Attachment 4 - MAHG211153-211153 Repair Fence Harrison Ct. MSS.xls
XLS spreadsheet 49 KB Posted
- Attached to
- Harrison Court Fam Camp Fence Repair
- Solicitation number
- FA301022R0007
About this file
This document is a material submittal schedule for a federal contract to repair fencing at Harrison Court Family Camp. The contract is solicited by the Department of the Air Force Air Education and Training Command. By the dates listed, the contractor must submit documents including an HazMat questionnaire, MSDS, and reporting forms prior to starting work. During and after the project, the contractor must provide recycling and landfill reports, manufacturer and contractor warranties, and concrete mix designs. Submittals are also required for the chain link fencing, posts, rails, gates, and components to be used no later than 10 days after notice to proceed. The schedule provides columns to track submission dates, receipt dates, review periods, approval status, and resubmittals for each item.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG211133-211153 | Project Title: | ||
| Repair Fence Harrison Court | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | ||||||||||||||||||
| 2 | HazMat MSDS | 1 | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | |||||||||||||||||
| 3 | Hazmat Reporting Entry Form | 1 | 1 | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | ||||||||||||||||
| 4 | Recycling and Landfill Report | 1 | 1 | End of Contract | Provide the documents as required per the Environmental packet provided by Keesler AFB. | |||||||||||||||||
| 5 | Warranty (Manufacturer's) | 1 | End of Contract | |||||||||||||||||||
| 6 | 1-Year Warranty (Contractor) | 1 | End of Contract | |||||||||||||||||||
| 7 | Concrete | 10 Days Following NTP | Submit Mix Design | |||||||||||||||||||
| 8 | Chain-Link Fence Post and Rails | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||
| 9 | Chain-Link Components & Hardware | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||
| 10 | Chain Link Gates | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||
| 11 | Fence Post and Rails | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||
| 12 | Components & Hardware | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||
| 13 | Gates | 1 | 1 | 1 | 10 Days Following NTP | |||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .