SOW - 11 Aug 20 - Amendment 1.pdf
PDF 608 KB Posted
- Attached to
- Overhead Door System Federal contract opportunity
- Solicitation number
- FA301620U0240
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ - Overhead Door - Amendment 2.pdf | ||
| Overhead-2.jpg | JPG image | |
| Responses to Questions.pdf | ||
| RFQ - Overhead Door - Amendment 1.pdf | ||
| Overhead-1.jpg | JPG image | |
| Operating Box-2.jpg | JPG image | |
| Operating Box-1.jpg | JPG image | |
| Motor.jpg | JPG image | |
| Overhead-3.jpg | JPG image | |
| RFQ - Overhead Door.pdf | ||
| SOW - 11 Aug 20.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 1
STATEMENT OF WORK
FOR
JBSA Randolph Hangar 84, 502d Trainer Development Squadron Replace Overhead Door System
NAME OF INSTALLATION: Joint Base San Antonio (JBSA) - Randolph
PART 1 – SCOPE OF WORK:
1.1 GENERAL: The work to be performed under this contract and in accordance with this Statement of Work shall consist of furnishing all necessary parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work shown in the Statement of Work, and all applicable codes, regulations, standards, and criteria in effect at the date of solicitation. All services rendered shall be conducted by industry subject matter experts. Prior to performing electrical work the master electrician shall provide proof of applicable license.
1.2 BACKGROUND: The existing roll-up overhead door system in the northwest corner of Building 84 was damaged beyond repair during repair operations when failure of the limit switch bound the door in the up position. The garage door is bolted into place and has about three feet of space at the bottom where sheet metal had to be placed in order to seal off the rest of the garage door. No tracks are present.
1.3 PROJECT DESCRIPTION/INSTALLATION: The Contractor shall provide one complete door replacement to include all the hardware and safety devices needed. The door is not name brand, but the hardware that is being replaced has to be equal (visually and mechanically) to the existing roll up door which measures 25’W x 21’H.
1.3.1 Remove and dispose of the existing unserviceable door system and components to include: Curtain, head plate, drum, guides, electric operators, end locks, hardware, seals, safeties, hood, and disconnect.
1.3.2 Install complete new and fully operational door system to include all necessary components curtain, head plate, drum, guides, electric operators, end locks, push button hardware, seals, safeties, hood, electrical wires, disconnect, etc. When you remove your finger from the push button the garage door should stop in place (in current position). Existing parts that are operational will not be used. The system as a whole needs to be replaced with brand new items. The Contractor shall dispose of the Door System, all its components and all generated waste at an off-base city or state approved disposal site.
1.3.3 Match color (base standard federal color #37778 or equivalent found at Sherman Williams) of existing curtain to maintain conformity with other door systems within the facility. The new door curtain shall consist of a minimum of 20 gauge steel slats or greater and have a powder coated finish.
This is not the actual door being repaired. It is just an illustration of what it looks like. Pictures of the door can be found in a separate attachment of the Amendment package.
1.3.4 Install new electrical gearhead operators which meet or exceed load requirements of the new door system. Contractor is responsible for verifying the horse power, phase, and electrical voltage of the motors are all equal to the specifications in the attached Motor Specs photo.
1.3.5 Install new safety sensor mechanism (i.e. “photo eyes”) located at the bottom edges of the door curtain in accordance with (IAW) manufacturer specifications.
1.3.6 Configure electrical operator switch to be constant pressure (i.e., “dead man” switch”) IAW manufacturer specifications to ensure opening and closing of door curtain can be manually performed by personnel pressing the actuator switch or button.
1.3.7 Install self-adjusting loop bottom astragal to seal from inclement weather.
1.3.8 The approximate dimensions of the existing unserviceable door system are 25’ W x 21’ H. The Contractor shall be responsible for verifying exact dimensions required for new door system installation.
1.3.9 Perform function checks in physical presence of Government representative to ensure safety. Practice good housekeeping before, during and after work in progress to ensure safe work area. Specialized equipment (e.g. motorized lift) is provided by the Contractor. If the contractor cannot secure the building at the end of the day, the contractor has to provide an 8’ tall link fence and all accessories in order to install it with one of the following options:
• Run an 8’ tall chain link fence the width of the door and secure on both sides. It can be tack welded to the tracks and cut off the next day.
• If that is not an option then contractor can utilize two (2) metal poles with a square plate anchored to the concrete and the fence attached to both poles.
• Or secure the fence to the metal beams of the building.
1.4 LOCATION: 10055 NEW A ST, Joint Base San Antonio Randolph (Universal City), Texas, 78150, Hangar 84
1.5 WORKING CONDITIONS: Work shall be performed primarily at location listed in Section 1.4 within a gated area near the aircraft apron. Contractor shall coordinate entry with the 502d CES (Civil Engineer Squadron) Planning Technician Edward Velez 210 671-5142(see Section 1.5.2) and/or Facility Manager prior to each working day. In addition, contractor shall comply with all applicable safety standards and regulations to include, but not limited to, those listed in Section 1.6 of this Statement of Work.
1.5.1 WORKING HOURS: Working hours for the Contractor will normally be between the hours of 7:30 a.m. and 4:30 p.m. excluding Saturdays, Sundays, and Federal holidays. EXCEPTION: Facility will be closed for business every other Friday. The contractor is not required to perform work during federal holidays. (New Year's Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day)
1.5.2 WORK AREA ACCESS: The 502 CE shall coordinate base passes from Planning Section, Mr.
Edward Velez at (210) 671-5142 or the Facility Manager, Mr. Ernest Boulet (210) 652-3299.
1.6 SAFETY: All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 (1910.146 and 1910.147), NFPA 780, and 29 CFR 1926, and Air Force Occupational Safety & Health (AFOSH) AFOSH standards including 91-25.
Specifically, the Contractor shall comply with Air Force Manual 91-203, Chapter 13 Fall Protection when performing work at heights. The Contractor shall also ensure that all work is performed in accordance with project identified national standards, military manuals, instructions, pamphlets, standards, and handbooks, and with the edition in effect on the date of this solicitation. The contractor shall have a hot works permit from Randolph AFB prior to any welding or open flame torches being used. Coordination will be submitted through Mr. Edward Velez and he will initiate the paperwork.
1.7 SITE MAINTENANCE: The Contractor shall protect adjacent property, buildings and their contents from dust, dirt or other materials. Training areas shall be maintained in a neat, clean, and safe condition.
Furthermore, work areas shall, at a minimum, be cleaned at the end of each shift. All streets and roadways in/or adjacent to the site shall remain free of project generated trash and debris at all times.
1.8 REFERENCES: All publications listed herein shall be the most current editions in effect at the time of solicitation and form a part of this Statement of Work. The publications are referred to in the text by basic designation only and include but are not limited to the following:
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 Life Safety Code
OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION (OSHA)
OSHA STD 29 C.F.R. 1910 and 1926
CODE OF FEDERAL REGULATIONS
Code of Federal Regulations, Title 40 (40 CFR), Protection of Environment, parts 260-270
AIR FORCE MANUAL
Air Force Manual 91-203, Occupational Safety, Fire, and Health Standards
1.9 WARRANTY: The Contractor shall identify all items being installed that are guaranteed or under warranty for a minimum one-year period, and provide validated copies of the manufacturer’s warranty. All warranty information shall be filed by the Contractor in the Government’s name and submitted to the Project Manager upon Delivery. All warranties shall be identified by product with a listing of the name and address of the company and the expiration date of the guarantee or warranty.
1.10 UTILITIES CONSERVATION: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which shall include: The Contractor shall not adjust mechanical equipment controls for heating, ventilation, and air conditioning systems. Water faucets or valves shall be turned off after the required usage has been accomplished. The Contractor shall not use base telephones and provide their own means of communication. The Contractor shall use good judgment in the conservation of Government utilities.
1.11 QUALITY ASSURANCE: The government will perform inspection and acceptance of contractor work.
1.12 MANUALS: The Contractor shall provide all applicable manufacturers recommendations and operating instructions to the designated Planning Technician or Planning Section Lead.
Attachments
1. Motor Specs
2. Operating Box-1
3. Operating Box-2
4. Overhead-1
5. Overhead-2
6. Overhead-3
END OF STATEMENT OF WORK