Attachment 3 QA.pdf

PDF 57 KB Posted

Attached to
JBSA Chiller Repair at Graduation Welcome Center B6330
Solicitation number
FA301625Q0130
Issued by

About this file

This document is a Questions and Answers (Q&A) file for the JBSA Lackland Chiller Repair at B6330 Graduation federal contract opportunity. The Q&A addresses several key contract details, including warranty terms, tax exemption, bonding requirements, and project specifics. Key points include: the government will consider a one-year warranty but is open to pricing for a five-year warranty option, the project is tax-free, no bid or performance bonds are required, and no preconstruction submittals are needed beyond warranty documentation. The government confirmed that no training is included in the package, and a CE HVAC technician will be onsite during startup. The document references Attachment 4 for the equipment data plate, which provides details about the chiller's brand, serial, and model number.

View the file

Other files

File Type Posted
Attachment 4 Data Plate.jpg JPG image
Attachment1 SOW B6330 CHILLER 2.docx DOCX document
Solicitation - FA301625Q0130.pdf PDF
Attachment 2 Wage Determination 2015-5253 Rev 25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301625Q0130 JBSA Lackland Chiller Repair at B6330 Graduation

Q&A

Questions: Answers:

The Attachment 1 SOW paragraph 6.a “Warranty” indicates a 5-year parts and labor warranty. Our standard is a 1-year parts and labor warranty, and extending to 5-years will add considerable fee to accommodate. Will the Government consider a 1-year warranty or must we submit fee based on 5-year warranty?

We will consider the one year as all government contracts must include a one year warranty. If possible please include pricing for the option of the 5 year warranty.

Will this project be exempt from state and/or local sales and gross receipts taxes?

Yes all government contracts are tax free

Is the Contractor required to provide a Bid Bond?

Not required per the solicitation

Is the Contractor required to provide a Payment and Performance Bond?

Not required per the solicitation

Will the Contractor be required to prepare and submit any preconstruction, product, or closeout submittals? If so, can the Government clarify what submittals?

There are no pre construction submittals as this is a service. we do require warranty documents to be provided.

Does the Contractor need to provide any training as part of the package?

No training will be included in this package CE HVAC tech will be onsite once start up is to take place.

Can you please provide us with a photo of the data plate for the equipment that includes brand name, serial and model number of the chiller?

Please see Attachment 4 for the data plate photo.