Attachment 20 - MNS_ECB.pdf

PDF 112 KB Posted

Attached to
Repair Student Dorm Smith Manor
Solicitation number
FA301023R0008
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA301023R00080002 SF 30.pdf PDF
Attachment 21 - Addendum 2_MAHG16-1017_Repair Student Dorm Smith.pdf PDF
Attachment 19 - Add. Questions and Answers_Smith.pdf PDF
Solicitation Amendment - FA301023R00080002.pdf PDF
Attachment 16 - VAV Images.pdf PDF
Attachment 17 - Addendum 1 Repair Student Dorm Smith.pdf PDF
Attachment 18 - Smith Manor B7315 VAV Box Schedule.pdf PDF
Solicitation Amendment - FA301023R00080001.pdf PDF
Solicitation Amendment FA301023R00080001 SF 30.pdf PDF
Attachment 15 - Questions and Answers_ Smith.pdf PDF
Pre-Bid Site Visit Sign-In 11 May 2023.pdf PDF
Attachment 12 - Submittal Procedures.pdf PDF
Attachment 2 - MAHG161017 Repair Student Dorm Smith Manor SPECS 05022023.pdf PDF
Attachment 13 - USAF Carpet Ordering Guide Jan2022.pdf PDF
Solicitation - FA301023R0008.pdf PDF
Attachment 10 - Past Performance Questionnaire.pdf PDF
Attachment 1 - MAHG161017 Repair Student Dorm Smith Manor B7315_SOW 04282023.pdf PDF
Attachment 4 - MAHG161017 Repair Student Dorm Smith B7315_Drawings.pdf PDF
Attachment 11 - Past Performance Reference List.pdf PDF
Attachment 6 - Palletizing of Dorm Room Furniture (Smith) 05022023.pdf PDF
Attachment 5 -MAHG161017 Repair Student Dorm Smith Manor B7315_Fire Alarm System_Drawings.pdf PDF
Attachment 3 - MAHG161017 Repair Student Dorm Smith Manor B7315 FA and MNS UFC 3-600-01.pdf PDF
Attachment 9 - Wage Det MS20230050 04072023.pdf PDF
Attachment 7 - MAHG161017 Repair Student Dorm Smith Manor B7315_ MSS.xls XLS spreadsheet
Attachment 14 - Manufacturer Carpet and Adhesive Pricing.pdf PDF
Attachment 8 - MAHG161017 Repair Student Dorm Smith Manor B7315-FA MSN_MSS.xls XLS spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING AND

CONSTRUCTION BULLETIN

No. 2018-17 Issuing Office: CECW-EC Issued: 25 Oct 18 14 May 20, Rev 1

20 Jan 22, Rev 2

Expires: 25 Oct 20 14 May 22

20 Jan 24

SUBJECT: New Requirements for Visual Notification for Mass Notification Systems

CATEGORY: Directive and Policy

1. References:

a. Unified Facilities Criteria (UFC) 4-021-01 Change 1, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, January 2010

2. Purpose. This directive provides new requirements for mass notification systems.

3. Applicability. This applies to new mass notification systems for new construction and rehabilitation projects for U.S. Army facilities. This also applies to new mass notification systems for new construction and rehabilitation projects for U.S. Air Force facilities when the U.S. Army Corps of Engineers is the design and construction agent. This ECB has been approved for U.S. Air Force facilities by the USAF AHJ office (AFCEC/CO), and applies unless otherwise directed by

AFCEC/CO.

4. Background. UFC 4-021-01, Design and O&M: Mass Notification Systems, requires Army and Air Force facilities to use amber strobes at all locations inside the facility as the visible signal to alert occupants with hearing disabilities about non-fire related emergency situations. These amber strobes are activated in conjunction with the delivery of pre-recorded or live voice messages over the mass notification system. The amber strobes are provided at the same locations as would be required for fire alarm clear strobes.

5. Directive.

a. Amber strobes must no longer be used in new mass notification systems. In lieu of amber strobes, clear or white strobes marked with the word “ALERT” must be used for new mass notification systems. Clear or white strobes must be provided for shared use by the facility’s combination mass notification and fire alarm system. The clear or white strobes are activated in conjunction with voice messages over the mass notification or fire alarm system.

b. Light-emitting diode (LED)-type text signs must be installed for the new mass notification system, and the fire alarm system (if present). These text signs are activated in conjunction with voice messages over the mass notification or fire alarm system.

c. Comply with the following changes to UFC 4-021-01:

(1) Add the text “Army and Air Force” to the beginning of the first sentence in

ECB No. 2018-17 Subject New Requirements for Visual Notification for Mass Notification Systems

Section 4-3.4.2.1.

(2) Delete the Section 4-3.4.2.2, “Army and Air Force installations shall, ...”

(3) Add the text “Army, Air Force and” to the fourth bulleted item under Section 4-4.2.

(4) Delete the sixth bulleted item under Section 4-4.2, “Army and Air Force, …”

(5) Add the text “Army, Air Force, and” to the title of Section 4-6.2.1.

(6) Delete Section 4-6.2.3, Army- and Air Force-Specific Requirements

(7) Add the text “, Army and Air Force” to the beginning of the first sentence in Section

5-4.4.2.2.

(8) Delete Section 5-4.4.2.1, “Army and Air Force installation shall, …”

(9) Add the text “Army, and Air Force” to the fourth bulleted item under Section 5-5.2.

(10) Delete the sixth bulleted item under Section 5-5.2, “Army and Air Force ...”

(11) Add the text “Army, Air Force, and” to the title of Section 5-7.2.1.

(12) Delete section 5-7.2.3, Army- and Air Force-Specific Requirements

(13) Delete the third sentence in Section 7-3.4, “The Army and Air Force use...”

(14) Add the text “Army, Air Force, and” to the fourth and sixth sentences in Section 7-3.4.

(15) Add the text “Army, Air Force, and” to the title and display callout in Figure 4-1 and delete Figure 4-2, “Individual Building Mass... (Army and Air Force)”

(16) Add the text “Army, Air Force and” to the title of Figure 5-1 and delete Figure 5-2, “Individual Building Mass... (Army and Air Force)”

(17) Add the text “Army, Air Force and” to the title of Figure 5-4 and delete Figure 5-5, “Individual Building Mass... (Army and Air Force)”

(18) Add the text “Army, Air Force and” to the title of Figure 5-6 and delete Figure 5-7, “Use of… System: Army and Air Force”

6. Update. All new requirements will be included in the next appropriate policy document update prior the expiration of this ECB.

ECB No. 2018-17 Subject New Requirements for Visual Notification for Mass Notification Systems

7. Point of Contact. The point of contact is Mr. John W. Wilkus, P.E., Chief Fire Protection Engineer, HQ USACE/CECW-EC, (816) 389-3227.

//S// LARRY D. McCALLISTER, PhD, PE, PMP, SES Chief, Engineering and Construction U.S. Army Corps of Engineers

1. References:
a. Unified Facilities Criteria (UFC) 4-021-01 Change 1, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, January 2010
2. Purpose. This directive provides new requirements for mass notification systems.
3. Applicability. This applies to new mass notification systems for new construction and rehabilitation projects for U.S. Army facilities. This also applies to new mass notification systems for new construction and rehabilitation projects for U.S. A...
4. Background. UFC 4-021-01, Design and O&M: Mass Notification Systems, requires Army and Air Force facilities to use amber strobes at all locations inside the facility as the visible signal to alert occupants with hearing disabilities about non-fir...
5. Directive.
6. Update. All new requirements will be included in the next appropriate policy document update prior the expiration of this ECB.
7. Point of Contact. The point of contact is Mr. John W. Wilkus, P.E., Chief Fire Protection Engineer, HQ USACE/CECW-EC, (816) 389-3227.
7. Point of Contact. The point of contact is Mr. John W. Wilkus, P.E., Chief Fire Protection Engineer, HQ USACE/CECW-EC, (816) 389-3227.

File details come from the government source that posted it. Updated .