Attachment 17 - MAHG211126 Relace CDC Floors FA and MNS B308 MSS R1.xls
XLS spreadsheet 55 KB Posted
- Attached to
- CDC Renovation
- Solicitation number
- FA3010R
About this file
This document is a material submittal schedule for a federal contract to replace floors, false ceilings, and mechanical and electrical systems at a CDC facility. The schedule outlines 23 items requiring material submittals from the contractor, including flooring, wall bases, ceiling panels, electrical devices, and communications equipment. Submittals are due between 10 and 20 days after notice to proceed based on the material type. The contractor must provide one hard copy and one digital copy of each submittal. The schedule includes fields to track submission dates, review periods, approval status, and resubmittal details. The related solicitation is for the CDC renovation project, with a pre-bid site visit on August 17, 2022 and proposals due September 12, 2022 to the Department of the Air Force Air Education and Training Command.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG211126 | Project Title: | ||
| Replace CDC Floors, FA and MNS B308 | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 3 | 3 | 5 Days Prior to Start Date | ||||||||||||||||||
| 2 | HazMat MSDS | 3 | 3 | 5 Days Prior to Start Date | Must be filled out if Contractor answers YES to to the HazMat questinnaire | |||||||||||||||||
| 3 | HazMat Reporting Entry Form | 3 | 3 | 5 Days Prior to Start Date | Submot Final Quantities | |||||||||||||||||
| 4 | HazMat Reporting entry Form | 3 | 3 | End of Contract | ||||||||||||||||||
| 5 | Recycling and Landfill Report | 3 | 3 | End of Contract | ||||||||||||||||||
| 6 | Warranty (Manufacture's) | 3 | End of Contract | |||||||||||||||||||
| 7 | 1-Year Warranty (Contractor's) | 3 | End of Contract | |||||||||||||||||||
| 8 | Section 074500-Preformed Soffit Panel | 1 | 1 | 1 | 1 | 3 | 10 Days Following NTP | |||||||||||||||
| 9 | Section 074500- | 10 Days Following NTP | ||||||||||||||||||||
| 8 | Section 096519- Resilient Tile Flooring | 3 | 3 | 3 | 3 | 3 | 3 | 10 Days Following NTP | ||||||||||||||
| 9 | Section 096813-Tile Carpeting | 3 | 3 | 3 | 3 | 3 | 3 | 10 Days Following NTP | ||||||||||||||
| 10 | Section 096513-Rubber Wall Base | 3 | 3 | 3 | 3 | 3 | 3 | 10 Days Following NTP | ||||||||||||||
| 10 | Section 096813-Tile Carpeting | 1 | 1 | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||
| 11 | Section 096516- Resilient Sheet Flooring | 3 | 3 | 3 | 3 | 3 | 3 | 10 Days Following NTP | ||||||||||||||
| 10 | ||||||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | (2 Hard copy in binder, and 1 digital copy of each) | |||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 | ||||||||||||||||||||||
| 12 | Transition Strip | 3 | 3 | 3 | 3 | 3 | 3 | 10 Days Following NTP | ||||||||||||||
| 13 | Misc. Electrical Material | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 14 | Fire Alarm Panel | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 15 | Mass Notification Panel | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 16 | Conduit | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 17 | Wire | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 18 | MNS Antenna | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 19 | Fire Alarm Devices | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 20 | MNS Devices | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 21 | Electrical Breakers | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 22 | Salelandings | 3 | 3 | 20 days following NTP | ||||||||||||||||||
| 23 | MONDO | 3 | 3 | 20 days following NTP |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .