FA301622U0017

Amendment #2 2 December 2021

1. The purpose of this amendment is to provide the government's response to questions submitted by contractors.

2. Contractor questions and government responses are below.

Contractor Question 1: 1. Is the power source to come from a generated back up source? Is the whole building generator back up?

Government Response: Modular furniture is to be connected to the facility power at the wall sockets, outlets are on different breakers/circuits. There is no generator backed, hence, the UPS batteries referenced below.

Contractor Question 2: Will there be a check at building for all tools, material and personal daily? Is electrical contractor allowed carts?.

Government Response: All craftsman and any carts that they use to transport material or tools, will be checked to ensure that no unauthorized items are brought into the facility.

Contractor Question 3: Are the 4 duplex outlets required to be dedicated circuit per duplex (1 duplex outlet / 1 circuit outlet) or branched ( 4- duplex on 1 circuit )?

Government Response: One circuit per workstation “L”.

Contractor Question 4: Can the electrical contractor come off any available panel or is there a specific panel requested?

Government Response: Modular furniture is to be connected to the facility power at the wall sockets.

Contractor Question 5: During the walk thru the electrical contractor observed small back up UPS on “example of final product” behind furniture. Will the electrical contractor / general contractor be responsible for providing Back up UPS unit ?

Government Response: No, the government is responsible for the UPS battery back-up.

3. Please acknowledge receipt of this amendment with your quote as follows:

Amendment #2, RFQ FA301622U0017, Dated 2 December 2021

SUBJECT: Contractor Acknowledgement

TO: 502 CONS/JBKAB

I acknowledge receipt of this Amendment.

Authorized Signature

Date