SOW-_SAND_Erosion.pdf
PDF 268 KB Posted
- Solicitation number
- FA3016-18-U-0242
About this file
Statement of Work-Canyon Lake Beach Erosion
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Canyon Lake Beach Erosion at the JBSA Recreation Park, Canyon Lake
1. DESCRIPTION OF WORK / GENERAL INFORMATION. The Contractor shall provide all management, tools, supplies, equipment and labor necessary in order to bring in and spread beach materials at the Joint Base San Antonio (JBSA) Recreation Park at Canyon Lake in a manner that will maintain a satisfactory facility condition.
1.1. DESCRIPTION OF WORK: Beach Sand (Hancock Cove Beach)
1.1.1. The Contractor shall source 2,590 cubic yards of Natural sand-beach type (not manufactured). The sand material sourced by the Contractor shall be preapproved by
Canyon Lake Manager prior to delivery.
1.1.2. The Contractor shall deliver sand material to the Hancock Cove Beach and dumped in area approved by the Canyon Lake Manager.
1.1.3. The Contractor shall spread the material to a uniform, smooth appearance with an average depth of 8”.
1.1.4. The Contractor shall spread the material to cover designated beach area affected by erosion.
1.1.5. The Contractor shall take measures to ensure drainage channel that runs through center of beach remains after work is accomplished.
1.1.6. Finished product shall be drug smooth and consistent in appearance.
1.2. GENERAL INFORMATION.
1.2.1. After an award has been made, the Contractor and Canyon Lake Manager will visit the job site to verify location, conditions, quantities, and requirements prior to starting work.
1.2.1.1. The Contractor shall coordinate all operations with the Canyon Lake Manager.
1.2.1.2. While performing work under this contract the Contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health to avoid accident or injury to persons or property.
1.2.1.3. All work performed by the Contractor shall be inspected and approved by the Canyon
Lake Manager or designee.
1.2.2. QUALITY ASSURANCE. The government will evaluate the Contractor’s performance each time service is performed. The government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints.
Likewise, the government may decrease the number of quality control inspections if performance dictates.
1.2.3. GOVERNMENT REMEDIES. The Contracting Officer shall follow the requirements of
FAR 52.212-4, Contract Terms and Conditions for Commercial Items (Jan 2017), for Contractor’s failure to correct nonconforming services.
1.2.4. HOURS OF OPERATION: The work shall be performed during normal duty hours( 0800-
1700) Monday through Friday. Additional/supplemental hours may be approved by the Canyon
Lake Manager.
1.2.5. SECURITY REQUIREMENTS. The Contractor shall obtain access to JBSA Recreation
Park property by arrangement through the Canyon Lake Manager. Passes, gate codes, access times to be issued and preapproved by park management.
1.2.5.1. The Contractor shall be responsible for safeguarding government property associated with or affected by the required work. At the end of the duty day, facilities and equipment will be secured in the maintenance area (or other approved locations designated by the Canyon Lake
Park Manager).
2. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The government will provide without cost to the Contractor the utilities necessary (limited to water and electricity) to accomplish the tasks specified in this SOW. The government will provide adequate rest room facilities for Contractor’s use. The government will provide security gate access to the property for the Contractor (specifically if hours of operation exceed normal hours of operation). The government will ensure that a qualified government/ facility representative is on-hand and/ or available at all times during work (for consultation, questions, etc.).
3. APPENDICES.
A. Maps and/or Site Plans
APPENDIX A
MAPS AND/OR SITE PLANS
Approximate Beach Sand Improvement Area at JBSA Canyon Lake
File details come from the government source that posted it.