Attachment 10 - Questions and Answers 20220222.pdf

PDF 101 KB Posted

Attached to
Harrison Court Fam Camp Fence Repair
Solicitation number
FA301022R0007
Issued by

About this file

This document contains questions and answers regarding the federal contract opportunity for the Harrison Court Fam Camp Fence Repair project. The project involves repairing and replacing fencing around the Harrison Court Family Camp located at Keesler Air Force Base in Biloxi, Mississippi. Schedule 40 or SS40 pipe will be acceptable for fence posts and rails. Clearing will be required up to six feet on both sides of the new fence lines. The contractor is responsible for removing all tree stumps and branches and disposing them at a permitted facility. A grade beam and mow strip will be required. The fence line locations will generally follow the existing fences but may be adjusted based on site conditions such as wetlands or vegetation, which will be determined through an on-site meeting with the Contracting Officer.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions/Answers MAHG21-1133 & 21-1153 Harrison Ct FamCamp Fence

FA301022R0007

22 February 2022

1. Due to availability and cost on domestic schedule 40 pipe, will an SS40 pipe be acceptable for post and rails on the chain link fence? SS40 is domestic and has a higher tensile strength than schedule 40.

A) Yes, SS40 pipe is acceptable. SS40 is about 35% stronger and 20% lighter.

2. Please advise on the extent of the clearing required. For example, the largest diameter of trees to be taken, roots, stumps underground, etc.

A) As it is stated on the SOW, up to six feet clearing on the both sides of the new fence lines. If those required boundaries cannot be maintained due to large tree stumps, roots or any other obstacles, then the CO/PM can discuss those areas on a case by case basis and the changes will be made for those boundaries.

3. Will Keesler AFB provide stakes for the new fence locations? Some areas do not have anything to go by.

A) The contractor representative(s) and the PM/CM or CO could walk those areas and identify the fencing line locations.

4. Plans show a grade beam under the impasse fence, is this required?

A) Yes, grade beam under the impasse fence.

5. Will grounding be required on the impasse fence?

A) No. The fencing project does not appear to be near the high voltage power lines and there are no power operated gates in this fence system.

6. Will grounding be required on the chain link fence?

A) No. The fencing project does not appear to be near the high voltage power lines and there are no power operated gates in the fence system.

7. Will a city permit be required for this project?

A) No specific permit is required from the City of Biloxi, but the first step before digging will be to contact Mississippi 811. Additionally, Keesler Dig Permit is required before any digging activities on the project site.

8. Can trees be mulched/chipped in place as long as the mulch isn't over 4" in depth?

A) No, the trees and the tree branches cannot be mulched or chipped on the Keesler properties. They must be removed and disposed or mulched at a permitted facility.

9. Can stumps be cut flush with ground or do they need to be removed?

A) No, the Tree Stumps shall be removed and disposed at permitted facility.

10. On the detail plan C2.0 it shows a concrete mows strip under the Ameristar fence panel detail. Is there a Mow strip required on this project?

A) Yes, mow strip is required on this project.

Questions/Answers MAHG21-1133 & 21-1153 Harrison Ct FamCamp Fence

FA301022R0007

22 February 2022

11. On the drawing C1.0 where does it show clearing of fence line 6’ on both sides of the fence?

A) The drawing does not show the clearing areas. The clearing area statement is located on the

SOW.

12. In the area, showing on the drawing south east corner 525 feet, does the government own the property to the east to be able to clear that area.

A) On the south and south-east ends of the Harrison Court, the neighboring facilities are the

Biloxi Housing and the Harrison County Utility Authority (i.e. Keegan Bayou Wastewater Treatment Plant). The property lines ends at the exact locations of the existing fencing lines and the Keesler does not own any property behind those fencing lines.

13. North of gate shown on the east side the fence turns in - Location of the fence is to stay how far in and away from the sites and roadway?

A) This can be field verified.

14. On the rest of the line how close are we to put the fence along the roadway and what are we do about the live oak trees in the line?

A) The locations of the fencing line will follow the location of the existing fencing lines. The issues related to the Live Oaks Trees shall be discussed and resolved with the PM and the Keesler Arborist.

15. Also on the Chain link, does the top and bottom need tension wire? The drawing shows top rail spec. state tension wire.

A) Yes, install tension wire for the strength.

16. During the site walk the CO and COR stated that the fence line depicted on the drawings cannot be installed on the proposed line due to the wetlands and other heavy vegetation barriers.

a. How will the fence path be determined in these areas? The contractor representative(s) and the PM/CM or CO could walk those areas and identify the fencing locations.

b. Will the government make the determination and stake the acceptable path for the new fence? The contractor representative(s) and the PM/CM or CO could walk those areas and identify the fencing locations.