location descriptions (e.g., "south end of Hallway D") that should be considered for installation planning?

Government Response: No, the camera shall be placed in a location in the specified hall that offers the maximum observation point of the hallway.

Question 43: * **Uninterruptible Power Supply (UPS) Specifications:** Item 0008, "APC SMART (UPS) 3000," is listed. However, requirements for this UPS are not provided in either the Statement of Work or the Salient Characteristics. Please provide specific technical requirements for the APC SMART (UPS) 3000 to ensure compliance.

Government Response: An UPS system is not part of the projected items required.

Question 44: “Supplies or Services & Prices or Costs” calls out for 2MP Indoor dome and 2MP outdoor Dome. But in the Specifications calls out for 4MP for indoor/outdoor cameras. Which is the requirement? 2MP or 4MP?

Government Response: The government requires a 4MP resolution camera. Both the Salient Characteristics document and the Statement of work state that the camera resolution should be

4MP.

Question 45: List of cameras that are on Coax line and need to be replace with CAT6 cable

Government Response: Yes, all lines need to be replaced with new CAT6 cable.

Question 46: “Supplies or Services & Prices or Costs” calls out for 64TB NVR. But in the Specifications calls out for 46TB NVR. Which is the requirement? 64TB or 46TB? Either or options might not be enough to record at full resolution at 4MP.

Government Response: Refer to question #38

Question 47: In “2.0 DESCTIPTION OF WORK” under 2.4 calls out for (2) NVR but the rest of the document only calls out for (1) NVR. Do we need to provide (1) or (2) NVR?

Government Response: Refer to question #23.

Question 48: Bldgs. 1184B, 1184C and 1184D are separated buildings? If so, is there an IDF at each building for existing communication back to main headend at 1184C? And how far apart are the buildings from each other.

Government Response: This information cannot be provided as this is a geographically separated building. All interested contractors were afforded the opportunity for a site visit in order to gain understanding in the layout of the facility and the current structure.

Question 49: If Bldgs. 1184B, 1184C and 1184D are all part of the same building, do any of the cameras exceed the CAT6 distance limitation of 330 feet back to room 1184C 105? If there are please provide a list of cameras that exceed the distance of 330 feet.

Government Response: This information cannot be provided as this is a geographically separated building. All interested contractors were afforded the opportunity for a site visit in order to gain understanding in the layout of the facility and the current structure.

Question 50: Are all space drop tiles or hard lid ceiling?

Government Response: Hard lid ceiling

Question 51: Are we able to get a site plan that shows the buildings in relation to each other?

Government Response: A request for a layout of the facility through Naval Facilities can be submitted but there will be a delay in getting those details back.

Question 52: The spec calls out for (3) 24 port POE switches, if there are 75 cameras, the (3) switches will not be able to accommodate 75 cameras. If the building B, C and D are all part of the same building it is possible to provide (2) 48 port POE switches. If the building B, C and D are separated buildings there will need to be an extra POE switch added

Government Response: 3.1 of the Statement of work is incorrect in identifying 68 indoor cameras. The correct number is 63 indoor cameras and 7 outdoor cameras for a total of 70 cameras.

Question 53: Do any of the exterior cameras need to be mounted above 15 feet?

Government Response: No

Question 54: Can conduit be surfaced mounted?

Government Response: No, wiring and conduit must be minimally visible

Question 55: Will conduit need to be red or will conduit need to be painted to match existing and red banded?

Government Response: No, conduit does not need to be painted as it will not be surface mounted.

Question 56: Can existing conduit be reused?

Government Response: If there is room in the existing conduit.

Question 57: Will off-hour work be required?

Government Response: No regular work hours will be maintained in accordance with SOW.

Question 58: For the RFP what is the order of precedence, code or scope of work?

Government Response: Refer to the Statement of Work

Question 59: In the event of conflict between scope of work and code what will be preferred?

Government Response: Refer to Statement of Work

Question 60: Please confirm if the project is limited to Building 1514 only, or if additional structures are included under the contract?

Government Response: Building 1184B, 1184C, and 1184D are the only buildings that will be worked on. Building 1514 is not part of this project.

Question 61: Are existing camera locations to remain the same, or is reconfiguration or repositioning required per site assessment or updated surveillance needs?

Government Response: Existing camera locations will remain.

Question 62: Please clarify if the contractor is responsible for removing and disposing of existing cameras and cabling, or if that will be handled separately by the government.

Government Response: All old equipment will be removed from the building and turned over to the government for disposition.

Question 63: Are existing as-built drawings of the current camera system available for contractor reference?

Government Response: There are not any drawings or plans other than the layout that was offered during solicitation.

Question 64: The solicitation references a Design Build approach, can you confirm if the awarded contractor is expected to provide full design submittals for approval prior to installation?

Government Response: Solicitation does not explicitly reference a Design Build approach.

Contractors are allowed to submit designs (optional) as part of the submitted quote package.

Please refer to Addendum 52.212-2 for evaluation factors.

Question 65: Is there a required or preferred brand/model for the cameras and associated hardware? If not, are there minimum technical requirements (e.g., resolution. night vision)?

Government Response: Both sets of numbers are approximately the same. All dimensions provided are approximate. In regard to brands/models refer to question #35

Question 66: Is integration with a base wide video management system (VMS) required? If so, please provide system specs and points of contact for coordination.

Government Response: This system will be stand-alone and will not be integrated with any other systems or networks.

Question 67: Will existing electrical and data infrastructure support the new camera system, or is the contractor responsible for upgrading or installing new lines?

Government Response: The contactor will be required to install all new equipment, to include upgrading current cable to CAT6 cable, and any other upgrades necessary to make this a turn-key, fully functional system.

Question 68: Please confirm the distance limitations between camera locations and available power/network access points, if applicable.

Government Response: No distance limitations exist.

Question 69: In the contractor responsible for complete system testing, commissioning, and training of government personnel upon completion?

Government Response: yes (outlined in 1.0 of the SOW). In addition, inspection and acceptance will be coordinated by requirement’s end user and approved by CO before invoice can be submitted.

Question 70: Please confirm the format and content expected for project closeout documentation (e.g. redlines, warranty documentation, O&M Manuals).

Government Response: Final inspection will be conducted prior to project closeout to ensure a fully functional system is being turned over by the contractor to the government. Electronic PDF user manuals and warranty details shall be turned over to the government during final inspection.

Training on the installed shall also be conducted prior to closeout.

Question 71: Can you please confirm if the construction schedule must be submitted exclusively in Microsoft Project format?

Government Response: This is not a construction project, therefore is not applicable.

Question 72: Please confirm whether the camera system—including cameras, network video recorders (NVRs), switches, and workstations—is required to be compliant with FIPS 140-2 or FIPS 140-3, as defined by the National Institute of Standards and Technology (NIST) for cryptographic security.

a. If FIPS compliance is required:

i. Must all components in the system be FIPS-validated or is compliance limited to devices handling authentication or encrypted communications (e.g., VMS/NVR)?

ii. Is FIPS certification required at the hardware level, software level, or both?

Government Response: Refer to question #34

Question 73: Will all existing camera cabling be required to be removed and replaced in its entirety as part of this contract? During the job walk, it was observed that much of the existing cabling is likely legacy coaxial or otherwise unsuitable for a modern IP-based camera system, particularly for Power over Ethernet (PoE) operation.

Government Response: Refer to question #67

Question 74: The SOW (Section 2.6) states: “The contractor shall install new CAT6 lines for the camera inputs in Bldgs 1184B, 1184C, and 1184D...” However, it is unclear whether this applies to all camera locations or only new camera locations. If reuse of existing cabling is not permitted or viable due to technical incompatibility, a full cabling replacement scope should be confirmed to avoid scope interpretation discrepancies and ensure performance compliance.

Government Response: New CAT6 cable shall be ran to all cameras and equipment. No old cabling will be reused from the existing system.

Question 75: Given that the existing buildings have hard-lid ceilings, and multiple installation methods are technically feasible, please confirm the required installation method for routing new camera cabling. To ensure uniformity in pricing and system integrity across all bidders, please indicate which of the following approaches is acceptable or preferred by the Government:

b. Fully Enclosed Conduit System – Surface-mounted EMT or similar raceway on walls and ceilings.

c. Minimally Visible Concealed Conduit – Conduit installed in wall or ceiling spaces where possible, with minimal exposed pathways.

d. Unsecured Ceiling Cavity Cabling – Free-run cabling laid loosely above the ceiling tiles (if any accessible spaces exist).

e. Supported Ceiling Cavity Cabling – Cabling routed through the ceiling space with dedicated J-hooks or cable tray support.

Government Response: Refer to question #54

Question 76: If the Government requires the camera system cabling to be installed using concealed methods—such as running conduit or cable behind walls, above hard-lid ceilings, or within finished spaces—please confirm whether the contractor will be responsible for repairing all resulting damage to wall, ceiling, or surface finishes caused during installation.

Government Response: Yes the contractor will be responsible for returning all government property to its original state to include but not limited to repairing removal of sheetrock and painting to original color. Also refer to Question #54 for conduit.

Question 77: If so, please amend the Statement of Work to explicitly state that the contractor shall:

i. Repair all penetrations, patch holes, and restore disturbed finishes (e.g., drywall, paint, ceiling texture, etc.)

ii. Coordinate with base personnel on acceptable finish standards for visible repair areas.

Government Response: See section 6 Site Maintenance and Clean Up of the Statement of Work.

Question 78: Please confirm whether there is currently an existing network infrastructure between Buildings 1184B, 1184C, and 1184D that can be utilized to transmit video and control data for the new camera system. Specifically:

iii. Is there an existing network backbone (fiber or copper) that connects these buildings?

iv. Is the existing infrastructure available and authorized for use by this stand-alone camera system?

f. If no such inter-building network exists or it is not permitted to be used, please confirm the required method for establishing connectivity between buildings- for example:

i. Installation of new inter-building fiber pathways?

ii. Surface or underground conduit trenching requirements?

iii. Required termination locations?

Government Response: There is a current camera system in place that ties in all camera feed to the control room in 1184C. This system is stand-alone so it will not rely on a network.

Question 79: Should the proposed systems be FIPS compliant?

Government Response: Refer to question #34

Question 80: Should the proposed systems have existing ATOs that can be referenced?

Government Response: An ATO is not necessary since the system will not be connected to the Air Force or Navy networks.

Question 81: Is it acceptable for the proposed systems to require ongoing fees or subscriptions for software updates? Ex. Software Service Agreements (SSA), Software Update Plan (SUP), Annual Channel Licenses

Government Response: Yes, however, these services will be reviewed for approval on an annual basis.

Question 82: Are audio capabilities required for every camera or should audio be included for common areas such?

Government Response: No, audio capabilities were not included in the requirement.

Question 83: What is the minimum retention requirement for all saved video? 30, 45, 60, 90-days?

Government Response: No less than 30 days

Question 84: How old is the facility?

Government Response: Unknown

Question 85: How much square footage is in the facility?

Government Response: unknown. This information can be requested through Naval Facilities but there will be a delay in getting this information.

Question 86: How stable is the power?

Government Response: There are not any issues with the power stability.

Question 87: Is there a dropped ceiling in all areas of installation?

Government Response: No, the ceilings are hard lid ceilings

Question 88: What type of walls are in the perimeter areas?

Government Response: unknown

Question 89: Do we need to drill between the walls, to run our cable infrastructure?

Government Response: The only new drilling that should be required will be to install the new cameras that are not replacing existing ones.

Question 90: Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?

Government Response: All cable shall be ran through conduit…unknown on the total needed.

Question 91: Are the door frames metal and concrete filled?

Government Response: Unknown

Question 92: Please provide a comprehensive list of quantities of all IDS items needed to include model # (e.g. total number of motion sensors, glass breaks, etc.) per location.

Government Response: No IDS requirements are needed. This system will be utilized for the safety and security of Airmen in a dormitory setting.

Question 93: Do you currently have existing IDS Sensors in your doors? Please specify which doors.

Government Response: no

Question 94: What is the manufacturer of the existing IDS system?

Government Response: N/A

Question 95: Will we be able to reuse the existing cable? If so, what type of cable is there currently?

Government Response: Refer to question #67

Question 96: Are Ceilings Suspended? Or Hard Lid?

Government Response: hard lid

Question 97: Are there existing Cable Trays for wiring above ceilings?

Government Response: no, all conduit is currently routed through the ceiling in conduit.

Question 98: Can Existing Wiring be utilized?

Government Response: No

Question 99: Is a “UPS” required? If so, What Time/Power Duration is required?

Government Response: Not required.

Question 100: Are “Or Equal” Equipment substitutions allowed?

Government Response: Specifications do not state brand name or equal. All products need to meet or exceed the SOW and specifications.

Question 101: Is “Plenum Wire” acceptable?

Government Response: Refer to question #18

Question 102: Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?

Government Response: Refer to question #57

Question 103: What is the height of Exterior Cameras? (If any)

Government Response: unknown what the exact height is. Under 15’

Question 104: Please provide a list of equipment and parts # that are to be installed.

Government Response: Interested vendors should create a solution and provide the list of required materials along with a quote to the government.

Question 105: Are there pipe chases between floors?

Government Response: unknown

Question 106: Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed?

Government Response: payments for accomplished CLINs can be invoiced

Question 107: How many feet of new wire will have to be run?

Government Response: unknown

Question 108: What kind of cipher lock and quantities are required e.g. X-10

Government Response: none