JBSF02250 - JBSA LBP Containing Materials Inventory Report.pdf

PDF 347 KB Posted

Attached to
Stabilize Lead-Based Paint Building 2250 Federal contract opportunity
Solicitation number
FA301621Q0126
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Stabilize Lead-Based Paint Building 2250, newest first.
File Type Posted
FP_JBSF-2250-1.pdf PDF
Solicitation Amendment - FA301621Q01260001 Conformed Copy.pdf PDF
FP_JBSF-2250-3.pdf PDF
FP_JBSF-2250-2.pdf PDF
B2250 Site Visit QA.docx DOCX document
Solicitation Amendment FA301621Q01260001 SF 30.pdf PDF
SOW Stabilize Lead-Based Paint Building 2250.pdf PDF
Environmental_Spec_01 57 20.pdf PDF
Atch 6 HAZMAT Letter_B2250.docx DOCX document
Atch 4 Financial Information Questionnaire B2250.docx DOCX document
SOW Capsulate Lead Paint Bldg 2250.pdf PDF
Solicitation - FA301621Q0126.pdf PDF
Atch 3 Unescorted Access Request Form.pdf PDF
Atch 5 Contractor Responsibility Questionnaire B2250.docx DOCX document
Atch 2 Wage Determination Rev 14.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBSA LBP Inventory Print Report

Lead Based Paint Detected:

Administrative

Square Footage: 7297

Number of Floors: 3

None.tif

Drawing File Name:

Facility Status: Manned

FSH_2250.JPG

Photo File Name

Date Constructed: 1908

Facility Number: Facility Name:02250 ADMIN GEN PURP

Facility Owner: 502 ABW

Facility Type:

Facility Address: 2404 N. New Braunfels Ave.

Facility Summary Report:

None

Facility Site: JBSA Fort Sam

ViewFacility Comments:

Facility Comments:

9 8/27/2020 0.06 0.01out A Top Stair Handrail Metal 1st Poor Negativ

10 8/27/2020 0.25 0.021st Floor C Center Stair Handrail Metal 1st Poor Positiv

11 8/27/2020 0.2 0.021st Floor C Lower Stair Handrail Metal 1st Poor Positiv

12 8/27/2020 0.18 0.021st Floor C Lower Posts Metal 1st Poor Positiv

13 8/27/2020 1.41 0.061st Floor C Lower Posts Metal 1st Poor Positiv

14 8/27/2020 0.16 0.021st Floor C Lower Posts Metal 1st Poor Positiv

15 8/27/2020 0.22 0.021st Floor C Handrail Ballusters Metal 1st Poor Positiv

16 8/27/2020 0.13 0.021st Floor C Handrail Ballusters Metal 1st Poor Positiv

17 8/27/2020 0.1 0.011st Floor C Handrail Ballusters Metal 1st Poor Positiv

18 8/27/2020 0.15 0.022nd Floor C Top Stair Handrail Metal black Poor Positiv

19 8/27/2020 0.24 0.022nd Floor C Center Stair Handrail Metal black Poor Positiv

20 8/27/2020 0.12 0.022nd Floor C Lower Stair Handrail Metal black Poor Positiv

21 8/27/2020 0.12 0.022nd Floor C tair Handrail Balluster Metal black Poor Positiv

22 8/27/2020 0.13 0.022nd Floor C tair Handrail Balluster Metal black Poor Positiv

23 8/27/2020 0.13 0.022nd Floor C tair Handrail Balluster Metal black Poor Positiv

LBP Report File Name(s):

FSH 2250 (Basement) - Bulk Sa

FSH 2250 (First Floor) - Bulk Sa

FSH 2250 (Second Floor) - Bulk

FSH 2250 - Asbestos and Lead

FSH 2250 - Lead COC.pdf

FSH 2250 - Lead Results.pdf

FSH 2250- Photo Report.pdf

Date User Comment

8/27/2020 elv Work Task 10025636 Assess porch handrails and stairs, support columns and porch deck for LBP (lead-based paint) -- All components excluding the porch decks and stairs painted gray are Positive for LBP. Any disturbance of materials by scraping sanding, or abrasive blasting , must be done by an EPA or OSHA Lead trained team. OSHA 29 CFR 1926.62 Lead In Construction rules will apply.

Sample Date Room Side Quadrant Component Substrate Color Condition Pb PbErr Result

24 8/27/2020 0.13 0.022nd Floor C Top Stair Handrail Metal black Poor Positiv

25 8/27/2020 0.97 0.072nd Floor C Center Stair Handrail Metal black Poor Positiv

26 8/27/2020 0.25 0.032nd Floor C Lower Stair Handrail Metal black Poor Positiv

27 8/27/2020 0.21 0.022nd Floor C Lower Support Columns Wood blacko Poor Positiv

28 8/27/2020 5 0.282nd Floor C Lower Support Columns Wood blacko Poor Positiv

29 8/27/2020 5 0.312nd Floor C Lower Support Columns Wood white Poor Positiv

30 8/27/2020 5 0.352nd Floor C Lower Support Columns Wood white Poor Positiv

31 8/27/2020 0 02nd Floor C Lower Porch Deck Wood gray Poor Negativ

32 8/27/2020 0 02nd Floor C Lower Stair Treads Metal black Poor Negativ

33 8/27/2020 0.37 0.022nd Floor C Lower Stair Treads Metal black Poor Positiv

34 8/27/2020 1.81 0.132nd Floor C Lower Stair Risers Metal black Poor Positiv

35 8/27/2020 2.22 0.152nd Floor C Lower Stair Stringer Metal black Poor Positiv

36 8/27/2020 0.77 0.051st Floor A Lower Stair Newell Posts Metal black Poor Positiv

37 8/27/2020 0.14 0.021st Floor A Lower Stair Newell Posts Metal black Poor Positiv

38 8/27/2020 0.23 0.021st Floor A Lower Stair Newell Posts Metal black Poor Positiv

39 8/27/2020 0.16 0.021st Floor A Lower Stairs Concrete gray Poor Positiv

40 8/27/2020 0.02 01st Floor A Lower Stair Risers Concrete gray Poor Negativ

41 8/27/2020 0.02 0.011st Floor A Lower Stair Handrail Metal gray Poor Negativ

42 8/27/2020 0.21 0.031st Floor A Lower Stair Handrail Metal gray Poor Positiv

43 8/27/2020 0.11 0.021st Floor A Lower Handrail Baluster Wood black Poor Positiv

44 8/27/2020 0.81 0.041st Floor A Lower Handrail Baluster Wood black Poor Positiv

45 8/27/2020 5 0.431st Floor A Lower Support Columns Wood white Poor Positiv

46 8/27/2020 5 0.451st Floor A Lower Support Columns Wood white Poor Positiv

47 8/27/2020 0.82 0.041st Floor A Lower Support Columns Wood white Poor Positiv

Date Collected Sample ID

Analysis Method Reporting Limit Mass Mass Unit Concentration Unit Measure

2250‐L1

Lead ‐ Chips 7000B 0.011 0.11 % wt 0.11 % wt

5/6/2013

2250‐L2

Lead ‐ Chips 7000B 0.5 6.8 % wt 6.8 % wt

5/6/2013

2250‐L3

Lead ‐ Chips 7000B 0.96 16 % wt 16 % wt

5/6/2013

2250‐L4

Lead ‐ Chips 7000B 1.2 19 % wt 19 % wt

5/6/2013

2250‐L5

Lead ‐ Chips 7000B 0.1 2.6 % wt 2.6 % wt

5/6/2013

2250‐L6

Lead ‐ Chips 7000B 1 19 % wt 19 % wt

5/6/2013

2250‐L7

Lead ‐ Chips 7000B 0.01 0.013 % wt 0.013 % wt

5/6/2013

2250‐L8

Lead ‐ Chips 7000B 0.05 0.66 % wt 0.66 % wt

5/6/2013

2250‐L9

Lead ‐ Chips 7000B 0.03 <0.030 % wt <0.030 % wt

5/6/2013

2250‐L10

Lead ‐ Chips 7000B 0.01 <0.010 % wt <0.010 % wt

5/6/2013

File details come from the government source that posted it. Updated .