Attachment 5 MAHG211126 CDC Floors FA MNS B308 SPECS.pdf
PDF 689 KB Posted
- Attached to
- CDC Renovation Federal contract opportunity
- Solicitation number
- FA3010R
About this file
This document package includes specifications for replacing floors, fire alarm, and mass notification systems at the Centers for Disease Control and Prevention facility in Biloxi, Mississippi. The specifications cover rubber wall base, resilient sheet and tile flooring, and tile carpeting. Product requirements include thickness, size, performance criteria for flame spread and smoke density, and sustainable materials. Installation instructions are provided. The related federal contract opportunity is a solicitation from the Department of the Air Force for the CDC renovation project. Site visits will be held on August 17th and sealed bids are due by September 12th.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT:
REPLACE CDC FLOORS, FIRE ALARM AND
MASS NOTIFICATION SYSTEM
PROJECT NUMBER: MAHG 21-1126
March 24, 2022
KEESLER AIR FORCE BASE BILOXI, MISSISSIPPI
Keesler AFB 508 L Street Keesler AFB, MS 39534
MAHG21-1126
INDEX
SECTION NAME
09 65 13 RUBBER WALL BASE
09 65 16 RESILENT SHEET FLOORING
09 65 19 RESILENT TILE FLOORING
09 68 13
TILE CARPETING
10/15/2021
SECTION 09 65 13_1/2
SECTION 09 65 13
RUBBER WALL BASE
Traditional & Perceptions™ Wall Base
PART 1 GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Rubber wall base
1.2 SUBMITTALS
A. Submit in accordance with the Statement of work.
1. Storage and handling requirements and recommendations.
2. Installation methods.
B. Verification Samples: For each finish product specified, two samples, representing actual product and finish.
C. Extra Stock: Submit extra stock equal to 10% of total installed.
1.3 QUALITY ASSURANCE
A. Manufacturer Qualifications: Minimum 5 year experience manufacturing similar products.
B. Installer Qualifications: Minimum 2 year experience installing similar products.
C. Performance: Fire performance meeting requirements of building code and local authorities.
1.4 PRE-INSTALLATION MEETINGS
A. Convene minimum two weeks prior to starting work of this section.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store products in manufacturer's unopened packaging bearing the brand name and manufacturer's identification until ready for installation.
B. Handling: Handle materials to avoid damage.
1.6 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits.
1.7 SEQUENCING
A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
PART 2 PRODUCTS
2.1 Rubber Wall Base – Specification based on Tarkett Traditional Duracove Wall Base; Rubber Wall Base product - submitted by Contractor - must meet or exceed the criteria put forth in this
SECTION 09 65 13_2/2
specification.
2.2 Manufacturer: Tarkett, Inc. (or equal)
Phone (800) 899-8916 30000 Aurora Road (440) 543-8916 Solon, Ohio 44023 Tech: Ext 9297 Web: www.johnsonite.com Samples: Ext 9299 Email: info@johnsonite.com Fax: (440) 543-8920
2.3 Product Description:
a. 1.2.1 Construction: Tarkett Wall Base (or equal) is to be manufactured from a proprietary rubber formulation designed specifically to meet the performance and dimensional requirements of ASTM F-1861, Type TV and TP, Group 1 (solid), Style A and B, Standard Specification for Resilient Wall Base.
b. 1.2.2 Physical Characteristics:
i. Rubber Wall Base: Traditional: DC-130 no toe, 0.125" thickness, 6" height (or equal).
ii. Available in 4' (1.22 m) straight lengths and 120' (36.58 m) coiled lengths.
2.0 PRODUCT PERFORMANCE AND TECHNICAL DATA
A. Meets or exceeds the performance requirements for resistance to heat/light aging, chemicals, and dimensional stability when tested to the methods, as described, in ASTM F-1861.
B. Flexibility: Will not crack, break, or show any signs of fatigue when bent around a 1/4" (6.4 mm) diameter cylinder.
C. Chemical resistance (ASTM F 925): Passes – 5% acetic acid, 70% isopropyl alcohol, mineral oil, 5% sodium hydroxide solution, 5% hydrochloric acid solution, 5% sulfuric acid solution, 5% household ammonia solution, and 5.25% household bleach solution.
D. Resistance to light (ASTM F 1515): ΔE< 8
E. Fire Resistance: Rubber Wall Base
1. ASTM E 84/NFPA 255 (Flame/Smoke) – Class A, < 450
2. ASTM E 648 (NFPA 253): Critical Radiant Flux – Class I
SECTION 09 65 13_3/2
PART 2 EXECUTION
2.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared.
B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
2.2 PREPARATION
A. Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
2.3 INSTALLATION
A. Install in accordance with manufacturer's instructions and in proper relationship with adjacent construction. Test for proper operation and adjust until satisfactory results are obtained.
B. Comply with recommendations of Carpet and Rug Institute 'Specifier's Handbook'.
PROTECTION
Protect installed products until completion of project.
Touch-up, repair or replace damaged products before Substantial Completion.
END OF SECTION
10/15/21
09 65 16 - 1
SECTION 09 65 16
RESILIENT SHEET FLOORING
1.1 SUMMARY
A. Section Includes:
1. Resilient sheet flooring (RSF) with chemically welded seams and integral cove base.
1.2 RELATED REQUIREMENTS
A. Resilient Base over Base of Lockers, Equipment and Casework: Section 09
65 13, RESILIENT BASE AND ACCESSORIES.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
1. D4259-88(2012) - Abrading Concrete.
2. E648-15e1 - Standard Test Method for Critical Radiant Flux of
Floor-Covering Systems Using a Radiant Heat Energy Source.
3. E662-15a - Standard Test Method for Specific Optical Density of
Smoke Generated by Solid Materials.
4. F1303-04(2014) - Sheet Vinyl Floor Covering with Backing.
5. F1860-14 - Rubber Sheet Floor Covering With Backing.
6. F1913-04(2014) - Vinyl Sheet Floor Covering Without Backing. C.
International Concrete Repair Institute (ICRI):
1. 310.2R-13 - Selecting and Specifying Concrete Surface Preparation for
Sealers, Coatings, and Polymer Overlays, and Concrete Repair.
D. SCS Global Services (SCS):
1. Floor Score.
1.4 SUBMITTALS
A. Submit in accordance with Statement of work.
1. Show size, configuration, and fabrication and installation details.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Application Installation instructions.
3. Warranty. C. Samples:
1. Sheet material, 38 mm by 300 mm (1-1/2 inch by 12 inch), of each color and pattern with welded seam using specified welding rod //
300 mm (12 inches) square for each type, pattern and color //.
2. Cap strip and fillet strip, 300 mm (12 inches) for integral base.
09 65 16 - 2
3. Shop Drawings and Certificates: Layout of joints showing patterns where joints are expressed, and type and location of obscure type joints. Indicate orientation of directional patterns.
4. Certificates: Quality Control Certificate Submittals and lists specified in paragraph, QUALIFICATIONS.
5. Edge strips: 150 mm (6 inches) long each type.
6. Primer: Pint container, each type. D. Sustainable Construction
Submittals:
1. Low Pollutant-Emitting Materials:
a. Sheet Flooring: Submit Floor Score label.
b. Identify volatile organic compound types and quantities.
E. Certificates: Certify products comply with specifications.
1. Heat welded seaming is manufacturer's prescribed method of installation.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Manufacturer with project experience list.
2. Installer with project experience list.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program.
1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:
a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.
b. Career long training.
c. Manufacturer endorsed training.
d. Fundamental journeyman skills certification.
B. Mockup: Build floor tile mockup to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution
1. Size: 9.3 sq. m (100 sq. ft.) for each type, color, and pattern.
Locations as indicated on construction documents.
09 65 16 - 3
2. Contracting Officer Representative (COR) approved mockup may become part of the completed Project if undisturbed at time of Substantial
Completion.
C. Furnish product type materials from the same production run.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store products indoors in dry, weather tight conditioned facility.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS A.
Environment:
1. Work Area Ambient Temperature Range: Minimum 18 to 38 degrees C (65 to 100 degrees F) continuously, beginning 48 hours before installation. Maintain room temperature above 18 degrees C (65 degrees F) after installation.
2. Install products when building is permanently enclosed and when wet construction is completed, dried, and cured.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant resilient sheet flooring against material and manufacturing defects.
1. Warranty Period: 2 years.
PART 2 - PRODUCTS 2.1 SYSTEM
PERFORMANCE A. Sheet Flooring:
1. Critical Radiant Flux: ASTM E648; 0.45 watts per sq.cm or more, Class I.
2. Smoke Density: ASTM E662; less than 450.
09 65 16 - 4
2.2 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide vinyl sheet color and pattern from one production run.
C. Sustainable Construction Requirements:
1. Low Pollutant-Emitting Materials: Comply with VOC limits specified in
Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:
a. Flooring Adhesives and Sealants.
b. Vinyl Sheet Flooring.
2.3 RESILIENT SHEET FLOORING
A. Resilient Sheet Flooring (RSF): ASTM F1913; Vinyl, without backing.
1. Wear Surface: Smooth.
2. Thickness: 2 mm (0.080 inches).
B. Resilient Sheet Flooring (RSF): ASTM F1303; Type II, Grade 1, vinyl, with backing.
1. Wear Surface: Smooth.
2. Wear Layer Thickness: Minimum 0.51 mm (0.020 inches).
3. Total Thickness: 2 mm (0.080 inches).
C. Sheet Size: Provide maximum size sheet produced by manufacturer to minimize joints.
1. Minimum Width: 1200 mm (48 inches).
2.4 WELDED SEAM SHEET FLOORING
A. Welded Seam Sheet Flooring (WSF): ASTM F1860; Type I rubber, with backing.
1. Wear Surface: Smooth.
2. Wear Layer Thickness: Minimum 1.0 mm (0.040 inches).
3. Total Thickness: 2 mm (0.080 inches).
B. Sheet Size: Provide maximum size sheet produced by manufacturer to minimize joints.
1. Minimum Width: 1200 mm (48 inches).
2.5 ACCESSORIES
A. Bonding Chemical: Flooring manufacturer's standard seam bonding chemical.
B. Welding Rod: Flooring manufacturer's standard, in color matching field color of sheet flooring.
09 65 16 - 5
C. Adhesives: Water resistant type recommended by flooring manufacturer to suit application. D. Base Accessories:
1. Fillet Strip: 19 mm (3/4 inch) radius fillet strip compatible with flooring material.
2. Cap Strip: J-Shape extruded flanged reducer strip compatible with flooring material approximately 25 mm (1 inch) exposed height with 13 mm (1/2 inch) flange. E. Leveling Compound:
1. Provide cementitious type with latex or polyvinyl acetate resins additive.
F. Primer:
1. Type recommended by adhesive or flooring manufacturer.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
C. Remove existing sheet flooring to permit new installation.
1. Do not use solvents for removing adhesives.
2. Dispose of removed materials.
D. Ensure interior finish work such as plastering, drywall finishing, concrete, terrazzo, ceiling work, and painting work is complete and dry before installation.
1. Complete mechanical, electrical, and other work above ceiling line.
2. Ensure heating, ventilating, and air conditioning systems are installed and operating in order to maintain temperature and humidity requirements.
E. Correct substrate deficiencies.
1. Fill cracks, pits, and dents with leveling compound.
2. Grind, sand, or cut away protrusions. Grind high spots.
3. Level flooring substrate to 3 mm (1/8 inch) maximum variation.
F. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.
1. Mechanically clean concrete floor substrate according to ASTM
D4259.
2. Surface Profile: ICRI 310.2R CSP 3 to CSP 4.
G. Perform flooring manufacturer’s recommended bond, substrate moisture content, and pH tests.
H. Broom or vacuum clean substrates immediately before flooring installation.
09 65 16 - 6
I. Primer: Apply primer according to manufacturer’s instructions.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
3.3 INSTALLATION OF FLOORING A.
Flooring Layout:
1. Arrange pattern in one direction with side and end joints pattern matched.
2. Extend flooring wall-to-wall, under cabinets, casework, laboratory and pharmacy furniture, and other equipment for seamless flooring installation.
3. Arrange sheets to minimize seams.
4. Locate seams in inconspicuous and low traffic areas, minimum 150 mm
(6 inches) away from parallel joints in flooring substrates. B.
Match edges of flooring for color shading and pattern at seams.
C. Install flooring flush with adjacent floor finishes.
D. Extend flooring into toe spaces, door reveals, closets, and similar openings.
E. Install flooring fully adhered to substrate.
1. Air pockets or loose edges are not acceptable.
2. Trim sheet materials tight to flooring penetrations; seal joints at pipe with waterproof sealant specified in Section 07 92 00, JOINT
SEALANTS.
F. Butt joints tight, without gaps and bulges.
G. Installation of Edge Strips:
1. Install edge strips at flooring terminations and transitions to other floor finishes.
2. Locate edge strips under center lines of doors unless otherwise indicated.
3. Set edge strips in adhesive and mechanically fasten to substrate.
3.4 INTEGRAL COVE BASE INSTALLATION
A. Set preformed fillet strip at floor intersection with walls and other vertical surfaces.
B. Extend flooring over fillet strip and (6 inches) up wall surface.
09 65 16 - 7
C. Form straight or radius internal and external corners to suit
Application.
D. Adhere base to wall surface.
E. Terminate base exposed top edge with cap strip. Seal cap strip to wall with sealant.
F. Weld joints as specified for flooring.
3.5 HEAT WELDING
A. Heat weld joints of flooring and base using welding rod.
B. Rout joint, insert welding rod into routed space, and fuse flooring and welding rods for seamless, watertight installation.
1. Fuse joints for seamless weld.
C. Finish joints flush, free from voids, and recessed or raised areas. 3.6
CHEMICAL WELDING
A. Chemically weld joints of flooring and base using bonding chemical.
1. Avoid excess bonding chemical and damage to flooring surfaces.
B. Apply bonding chemical to fuse flooring for seamless, watertight installation.
C. Finish joints flush, free from voids, and recessed or raised areas.
3.7 CLEANING
A. Remove excess adhesive before adhesive sets.
B. Clean and polish materials.
C. Vacuum floor thoroughly.
D. Perform initial maintenance according to flooring manufacturer’s instructions.
1. Delay washing flooring until adhesive is fully set and welded joints can contain wash water.
3.8 PROTECTION
A. Protect flooring from traffic and construction operations.
B. Keep traffic off sheet flooring for minimum 24 hours after installation.
C. Cover flooring with reinforced kraft paper, and plywood or hardboard.
D. Remove protective materials immediately before acceptance.
E. Repair damage.
- - E N D - -
09 65 19 - 1
SECTION 09 65 19
RESILIENT TILE FLOORING
PART 1 - GENERAL
1.1 DESCRIPTION:
A. This section specifies the installation of solid vinyl tile flooring, luxury vinyl tile, rubber tile and accessories required for a complete installation.
1.2 RELATED WORK:
1.3 SUBMITTALS:
A. Submit in accordance with Statement of Work.
B. Sustainable Design Submittals as described below:
1. Volatile organic compounds per volume as described in
PART 2 - PRODUCTS.
2. Postconsumer and pre consumer recycled content as described in
PART 2 - PRODUCTS.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Resilient material manufacturer’s recommendations for adhesives, underlayment, primers, and polish.
3. Application, installation and maintenance instructions.
D. Samples:
1. Tile: Each type, color, thickness and finish.
2. Edge Strips: Each type, color, thickness and finish.
3. Feature Strips: Each type, color, thickness and finish.
E. Shop Drawings:
1. Layout of patterns as shown on the construction documents.
2. Edge strip locations showing types and detail cross sections.
F. Test Reports:
1. Abrasion resistance: Depth of wear for each tile type and color and volume loss of tile, certified by independent laboratory. Tested per
ASTM F510/F510M.
2. Moisture and pH test results, SUBSURFACE PREPARATION FOR FLOOR
FINISHES.
09 65 19 - 2
1.4 DELIVERY:
A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.
B. Materials from containers which have been distorted, damaged or opened prior to installation are not acceptable.
1.5 STORAGE:
A. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives, and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.
1.6 QUALITY ASSURANCE:
A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL
Certification, or a certification from a comparable certification program.
1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:
a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.
b. Career long training.
c. Manufacturer endorsed training.
d. Fundamental journeyman skills certification.
B. Mockup: Build floor tile mockup to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Size: 9.3 sq. m (100 sq. ft.) for each type, color, and pattern.
Locations as indicated on construction documents.
2. Contracting Officer Representative (COR) approved mockup may become part of the completed Project if undisturbed at time of Substantial
Completion.
C. Furnish product type materials from the same production run.
09 65 19 - 3
1.7 WARRANTY:
A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of
Construction”.
1.8 APPLICABLE PUBLICATIONS:
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. ASTM International (ASTM):
D2047-11................Test Method for Static Coefficient of Friction of Polish-Coated Flooring Surfaces as Measured by the James Machine
D2240-05(R2010).........Test Method for Rubber Property—Durometer
Hardness
D4078-02(R2008).........Water Emulsion Floor Finish
E648-14c................Critical Radiant Flux of Floor Covering Systems
Using a Radiant Energy Source
E662-14.................Specific Optical Density of Smoke Generated by
Solid Materials
E1155/E1155M-14.........Determining Floor Flatness and Floor Levelness
Numbers
F510/F510M-14...........Resistance to Abrasion of Resilient Floor
Coverings Using an Abrader with a Grit Feed
Method
F710-11.................Preparing Concrete Floors to Receive Resilient
Flooring
F925-13.................Test Method for Resistance to Chemicals of
Resilient Flooring
F1344-12(R2013).........Rubber Floor Tile
F1700-13a...............Solid Vinyl Floor Tile
F1869-11................Test Method for Measuring Moisture Vapor
Emission Rate of Concrete Subfloor Using
Anhydrous Calcium Chloride
F2170-11................Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in Situ Probes
C. Code of Federal Regulation (CFR):
40 CFR 59...............Determination of Volatile Matter Content, Water
Content, Density Volume Solids, and Weight
Solids of Surface Coating
09 65 19 - 4
D. International Standards and Training Alliance (INSTALL):
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS:
A. Provide adhesives, underlayment, primers, and polish recommended by resilient floor material manufacturer.
B. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per
ASTM E648.
C. Smoke Density: Less than 450 per ASTM E662.
D. Slip Resistance – Not less than 0.5 when tested with ASTM D2047.
2.2 RUBBER TILE:
A. Tile Standard: ASTM F1344, Class I-A, homogeneous rubber tile, solid color.
B. Hardness: Not less than 85 as required by ASTM F1344 measured using
Shore, Type A durometer per ASTM D2240.
C. Wearing Surface: Hammered.
D. Thickness: 3.2 mm (0.125 inch).
E. Size: 610 x 610 mm (24 x 24 inches).
2.5 LUXURY VINYL TILE:
A. ASTM F1700, Class III, Printed Film Vinyl Tile, Type B.
B. Thickness: 12 mil (1/8 inch).
C. Size: 18” x 18”.
D. Provide products with recycled content with not less than 30 percent.
E. Chemical Resistance: ASTM F925; pass.
2.6 ADHESIVES:
A. Provide water resistant type adhesive for flooring, base and accessories as recommended by the manufacturer to suit substrate conditions. VOC content to be less than the 50 grams/L when calculated according to 40 CFR 59 (EPA Method 24). Submit manufacturer’s descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.
2.7 PRIMER FOR CONCRETE SUBFLOORS:
2.9 POLISH AND CLEANERS:
A. Cleaners: As recommended in writing by floor tile manufacturer.
B. Polish: ASTM D4078.
09 65 19 - 5
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS:
A. Maintain flooring materials and areas to receive resilient flooring at a temperature above 20 degrees C (68 degrees F) for three (3) days before application, during application and two (2) days after application, unless otherwise directly by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C (55 degrees F) thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
B. Do not install flooring until building is permanently enclosed and wet construction in or near areas to receive tile materials is complete, dry and cured.
3.2 SUBFLOOR TESTING AND PREPARATION:
A. Prepare and test surfaces to receive resilient tile and adhesive.
1. Remove existing resilient floor and existing adhesive.
B. Prepare concrete substrates in accordance with ASTM F710.
3.3 INSTALLATION:
A. Install in accordance with manufacturer's instructions for application and installation unless specified otherwise.
B. Mix tile from at least two containers. An apparent line either of shades or pattern variance is not acceptable.
C. Tile Layout:
1. If layout is not shown on construction documents, lay tile symmetrically about center of room or space with joints aligned.
2. Vary edge width as necessary to maintain full size tiles in the field, no edge tile to be less than 1/2 the field tile size, except where irregular shaped rooms make it impossible.
3. Place tile pattern in the same direction; do not alternate tiles unless specifically indicated in the construction documents to the contrary. Match tile installation to approved mockup.
D. Application:
1. Adhere floor tile to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, 09 65 19 - 6 telegraphing of adhesive spreader marks, and other surface imperfections.
2. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
3. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.
4. Roll tile floor with a minimum 45 kg (100 pound) roller.
E. Seal joints at pipes with sealants in accordance with Section 07 92 00, JOINT SEALANTS.
F. Installation of Edge Strips:
1. Locate edge strips under center line of doors unless otherwise shown on construction documents.
2. Set resilient edge strips in adhesive. Anchor metal edge strips with anchors and screws.
3. Where tile edge is exposed, butt edge strip to touch along tile edge.
4. Where thin set ceramic tile abuts resilient tile, set edge strip against floor file and against the ceramic tile edge.
3.4 CLEANING AND PROTECTION:
A. Clean adhesive marks on exposed surfaces during the application of resilient materials before the adhesive sets. Exposed adhesive is not acceptable.
B. Keep traffic off resilient material for a minimum 72 hours after installation.
C. Clean flooring as recommended in accordance with manufacturer’s printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and/or finish in accordance with manufacturer’s written instructions.
D. When construction traffic occurs over tile, cover resilient materials with reinforced kraft paper properly secured and maintained until removal is directed by COR. At entrances and where wheeled vehicles or carts are used, cover tile with plywood, hardboard, or particle board over paper, secured and maintained until removal is directed by COR.
09 65 19 - 7
E. When protective materials are removed and immediately prior to acceptance, replace damaged tile and mouldings, re-clean resilient materials.
3.5 LOCATION:
A. Unless otherwise indicated in construction documents, install tile flooring, under areas where casework, laboratory and pharmacy furniture and other equipment occur.
B. Extend tile flooring for room into adjacent closets and alcoves.
- - - E N D - - -
Section 09 68 13_1-5
SECTION 09 68 13
TILE CARPETING
PART1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the Statement of Work
(SOW).
1.2 SUMMARY
A. Section includes modular, carpet tile.
1.3 PREINSTALLATION MEETINGS
A. Pre-installation Conference:
1. Review methods and procedures related to carpet tile installation including, but not limited to, the following:
a. Review delivery, storage, and handling procedures.
b. Review ambient conditions and ventilation procedures.
c. Review subfloor preparation procedures.
d. Follow manufacturer's modular carpet installation guidelines and/or Carpet & Rug
Institute Installation Standard (the most recent version), where applicable.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include manufacturer's written specifications and lab documents for any physical testing.
2. Include installation recommendations for each type of substrate as specified in carpet manufacturer's installation guidelines and/or Carpet & Rug Institute Installation Standard (the most recent version), where applicable.
3. Include carpet maintenance recommendations as outlined by carpet manufacturer.
4. Carpet Manufacturer shall also submit a plan for recycling the specified carpet at the end of the useful life of the carpet.
B. Samples: For each of the following products and for each color and texture required.
Label each Sample with manufacturer's name, material description, color, pattern, and designation indicated on Drawings and in schedules.
1. Carpet Tile: Full-size Sample.
2. Exposed Edge, Transition, and Other Accessory Stripping: 12-inch long Samples.
C. Product Schedule: For carpet tile. Use same designations indicated on Drawings.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
B. Product Test Reports: For carpet tile, for tests performed by a qualified independent testing agency.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For carpet tiles to include in maintenance manuals. Include the following:
1. Methods for maintaining carpet tile, including cleaning and stain-removal products and procedures and manufacturer's recommended maintenance schedule.
Section 09 68 13_2-5
2. Precautions for cleaning materials and methods that could be detrimental to carpet tile.
1.7 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Carpet Tile: Full-size units equal to 5 percent of amount installed for each type indicated, but not less than 10.67 sq. yd.
1.8 QUALITY ASSURANCE
A. Contractor must comply with mandatory use Air Force Furnishings Commodity Council Tier 1 contracts manufacturers. The Carpet Program is covered under North American Industry Classification System (NAICS) code 314110 - Carpet and Rug Mills. The Product Service Code (PSC) for the Carpet Program is 7220 – Floor Coverings.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Comply with carpet manufacturer's installation recommendations and the Carpet & Rug Institute Installation Standard (the most recent version), where applicable.
1.10 FIELD CONDITIONS
A. Comply with carpet manufacturer's installation recommendations and the Carpet & Rug Institute Installation Standard (the most recent version) for temperature, humidity, and ventilation limitations.
B. Environmental Limitations: Do not deliver or install carpet tiles until spaces are enclosed and weather-tight, wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at occupancy levels during the remainder of the construction period.
C. HVAC system should be operational and running prior to carpet installation and remain running after carpet installation.
D. Do not install carpet tiles over concrete slabs until slabs have cured and are sufficiently dry to allow bond between adhesive and concrete. Concrete slabs should have moisture and have pH readings that are within the specified tolerance of the adhesive to be used.
E. Where demountable partitions or other items are indicated for installation on top of carpet tiles, install carpet tiles before installing these items.
1.11 WARRANTY
A. Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.
1. Warranty does not include deterioration or failure of carpet tile due to unusual traffic, failure of substrate, vandalism, or abuse.
2. Failures include, but are not limited to, more than 10 percent face fiber loss, edge raveling, dimensional instability, excess static discharge, loss of tuft bind strength, delamination, and where face fiber is 100 percent solution dyed, inability to remove acid based stains, lack of colorfastness to light, and lack of colorfastness to atmospheric contaminants.
3. Carpet and fiber must be manufactured and warrantied by same manufacturer.
4. Warranty Period: Lifetime Commercial Limited Warranty.
Section 09 68 13_3-5
PART 2 PRODUCTS
2.1 MANFACTURERS:
A. Carpet Tile/plank: Shall comply with mandatory use Air Force Furnishings Commodity Council carpet ordering. Carpet shall be acquired by a small business installer, dealer, or contractor using the following mandatory manufacturers holding Tier 1 contracts:
Approved manufacturers:
1. Shaw, Industries, Inc.:
Contract #: FA8057-17-C-0002 Website: www.shawfloors.com (only use AF Catalog below) POC: Eric Taylor and Farah Finley Phone: 706-532-7567 and 770-276-7505 Email: airforce.customer@shawinc.com Online Contact Form: https://airforce.shawinc.com/contact Air Force Catalog: https://airforce.shawinc.com/
2. Engineered Floors, LLC:
Contract #: FA8057-17-C-0003 Website: www.jjflooringgroup.com (only use AF Catalog below) POC: Debra Ramsey Phone: 800-241-4586 x88392 Email: usaf@engineeredfloors.com Air Force Catalog: https://jjflooringgroup.com/usaf/
3. Mohawk Carpet Distribution, Inc.:
Contract: FA8057-17-C-0004 Website: www.mohawkgroup.com (Only use AF Catalog below) POC: AnnaLeigh Warmack Kone and Scott Lang Phone: 706-879-6554 and 617-992-8164 Email: Contract_compliance@mohawkind.com Alternate Email: Scott_d_lang@mowhawkind.com Air Force Catalog: https:/airforce.mohawkgroup.com/
4. Commercial Marketing Associates, Inc. (CMA):
Contract: FA8057-17-C-0005 Website: www.cma-purchasing.com (Only use AF Catalog below) POC: Paul Snyder and Betty King Phone 888-669-0772 Email: AirForceCarpetBPA@cma-purchasing.com Air Force Catalog: https://www.cma-purchasing.com/wp-content/uploads/pdf/AFProductPortfolio.pdf
B. Contractor to choose one of the following: Shaw’s 59576 Disperse Ecoworx; Mohawk Group’s BT355 Riot QS Tile; J+J Flooring’s Indew; CMA Milliken’s Nordic Stories (Organic) – Tectonic, and must comply with the mandatory use Air Force Furnishings Commodity Council Tier 1 contracts.
C. Color must be chosen by owner. Confirm pattern / style and color with Contracting Officer. Install per manufacturer recommendations and instructions. Provide attached cushion backing in compliance with NSF/ANSI 140 sustainability standards. Provide low VOC wet adhesive, moisture proof, thermoplastic hard or thermoset backing option with a maximum thickness no greater than 0.250” for modular carpet tile.
http://www.shawfloors.com/ mailto:airforce.customer@shawinc.com https://airforce.shawinc.com/contact https://airforce.shawinc.com/ http://www.jjflooringgroup.com/ mailto:usaf@engineeredfloors.com http://www.mohawkgroup.com/ mailto:Contract_compliance@mohawkind.com mailto:Scott_d_lang@mowhawkind.com http://www.cma-purchasing.com/ mailto:AirForceCarpetBPA@cma-purchasing.com https://www.cma-purchasing.com/wp-
Section 09 68 13_4-5
2.2 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.
B. Trowelable Adhesives: Water-resistant, mildew-resistant, nonstaining, premium grade pressure-sensitive type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet tile and is recommended by carpet tile manufacturer for releasable installation.
1. Adhesives shall have a VOC content of 50 g/L or less when calculated according to
40 CFR 59, Subpart D (EPA Method 24).
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for maximum moisture content, alkalinity range, installation tolerances, and other conditions affecting carpet tile performance. Examine carpet tile for type, color, pattern, and potential defects prior to installation. See manufacturer's requirements for substrate conditions and ambient conditions.
B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following:
1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing moisture and pH tests as recommended by carpet tile manufacturer.
2. Subfloor finishes comply with requirements specified in Section 033000 "Cast-in- Place Concrete" for slabs receiving carpet tile.
3. Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits.
4. Lightweight concrete and gypcrete subfloors may require a primer such as Shaw
9050 or equivalent to reduce surface porosity.
5. Where previous surface treatments are unknown, or where other concerns exist as to the ability of the adhesive to bond to the substrate, a 24 hour bond test is recommended.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. General: Comply with Carpet & Rug Institute Installation Standard (the most recent version), "Site Conditions; Floor Preparation," and with carpet tile manufacturer's written installation instructions for preparing substrates indicated to receive carpet tile installation.
B. Use trowelable leveling and patching compounds that contain a cementitious base with a latex additive, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch wide or wider and protrusions more than 1/32 inch unless more stringent requirements are required by manufacturer's written instructions.
C. Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by carpet tile manufacturer.
D. Broom and vacuum clean substrates to be covered immediately before installing carpet tile.
Section 09 68 13_5-5
3.3 INSTALLATION
A. General: Comply with Carpet & Rug Institute Installation Standard (the most recent version), "Carpet Modules," and with carpet tile manufacturer's written installation instructions.
B. Installation Method: Glue down; install every tile with full-spread, releasable, pressure-sensitive adhesive or with a non-spreadable dry adhesive system, such as LokDots. Any non-spreadable adhesive system must adhere the carpet to the substrate.
C. Maintain dye lot integrity. Do not mix dye lots in same area unless the specific carpet tile style is manufactured as a merge-able dye lot product.
D. Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet tile manufacturer.
E. Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.
F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on finish flooring as marked on subfloor. Use nonpermanent, non-staining marking device.
G. Install pattern parallel to walls and borders.
H. Roll the entire installation with a 75 lb roller once installation is completed.
3.4 CLEANING AND PROTECTION
A. Perform the following operations immediately after installing carpet tile:
1. Remove excess adhesive, and other surface blemishes using cleaner recommended by carpet tile manufacturer.
2. Remove yarns that protrude from carpet tile surface.
3. Vacuum carpet tile using commercial machine with face-beater element.
B. Protect installed carpet tile to comply with Carpet & Rug Institute Installation Standard (the most recent version), "Protecting Indoor Installations."
C. When construction or move-in activities will continue where new carpet is installed, provide non-staining building material paper to protect carpet. Do not use plastic sheeting as it can trap moisture, and self-sticking plastic sheeting can transfer adhesive residue to carpet that will attract soil.
D. When heavy objects are moved over carpet within 24 hours of installation, use plywood over carpet to prevent buckling and wrinkling.
E. Protect carpet tile against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by carpet tile manufacturer.
END OF SECTION
| 00 10 20 Specification Title-Index |
| MAHG211126 Replace CDC Floors FA & MNS B308 SPECS-Attch. A |
| MAHG211126 Replace CDC Floors FA & MNS B308 SPECS-Attch. A |
| 09 65 13 RUBBER WALL BASE |
| 09 65 16 Resilient Sheet Flooring |
| 09 65 19 Resilient Tile Flooring |
09 68 13 TILE CARPETING-REVISED 01-20-22
File details come from the government source that posted it. Updated .