Attachment 7 MAHG211127 Repair Apron 3 MSS.xls
XLS spreadsheet 49 KB Posted
- Attached to
- MAHG 21-1127 Repair Apron #3
- Solicitation number
- FA301023R0032
About this file
This document is a material submittal schedule for the federal contract opportunity MAHG 21-1127 Repair Apron #3, solicited by the Department of the Air Force Air Education and Training Command. The schedule outlines 23 required submittals including hazardous material questionnaires and MSDS sheets due 5 days prior to the contract; concrete mix designs, reinforcing steel, waterstops, joint filler, sealants, and pavement marking materials due 2 weeks prior to placement; and manufacturer warranties and 1-year contractor warranties due at the end of the contract. It specifies the number of copies required and includes fields to track submission dates, review periods, approval status, and resubmittals.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG 21-1127 | Project Title: | ||
| Repair Apron #3 | Solicitation / Contract Number: |
[ Attachment 7 FA301023R0032 ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Manufacturer's Warranty | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HAZMAT Questionaire | X | X | 5 DAYS PRIOR | ||||||||||||||||||
| 2 | HAZMAT MSDS | X | 5 DAYS PRIOR | |||||||||||||||||||
| 3 | HAZMAT Reporting Entry Form | X | X | 5 DAYS PRIOR | ||||||||||||||||||
| 4 | HAZMAT Reporting Entry Form | X | X | END OF CONTRACT | ||||||||||||||||||
| 5 | Recycling and Landfill Report | X | X | END OF CONTRACT | ||||||||||||||||||
| 6 | Warranty (Manufacturer's) | X | END OF CONTRACT | |||||||||||||||||||
| 7 | 1-Year Warranty (Contractor's) | X | END OF CONTRACT | |||||||||||||||||||
| 8 | Size 610 Crushed Limestone Base | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 9 | Concrete Mix Design | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 10 | Reinforcing Steel | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||||
| 11 | Waterstops | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||||
| 12 | Joint Filler | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 13 | Joint Sealant | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 12 | Reflective media for airfields | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 13 | Waterborne Paint | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 14 | Solventborne Paint | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 15 | Thermoplastic compound | X | X | X | 2 WEEKS PRIOR TO PLACEMENT | |||||||||||||||||
| 16 | Raised Pavement Markers Primers and Adhesives | X | X | 2 WEEKS PRIOR TO PLACEMENT | ||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)