Updated Questions and Answers.docx_safe.docx
DOCX document 22 KB Posted
- Attached to
- Safety Office Furniture
- Solicitation number
- FA301624Q0101
About this file
This document is a set of Questions and Answers related to a federal contract opportunity for Safety Office Furniture at JBSA Lackland, TX. The key details are:
The contract opportunity is for the design and installation of office furniture for the 37th Training Wing at JBSA Lackland. The solicitation number is FA301624Q0101, and the agency is the Department of the Air Force Air Education and Training Command. Contractors can propose alternate manufacturers similar to the required Teknion LLC brand. The installation is located in the basement floor, approximately 250 feet from the truck offload site, and will utilize a passenger elevator. No furniture removal is required, and the contractor is not responsible for any electrical or data cabling services. Proposals are due by 10:00 AM CST on July 11, 2024. Attached drawings of the office and breakroom spaces are provided in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B2484_Basement_Floor_Plan_with_Room_Numbers_jyd_20220414.pdf | ||
| Questions and Answers.docx | DOCX document | |
| Questions and Answers.docx_safe.docx | DOCX document | |
| 37 TRW Safety Office Furniture Salient Characteristics.pdf | ||
| 37TRW Safety Office Furniture SOW Rev3.docx | DOCX document | |
| Solicitation - FA301624Q0101.pdf | ||
| Safety Office - Salient Characteristics.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| 502 CONS/JBKAE | FA301624Q0101 |
| JBSA Lackland, TX | Safety Office Furniture |
QUESTIONS & ANSWERS: Cut-off date for contractor questions is 10:00 AM CST, 11 July 24.
Question 1: Can you please provide Attachment 2, 737 TRG IT and Scheduling Section Office Presentation
Government Response: N/A
Question 2: Can you please provide and drawings available for the office spaces and breakroom, preferably in AutoCAD format if available.
Government Response: Attached Question 3: What floor(s) is this installation on?
Government Response: Basement floor Question 4: Approximately how far is it from the truck offload site to the install location?
Government Response: 250 feet Question 5: Are there any stairs that the product will need to go up or down to reach the install location?.
Government Response: Yes there are stairs but an elevator is available for use Question 6: Will we use a passenger or freight elevator for delivery to the install location?
Government Response: Passenger elevator Question 7: Are any electrical or data cabling services required by the contractor, or will the Government be providing those services with the contractor provided parts?
Government Response: No Question 8: Do we need to provide an electrician to attach the systems furniture to building power? If so, do we need to pull new circuits from the electrical panel or will we attach to existing power at walls/columns?
Government Response: No Question 9: Regarding the existing product that needs removal/disposal, what is the quantity and type of furniture needing to be removed/disposed of? Will it all fit in the dumpster(s) provided.
Government Response: No furniture needs to be removed; only trash you generate from installing furniture will need to be disposed of. Trash should fit in the provided dumpsters.
Question 10: Please provide further description of furniture listed only with manufacturer specific terms. “ H-A-Mech”, “HA L Taper Pen”, “H-A-L Shaped Worksurface”, “20” D-Low Secondary Desk”… Government Response: See attached.
Question 11: What manufacturer is used for the solicitation? Can an alternate manufacturer, similar to this be quoted?
Government Response: Teknion LLC. Yes another manufacturer may be used