Generator_reprograming_Q&A_2.docx

DOCX document 21 KB Posted

Attached to
Generator Reprogramming
Solicitation number
FA301619U0010
Issued by

About this file

2nd batch of questions from the site visit.

View the file

Other files

File Type Posted
generator_reprogramming_Q&A_posted_on_FBO.docx DOCX document
Wage_Determination_Aug_2018.pdf PDF
RFQ_FINAL__Gen_Reprog__FA301619U0010.pdf PDF
generator_reprogram_FINAL_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Generator Reprogramming [Type here] FA301619U0010 1). Does the 502nd electrical shop have the ability to make changes in the software?

Government Answer:

No

2) Is the Cummins Engineer Password available?

Government Answer:

Power Pro input.

3) What is the normal kW load for the buildings that these generators serve?

Govenrment Answer:

This power plan will be supporting for the new IT portion in the facility 313 only, this facility just completed few month ago, the IT's equipment is still move in, the real demand load cannot verify until the May 2019.

(c) Will this load be over 70%? Can the existing loads be turned on/off to accommodate testing during normal hours?

Government Answer:

No, The IT building is critical load contractor/we cannot turn off the load.

4) (a) If the building load is not over 70% is a load bank needed to test generator paralleling?

Government Answer:

yes, & Power Pro input.

(b) Is there a place to tie in a load bank?

Government Answer:

yes, Power Pro Input,

(c) Will the 502nd provide a load bank if necessary?

Government Answer:

yes , the 502CES-CEOF will be responsible.

5) Under Paragraph D. Onsite Service states that the implementation, debug and testing should occur during regular hours. (a) Are multiple power outages for testing acceptable during normal hours?

Government Answer:

No multiple outages, the testing will be coordinated with the 313 facility manager (PM).

(b) Will the 502nd provide personnel to facilitate load shed/load add, ie. turning breakers on and off?

Government Answer:

No, the test operation will be by the contractor and the CE will be supported.

6) We have spoken to the engineering controls vendor and they stated that their availability in December 2018 is limited. Can this project be executed in 1Q2019?

Government Answer:

This can is something we can look into, in the meantime please annotate that you want to start in 1Q2019 in your RFQ.

7) It appears that all field wiring is functional at this time. Please confirm that it is acceptable to use existing field wiring.

Government Answer:

Yes