FA301624Q0121 - Question and Answers.docx
DOCX document 22 KB Posted
- Attached to
- Repair Water Well Services Federal contract opportunity
- Solicitation number
- FA301624Q0121
About this file
This document consists of Questions and Answers related to the federal contract opportunity for the Repair Water Well Services solicitation number FA301624Q0121. The key details are:
The solicitation is for the replacement of the pump for Water Well #8, including the removal of the current submersible pump, repair of related electrical, mechanical, and controls systems components, and testing/reporting of the water well delivery system per TCEQ regulations. The government provided responses to questions regarding the static water level, dynamic water level, artesian flow, current pump/motor data, original installation date, discharge point, and potential causes of failure. The government indicated the well pump is not operational and needs to be replaced, and that a separate solicitation for the removal of the current pump would not be considered. The solicitation is set-aside for small businesses, and questions were required to be submitted by August 15, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA301624Q01210002.pdf | ||
| Solicitation Amendment - FA301624Q01210001.pdf | ||
| Solicitation - FA301624Q0121.pdf | ||
| WD 2015-5253_REV 24_Dated 22 July 2024.pdf | ||
| Statement of Work 24July2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
November 28, 2023
Notice ID: FA301624Q0121 Water Well #8 Replacement Pump Questions and Answers
1. Question: What is the static water level?
Government Response: As of Feb 29, 2016, the static head was estimated around 300 feet below ground level.
2. Question: What is the dynamic water level?
Government Response: The current dynamic water level is unknown.
3. Question On the well log from 2016 (Tracking #430648) it says there is 800 gallon per minute artesian flow. Is it known if the well is still currently artesian?
https://www3.twdb.texas.gov/apps/waterdatainteractive//GetReports.aspx?Num=430648&Type=SDR-Well Government Response: The well is currently free flowing Artesian.
4. Current pump and motor data?
Government Response: The current pump and motor data is 150 HP submersible pump.
5. When was the original installation date?
Government Response: The original installation date is 2016
6. What is the discharge point of the well? Into a Reservoir?
Government Response: The discharge point for this well is in Salado Creek.
7. Possible causes of failure?
Government Response: The well pump is not operational and needs to be replaced.
8. Would it be possible to write a separate solicitation for the removal of the current pump, inspection of the pump and system? To remove the current pump and scope the pipes it will require a truck with a well crew and a crane with separate crew due to the door height, depth and location of the current pump.
Government Response: No, the well pump is not operational and needs to be replaced.
9. If the answer to question 8 is “No”, would you consider quotes for the replacement of the entire system to include electrical components?
Government Response: No, the well pump is not operational and needs to be replaced.
10. Do you know the age and status of the current electrical system supporting the well?
Government Response: It was installed in 2016.