Atch_11_-_Sample_Cost_Estimate_Breakdown.xls

XLS spreadsheet 33 KB Posted

Attached to
Lead Paint Abatement and Painting FA3016-18-R-0058
Solicitation number
FA3016-17-R-0058
Issued by

About this file

Sample Cost Estimate Breakdown

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Details

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
General Construction Subtotal$0.00
General Construction Labor Burden
100.00%RSMeans San Antonio, TX CCI
General Construction Subcontractor Overhead
General Construction Subcontractor Profit
General Construction Prime Contractor Overhead
General Construction Prime Contractor Profit
General Construction Prime Contractor Bonding
General Construction Contingency0.00%$0.00
CONTRACT FOR (Work to be performed)This cost proposal is valid for ______________________________daysProposed Project Amount$0.00
Remove and Repaint Hangar 6The period of performance to perform this work is ___________ days.
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
JBSA-Randolph, TX
LINE
NO.ITEM DESCRIPTIONUNIT OF
MEASUREMATERIAL COSTSLABOR COSTSEQUIPMENT COSTSOTHER COSTSLINE

TOTAL

$0.00$0.00$0.00$0.00
1B2013-156-1030 Gypsum Board, Prepare SurfaceSF$0.00$0.00
2B2013-156-1030 Paint Surface, roller, primer + 1 coatSF$0.00$0.00
3B2013-156-1030 Paint Surface, roller, 2 coat (Assume 70% [above] cost with no primer)SF$0.00$0.00
4B2013-158-1010 Cut out and recaulk, siliconeLF$0.00$0.00
5Gross Wet Scrape and dispose of LBPSF$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00

File details come from the government source that posted it.