Attachment 3 - MAHG235001 Pressed BBEC Conversion Phase 1 Drawings.pdf

PDF 12 MB Posted

Attached to
Pressed BBEC Conversion
Solicitation number
FA301023R00001
Issued by

About this file

This document outlines a federal contract opportunity for a Pressed BBEC Conversion project. The solicitation is being conducted as a Request for Proposal with an unrestricted/full and open competition. The magnitude of the contract is between $250,000 and $500,000. An organized site visit will take place on February 8, 2024 at 1:00 PM CDT to view the project site. The period of performance is 180 days. The selected contractor will perform all work specified in the statement of work, specifications, and drawings. Proposals are due in Section B and must acknowledge all amendments to the solicitation. The contracting agency is the Department of the Air Force Air Education and Training Command.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA301024R0001

Attachment 3

G. REED

MAHG2350011.10.2024

WILLIAMSON

WILLIAMSON

PRESSED BBEC

CONVERSION

PHASE 1

VARIES

MICHAEL SHEREDY

D2.0

AutoCAD SHX Text

FD

AutoCAD SHX Text

FD

AutoCAD SHX Text

BAR/ SERVING/KITCHEN

AutoCAD SHX Text

AutoCAD SHX Text SEE DRAWINGS D1.0, D2.0, AND MECHANICAL AND ELECTRICAL DRAWINGS. (NOTE: CONTRACTOR TO DISCONNECT, CAP, AND OR TERMINATE INFRASTRUCTURE TO EQUIPMENT PRIOR TO OWNER REMOVAL. OWNER WILL REMOVE, PROTECT, AND STORE EXISTING BAR/SERVING/KITCHEN EQUIPMENT FOR RELOCATION AND REINSTALLATION WHEN NEEDED BY THE CONTRACTOR).

AutoCAD SHX Text

COL.

AutoCAD SHX Text

EXIST.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

AIR EDUCATION AND TRAINING COMMAND

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

UNITED STATES AIR FORCE

AutoCAD SHX Text A

AutoCAD SHX Text

MISSISSIPPI

AutoCAD SHX Text

FACILITY NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

BILOXI

AutoCAD SHX Text

RECOMMENDED:

AutoCAD SHX Text (Chief of Engineering)

AutoCAD SHX Text

SUBMITTED:

AutoCAD SHX Text (Chief of Contracts Design)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE OF CIVIL ENGINEERS

AutoCAD SHX Text

KEESLER AIR FORCE BASE

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text

DEMOLITION KEYED NOTES

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION

AutoCAD SHX Text

BAR/SERVING/KITCHEN

AutoCAD SHX Text D2.0

AutoCAD SHX Text

AutoCAD SHX Text 3/8"=1'-0"

AutoCAD SHX Text REMOVE EXISTING DOOR. HARDWARE, TRANSITION STRIP, AND FRAME AS INDICATED ON DRAWINGS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text REMOVE EXISTING FLOORING. CLEAN AND PREPARE SURFACES FOR NEW FLOORING INSTALLATION. NOTE: REQUIRES LEVELING OF FLOOR WHERE NEEDED PER EXISTING CONDITIONS. ASSUME 10% SQUARE FOOTAGE. EXISTING DROP-IN SINK AND FAUCET TO BE DEMOLISHED AND TERMINATE PLUMBING LINES. EXISTING HOT DOG BROILER/MERCHANDISER TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. EXISTING SERVICE COUNTER AND CABINETS/SURRORTS TO BE DEMOLISHED. EXISTING BEVERAGE COOLER TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. . EXISTING CONDIMENT SERVER TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. . EXISTING ICE MACHINE TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE.. EXISTING DROP-IN ICE/WATER STATION TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. EXISTING POS STATION TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. EXISTING REFRIGERATED MERCHANDISER TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. EXISTING UNERCOUNTER REFRIGERATOR TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. EXISTING POPCORN MACHINE TO BE DISCONNECTED FROM ITS UTILITY SOURCE AND RELOCATED TO ROOM 135 FOR STORAGE. . REMOVE EXISTING WALLS TO BE DEMOLISHED COMPLETELY INCLUDING CAP AND TERMINATION OF ELECT., PLUMBING, DATA, AND MECH. AS INDICATED ON DRAWINGS. REMOVE EXISTING ROLLING COUNTER SHUTTER DOOR AND FRAME AS INDICATED ON DRAWINGS. REMOVE EXISTING PASS THRU WINDOW AND FRAME AS INDICATED ON DRAWINGS.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LEGEND - DEMOLITION

AutoCAD SHX Text

EXISTING TO REMAIN

AutoCAD SHX Text

DEMOLITION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1557824398E Text Box CONTRACTOR SHALL DISCONNECT, CAP AND/OR TERMINATE UTILITIES TO EXISTING EQUIPMENT PRIOR TO RELOVATION OF EQUIPMENT TO ROOM 135 FOR STORAGE. FOLLOWING CONSTRUCTION THE CONTRACTOR SHALL RECONNECT TO UTILITIES ALL EXISTING EQUIPMENT TO BE REUSED, AND ALL NEW EQUIPMENT. CONTRACTOR SHALL VERIFY ALL EQUIPMENT IS IN PROPER WORKING ORDER PRIOR TO CLOSEOUT.

1557824398E

1557824398E

E1.0

G. REED

G. REED

MAHG23500110.31.2023

WELANDER

LANDGRAVE

PRESSED BBEC

CONVERSION

PHASE 1

VARIES

MICHAEL SHEREDY

17 30

E2.0

G. REED

G. REED

MAHG23500110.31.2023

WELANDER

LANDGRAVE

PRESSED BBEC

CONVERSION

PHASE 1

VARIES

MICHAEL SHEREDY

E2.0

18 30

G. REED

G. REED

MAHG23500110.31.2023

WELANDER

LANDGRAVE

PRESSED BBEC

CONVERSION

PHASE 1

VARIES

MICHAEL SHEREDY

E3.0

19 30

E4.0

G. REED

G. REED

MAHG23500110.31.2023

WELANDER

LANDGRAVE

PRESSED BBEC

CONVERSION

PHASE 1

VARIES

MICHAEL SHEREDY

E4.0

20 30

MAHG23500110.31.2023

WELANDER

LANDGRAVE

PRESSED BBEC

CONVERSION

PHASE 1

VARIES

MICHAEL SHEREDY

E5.0

21 30

MAHG23500110.31.2023

WELANDER

LANDGRAVE

PRESSED BBEC

CONVERSION

PHASE 1

VARIES

MICHAEL SHEREDY

E6.0

22 30

1298460382E

FOR REFERENCE ONLY

E-001

SHEET 23 OF 30

N a v a l

F a c i l i t i e s

E n g i n e e r i n g

C o m m a n d

S o u t h e a s t

C h a r l e s t o n

S

C

RECORD DRAWINGS INCLUDE AS-BUILT

AS-BUILT DRAWING

CONDITIONS AND MAY NOT MATCH THE

ORIGINAL CONTRACT DRAWING SHEET

A S

B

U I L T

C

O N

D I T

I O

N

S

H O

W N

R W

J K

1298460382E Text Box

FOR REFERENCE ONLY

E-004

SHEET 24 OF 30

FOR REFERENCE ONLY E-005

SHEET 25 OF 30

FOR REFERENCE ONLY

E-101

SHEET 26 OF 30

FOR REFERENCE ONLY

E-104

SHEET 27 OF 30

FOR REFERENCE ONLY E-105

SHEET 28 OF 30

FOR REFERENCE ONLY

FS-111

SHEET 29 OF 30

FOR REFERENCE ONLY

FS-113

SHEET 30 OF 30

MAHG235001 Pressed BBEC Conversion Phase 1 B6732_Architectual Drawings
Pressed Floor Plan B6732 G1.0
Pressed Floor Plan B6732 D1.0
Pressed Floor Plan B6732 A1.0
Pressed Floor Plan B6732 A2.0
Pressed Floor Plan B6732 A3.0
Pressed Floor Plan B6732 A4.0
Pressed Floor Plan B6732 A5.0
MAHG235001 Pressed Cafe - MECH DWGS
M1 - KITCHEN EQPT PLAN, 26JAN24.pdf
M2 - PLUMBING DRAIN, VENT PIPING, 26JAN24.pdf
M3 - POTABLE HFW, CFW PIPING, 09JAN24.pdf
M4 - FP SPRINKLING PIPING, 09JAN24.pdf
M5 - HVAC INSTALL, 26JAN24.pdf
M6 - HVAC INSTALL, 26JAN24.pdf
M7 - HVAC INSTALL ELEVATIONS, 05JAN24.pdf
M8 - HVAC INSTALL DETAILS, 26JAN24.pdf
MAHG235001 Pressed BBEC Conversion Phase 1 B6732_Electrical Drawings
_E1.0
Sheets and Views
E1.0
_E2.0
Sheets and Views
E2.0
_E3.0
Sheets and Views
E3.0
_E4.0
Sheets and Views
E4.0
_E5.0
Sheets and Views
E5.0
_E6.0
Sheets and Views
E6.0
_REFERENCE ONLY - E-001
E-001
_REFERENCE ONLY - E-004
Sheets and Views
E004
_REFERENCE ONLY - E-005
_REFERENCE ONLY - E-101
E-101
_REFERENCE ONLY - E-104
E-104
_REFERENCE ONLY - E-105
_REFERENCE ONLY - FS-111
FS-111
_REFERENCE ONLY - FS-113
FS-113

File details come from the government source that posted it. Updated .