SOW Stabilize Lead-Based Paint Building 2250.pdf
PDF 823 KB Posted
- Attached to
- Stabilize Lead-Based Paint Building 2250 Federal contract opportunity
- Solicitation number
- FA301621Q0126
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FP_JBSF-2250-1.pdf | ||
| Solicitation Amendment - FA301621Q01260001 Conformed Copy.pdf | ||
| FP_JBSF-2250-3.pdf | ||
| FP_JBSF-2250-2.pdf | ||
| B2250 Site Visit QA.docx | DOCX document | |
| Solicitation Amendment FA301621Q01260001 SF 30.pdf | ||
| JBSF02250 - JBSA LBP Containing Materials Inventory Report.pdf | ||
| Environmental_Spec_01 57 20.pdf | ||
| Atch 5 Contractor Responsibility Questionnaire B2250.docx | DOCX document | |
| Atch 2 Wage Determination Rev 14.pdf | ||
| Atch 6 HAZMAT Letter_B2250.docx | DOCX document | |
| Atch 4 Financial Information Questionnaire B2250.docx | DOCX document | |
| SOW Capsulate Lead Paint Bldg 2250.pdf | ||
| Solicitation - FA301621Q0126.pdf | ||
| Atch 3 Unescorted Access Request Form.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Stabilize Lead-Based Paint Building 2250
Joint Base San Antonio Sam Houston (JBSA-SAM) Texas
16 August 2021
PART 1 – SCOPE OF WORK
1.1 GENERAL: The objective of this project is to remove lead based paint and stabilize Building 2250. The contractor shall provide all parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary to accomplish tasks in the Statement of Work
(SOW).
1.2 PROJECT DESCRIPTION: Provide labor and materials to remove and stabilize lead-based paint (LBP) at Building 2250 located at 2404 New Braunfels Ave, Joint Base San Antonio Sam Houston (JBSA-SAM) Texas.
• Cover the ground 360 degrees around the building, up to 15 feet, to prevent contamination.
• Remove LBP from exterior surfaces of the building. This includes all 11,550 SF of wood and metal surfaces, stairways, walls, patio areas, decking, ceiling, (2500 LF exterior base boards) and fascia of the building.
• Stabilize and remove all contaminated debris and properly dispose of it from the government installation in accordance with Environmental Protection Agency (EPA) regulations.
• Follow all safety protocols for LBP remediation.
• Wear proper Personal Protective Equipment (PPE) while in contaminated area.
• Provide proper lift equipment, specialized equipment, restroom facilities, and dumpster to accomplish the project.
• Maintain good housekeeping before, during and after work-in-progress to ensure safe work area.
• All trash shall be properly disposed of in a dumpster at the end of every day. No trash shall be left on or around dumpster.
• Upon completion of project, an assessment shall be conducted by a third party (e.g., JBSA
Environmental Flight) for negative exposure verification.
• Civil Engineer personnel and facility manager shall review completed work before contractor is released from project.
• Facility shall be in clean order upon completion of project. Remove all tools/personnel/equipment/trash from installation.
• All work shall be accomplished in accordance with OSHA, EPA, and state regulations to include, but not limited to, OSHA CFR 1926.62 Lead in Construction rules.
1.3 WORK AND MECHANICS: Only certified journeymen in each respective trade, or apprentices under the direct supervision of a certified journeyman shall be permitted to work on this project. Individual trade work for this project shall be performed by a certified person in this trade. The Contractor shall coordinate and perform all operations in a manner that will result in a professionally completed project. Work shall be in strict accordance with prevailing industry standards and manufacturer’s instructions.
1.4 WORKING CONDITIONS: Control signage is required by the contract, and shall remain for duration of project.
1.4.1 WORK SCHEDULE: Working hours are between 7:00 a.m. and 5:00 p.m. excluding Saturdays, Sundays, and federal holidays.
1.4.2 INSTALLATION ACCESS: Contractor employees shall meet minimum security requirements in order to gain access to JBSA - SAM. All personnel shall be able to produce personal identification when required by current installation Force Protection conditions or special instructions.
1.4.2.1. The Contractor shall obtain installation passes. The following information is required:
names, drivers’ license numbers, the state where license was issued and date of birth. Provide the information to the 502 CES Planning Section personnel seven days prior to start date.
1.4.2.2 All approved Contractors report to the JBSA-SAM Visitors Center to obtain access passes. Persons with a recent arrest will not be authorized to enter the post. The Contractor shall coordinate with the following points of contact (POC):
Planning Technician Mr. Eddie Velez – edward.velez@us.af.mil
Work (210) 671-5142 Cell (210) 383-6122
Planning Section Lead Mr. Victor Reyna – victor.reyna@us.af.mil
Work (210) 671-3924 Cell (210) 831-1150
1.5 SAFETY & REFERENCES: All Contractor operations shall be conducted and performed in accordance with the all applicable Department of Labor (DOL) and the Occupational Safety and Health Administration (OSHA) requirements. The following publications and websites listed herein shall be the most current editions in effect at the time of solicitation and form a part of this Statement of Work.
29 Code of Federal Regulations (CFR) 1910 (1910.146 and 1910.147) 29 CFR 1926.62 Lead in Construction Rule National Electrical Code (NEC) JBSA Environmental Specifications 01 57 20
1.5.1 All companies who conduct business within the state of Texas must, in accordance with Texas Worker’s Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Worker’s Compensation Commission (TWCC), shall be submitted For Information Only (FIO) in accordance with paragraph, SUBMITTALS. In addition to meeting the TWCC requirements; the plan must also include the requirements of COE Safety Manual 385-1-1.
1.5.2 Resolution of DOL citations for violations of OSHA standards is a Contractor responsibility and shall not provide basis of a claim against the Government.
1.7 SITE MAINTENANCE AND CLEANUP
1.7.1 SITE MAINTENANCE: The Contractor shall protect adjacent property, buildings and their contents from dust, dirt or other materials. Work areas shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All streets and roadways in/or adjacent to the site shall remain free of project generated trash and debris at all times.
mailto:edward.velez@us.af.mil mailto:victor.reyna@us.af.mil
1.7.2 CLEAN UP: The Contractor shall collect all trash, refuse, etc., generated and place it in appropriate containers with lids or approved covers on a periodic basis for the duration of the project. Contaminated debris shall be hauled from the site by appropriate means on a daily basis, unless otherwise approved by 502 CES Planning Section POC. Disposal shall be outside the limits of Government property. Disposal shall be by sanitary landfill or other approved methods and shall conform to all local, state, and federal guidelines, criteria, and regulations.
1.8 DELIVERY, STORAGE AND PARKING: All equipment delivered and stored shall be protected from the weather, humidity and temperature variation, dirt and dust, and any other contaminants.
1.9 CONTRACTOR STORAGE: The 502 CES Planning Section POC shall designate Contractor storage and parking area.
1.10. STORAGE AREAS: All project storage areas shall be kept free of debris, leaks, stains, or splashes and kept in a neat, clean, and safe condition. Any contamination of the storage area by a hazardous substance shall be immediately remediated by the Contractor, at no additional expense to the Government. All paints, thinners, and other hazardous materials shall be secured when not in use.
1.10.1 UTILITIES CONSERVATION: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which shall include: Lights shall be used only in areas where and when work is actually being performed. The Contractor shall not adjust mechanical equipment controls for heating, ventilation, and air conditioning systems. Water faucets or valves shall be turned off after the required usage has been accomplished. The Contractor shall not use base telephones and provide their own means of communication. The Contractor shall use good judgment in the conservation of Government utilities. Prevailing energy conservation practices shall be adhered to and enforced by the Contractor.
PART 2 – ENVIRONMENTAL REQUIREMENTS
2.1 COMPLIANCE WITH LAWS: Work site activities are NOT exempt from air emission, storm water, hazardous waste, and other environmental compliance rules and regulations. The Contractor shall comply and ensure Sub-Contractors comply with all applicable federal, state, and local laws, regulations, ordinances and standards related to environmental matters (see Section 1.5. JBSA Environmental Specifications 01 57 20). The Contractor shall also comply and ensure Subcontractors comply with all specific instructions or directions given to the Contractor by JBSA-SAM regarding environmental matters.
2.2 PROTECTION OF HISTORICAL AND ARCHAEOLOGICAL RESOURCES: All known historical, archaeological, and cultural resources, if any, within the Contractors work area will be designated on the contract Technical Exhibits. The Contractor shall take precautions during the contract to preserve all resources, as they existed at the time of contract award and comply with the Archaeological and Historic Preservation Act (AHPA) and the Archaeological Resources Protection Act (ARPA). The Contractor shall provide all protective devices such as off limit markings, fencing, barricades or other devices as designated on the contract Technical Exhibits and shall be responsible for preservation of the sites during this contract.
2.3 HAZARDOUS AND SPECIAL WASTES GENERATED BY THE CONTRACTOR:
The Contractor shall identify, characterize, containerize, store and dispose of hazardous wastes in strict accordance with federal guidelines found in the Code of Federal Regulations, Title 40 (40 CFR) parts 260-270, state regulation 30 TAC 335, all local guidelines, and as specified. A Uniform Hazardous Waste Manifest shall be used by the Contractor to document all parties and locations involved in the transportation, storage and disposal of all hazardous and special wastes.
This form shall be provided to the Government by the Contractor and signed by an approved Base Environmental Coordinator before the waste is transported from the limits of Government property. A copy of the manifest shall be signed by the receiver of the waste and submitted to the approved Base Environmental Coordinator not later than 45 days after disposal has taken place. Hazardous waste treatment, storage and disposal facility shall be located within the state of Texas, permitted by the EPA, and approved by the Base Environmental Coordinator.
2.4 CONTRACTOR ENCOUNTERED HAZARDOUS WASTE: The Contractor shall notify the 502 CES Planning Section POC upon encountering any material not identified in this Statement of Work thought to be hazardous that could jeopardize the safety of workers or personnel in the area. The Government will be responsible for characterization, transportation, storage and disposal of the waste if necessary.
2.5 ASBESTOS: To the best of the Government's knowledge, no asbestos-containing material (ACM) will be encountered during this project. Should the Contractor encounter unidentified or suspected ACM which must be disturbed to comply with the contract documents, the Contractor shall cease work and immediately notify the 502 CES Planning Section POC. The Government will take steps, as appropriate, to ascertain the material's composition and determine any remedial actions necessary.
2.6 NUISANCE AND POLLUTING ACTIVITY PROHIBITED: Polluting, dumping, or discharging of any harmful, nuisance, or regulated materials (such as but not limited to concrete truck washout, vehicle maintenance fluids, residue from saw cutting operations, solid waste and hazardous substances) into building drains, site drains, streams, waterways, holding ponds or to the ground surface shall not be permitted and the Contractor shall be held responsible for any and all damages which may result. Further, the Contractor shall conduct work activities in such a fashion as to avoid creating any legal nuisance, including but not limited to, suppression of noise, dust, control of erosion, and implementation of other measures as necessary to minimize offsite impacts of work activities.
PART 3 – SITE VISIT
3.1 VERIFICATION OF DIMENSIONS AND CONDITIONS: The Contractor shall visit the premises to become thoroughly familiar with details of the project and working conditions;
field verify all dimensions and advise the 502 CES Planning Section POC of any discrepancies before starting the work.
3.2 GOVERNMENT FURNISHED EQUIPMENT (GFE): None
END OF STATEMENT OF WORK
| 16 August 2021 |
| 1.4 WORKING CONDITIONS: Control signage is required by the contract, and shall remain for duration of project. |
| PART 3 – SITE VISIT |