Attachment 6 - Palletizing of Dorm Room Furniture (Smith) 05022023.pdf

PDF 174 KB Posted

Attached to
Repair Student Dorm Smith Manor
Solicitation number
FA301023R0008
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA301023R00080002 SF 30.pdf PDF
Attachment 21 - Addendum 2_MAHG16-1017_Repair Student Dorm Smith.pdf PDF
Attachment 20 - MNS_ECB.pdf PDF
Attachment 19 - Add. Questions and Answers_Smith.pdf PDF
Solicitation Amendment - FA301023R00080002.pdf PDF
Attachment 16 - VAV Images.pdf PDF
Attachment 17 - Addendum 1 Repair Student Dorm Smith.pdf PDF
Attachment 18 - Smith Manor B7315 VAV Box Schedule.pdf PDF
Solicitation Amendment - FA301023R00080001.pdf PDF
Solicitation Amendment FA301023R00080001 SF 30.pdf PDF
Attachment 15 - Questions and Answers_ Smith.pdf PDF
Pre-Bid Site Visit Sign-In 11 May 2023.pdf PDF
Attachment 12 - Submittal Procedures.pdf PDF
Attachment 2 - MAHG161017 Repair Student Dorm Smith Manor SPECS 05022023.pdf PDF
Attachment 13 - USAF Carpet Ordering Guide Jan2022.pdf PDF
Solicitation - FA301023R0008.pdf PDF
Attachment 10 - Past Performance Questionnaire.pdf PDF
Attachment 1 - MAHG161017 Repair Student Dorm Smith Manor B7315_SOW 04282023.pdf PDF
Attachment 4 - MAHG161017 Repair Student Dorm Smith B7315_Drawings.pdf PDF
Attachment 11 - Past Performance Reference List.pdf PDF
Attachment 5 -MAHG161017 Repair Student Dorm Smith Manor B7315_Fire Alarm System_Drawings.pdf PDF
Attachment 3 - MAHG161017 Repair Student Dorm Smith Manor B7315 FA and MNS UFC 3-600-01.pdf PDF
Attachment 9 - Wage Det MS20230050 04072023.pdf PDF
Attachment 7 - MAHG161017 Repair Student Dorm Smith Manor B7315_ MSS.xls XLS spreadsheet
Attachment 14 - Manufacturer Carpet and Adhesive Pricing.pdf PDF
Attachment 8 - MAHG161017 Repair Student Dorm Smith Manor B7315-FA MSN_MSS.xls XLS spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Palletizing of Dorm Room Furniture

Items to be palletized:

1. Desk with credenza 2 each

2. Desk chairs 2 each

3. Three drawer night stand 2 each

4. Three drawer dresser 2 each

5. Wardrobe 1 each

6. Twin head board 2 each

7. Metal bed frame 2 each

8. Bunk Bed-Twin 2 each

9. Lamp with shade 2 each

10. Fridge with microwave 1 each

11. Twin mattress 2 each

12. Twin Box spring 2 each

Palletizing of dorm furnishings:

1. Desk with Credenza: Two desks with two credenzas on one pallet, shrink wrap items then apply three inch tape on outside of shrink wrap. Wrap tape two complete times around items.

2. Desk Chairs: Eight desk chairs per pallet, shrink wrap, then wrap with 3 inch tape on outside of shrink wrap.

3. Three Drawer Night Stand: Three night stands per pallet, shrink wrap, then wrap with 3 inch tape on outside of shrink wrap.

4. Three Drawer Dresser: Three drawer dressers per pallet, shrink wrap, then wrap with 3 inch tape on outside of shrink wrap.

5. Wardrobe: Two wardrobes per pallet, shrink wrap, then wrap with 3 inch tape on outside of shrink wrap.

6. Twin Head Boards: Approximately 12 head boards per pallet shrink wrap, then secure with 3 inch tape.

7. Metal Bed Frames: Approximately 20 bed rails per pallet, secure with strapping.

8. Bunk Beds: Six bunk beds per pallet, secure with strapping. All pins must be labeled and placed in a box or container of such and placed with each pallet.

9. Lamp: Lamps will be packed in a tri-wall box and all lamp shades must be removed

10. Lamp Shades: Will be stacked in a neat fashion and placed in a box.

11. Fridge with Microwave: Each refrigerator to include freezer door must first be blocked open before palletizing. Upon completion of blocking open refrigerator door, place four refrigerators with microwaves per pallet. Shrink wrap, then wrap with 3 inch tape.

12. Twin Mattresses: Five mattresses to a pallet, then secure with straps.

13. Twin Box Springs: Eight box springs to a pallet then secure with straps.

Attachment 6

FA301023R0008

Transporting of Dorm Furnishing:

The Contractor is responsible for removing, palletizing, and providing a Government approved storage space for all removed furniture during the period of performance. Storage space will be conditioned, clean, dry, and secure. Contractor to provide the Government with the location of and accessibility to the proposed storage space during the period of performance. Contractor to clean and reinstall all furniture and furnishings at conclusion of applicable dormitory area repair.

Attachment 6

FA301023R0008

File details come from the government source that posted it. Updated .