This document contains two specifications for repairing fencing at Harrison Court Family Camp. The first specification covers chain link fencing and requires galvanized steel coated chain link fabric, galvanized steel framework and fittings, swing gates, tension wire, and installation. Materials must meet ASTM standards and the contractor must have five years of relevant experience. The second specification is for an Ameristar Impasse II high security steel fence system and includes ornamental steel pales, rails, posts, gates, and hardware. Structural components are warranted for 15 years against defects. The work must be completed by 15 February 2022 to repair storm damage from Hurricane Ida at the Harrison Court Fam Camp located at Keesler Air Force Base for the Department of the Air Force Air Education and Training Command.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #2 - MAHG21-1133 Repair South and East Fencing Harrison Court
SPECIFICATION FOR CHAIN LINK FENCE AND GATES
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. General and supplemental provisions of the Contract apply to this work.
1.2 SUMMARY
A. Provide a fence enclosing the entirety of the property along the property line, complying with the requirements of this specification.
B. This Specification includes the following:
1. Galvanized steel coated chain link fabric
2. Galvanized steel framework and fittings
3. Swing gates
4. Barbed wire
5. Installation
1.3 REFERENCES
A. ASTM A392 Specification for Zinc-Coated Steel Chain-Link Fence Fabric
B. ASTM A780 Standard Practice for Repair of Damaged and Uncoated Areas of Hot-
Dip Galvanized Coatings
C. ASTM A824 Specification for Metallic-Coated Steel Marcelled Tension Wire for
Use With Chain Link
D. ASTM F567 Standard Practice for Installation of Chain Link Fence
E. ASTM F626 Specification for Fence Fittings
F. ASTM F900 Specification for Industrial and Commercial Swing Gates
G. ASTM F1083 Specification for Pipe, Steel, Hot-Dipped Zinc-Coated (Galvanized)
Welded, for Fence Structures.
27 December 2021
1.4 DEFINITIONS
A. See ASTM F552, “Standard Terminology Relating to Chain Link Fencing” for a complete list.
B. CLFMI: Chain Link Fence Manufacturers Institute.
C. Chain link fabric – A fencing material consisting of wire helically wound and interwoven in such a manner as to provide a continuous mesh without knots or ties except in the form of knuckling or twisting at the top and bottom of the mesh to form the fabric selvage.
D. Selvage – The top and bottom edge finish on woven chain link formed by joining adjacent pairs of wire pickets. The selvage may be knuckled or twisted.
1. Knuckled selvage refers to bending the adjacent pairs of wire back into a tight loop.
2. Twisted selvage refers to twisting the adjacent pairs of wire together in a close helix of 1 ½ machine turns, which is equivalent to three full twists.
E. Mesh size – The minimum clear distance between the wires forming the parallel sides of the mesh.
F. Terminal post – A post to which the chain link fabric is terminated using specific fittings; this includes end posst, corner posst, gate posts and pull posts. A terminal post used to accommodate a grade or placed at intervals on long stretches of fence.
G. Line post – Intermediate posts spaced between the terminal posts.
H. See Typical Fence Section drawing for details of various fence fittings; tension bar, truss rod, tension band, brace band, rail end and barb arm.
1.5 SUBMITTALS
A. Shop drawings: Provide a site plan showing layout of fence location, with dimensions, location of gates and opening sizes, cleared area, elevation of fence, gates, footings, and details of attachments
B. Product Data: Provide manufacturer’s material descriptions, construction details, dimensions of individual components and profiles, and finishes for the following:
1. Fence and gate posts, rails, and fittings.
2. Chain-link fabric, reinforcements, and attachments.
3. Gates and hardware.
C. Certifications: Provide signed manufacturer’s material certification that products are in compliance with the current ASTM standards. See Section 1.3 for referenced standards.
1.6 QUALITY ASSURANCE
A. Fence Contractor: Company with demonstrated successful experience installing similar projects and products in accordance with ASTM F567 and have at least 5 years demonstrated experience.
B. Source Limitations for Chain-Link Fences and Gates: Obtain each color, grade, finish, type, and variety of component for chain-link fences and gates from one source with resources to provide chain-link fences and gates of consistent quality in appearance and physical properties.
PART 2 – PRODUCTS
2.1 CHAIN LINK FABRIC
A. Steel Chain Link Fence Fabric shall be not less than 2.75 meters high.
B. Mesh and Wire Size: 50mm (2”) mesh, 3.76 mm diameter (9 gauge) wire.
C. Zinc-Coated Fabric: Fabric shall comply with ASTM A392, with zinc coating applied to steel wire before weaving according to ASTM A817. Fabric shall be
Type II, zinc coated (hot dip galvanized) with a minimum zinc coating of 1.20 oz/ft²
(366 g/m²).
D. Fabric selvage: Provide selvages twisted at top of fence and knuckled at bottom of fence.
2.2 FENCE FRAMEWORK
A. Framework shall be standard weight, Schedule 40, hot dip galvanized round steel pipe complying with ASTM F 1083. Comply with ASTM F 1043, Material Design
Group IA, external and internal coating Type A, consisting of not less than 1.8-oz./sq. ft. (0.55-kg/sq. m) zinc; and the following requirements:
1. Corner, End and Pull Posts shall be equivalent to a minimum of 73 mm (2-7/8 inch) O.D galvanized Schedule 40. Pull posts shall be used at all abrupt changes in grade and at intervals no greater than 152 meters (500 feet). On runs over 152 meters (500 feet), pull posts shall be evenly spaced between corner and end posts.
2. Line Posts shall be a minimum of 60.3 mm (2-3/8 inches) O.D galvanized
Schedule 40 steel pipe. Posts shall be spaced equidistant in the fence line with a maximum spacing of 3 meters (10 feet) on center.
3. Post Brace Rails shall be equivalent to a minimum of 42.2 mm (1-5/8 inches)
O.D galvanized Schedule 40 steel pipe. Provide brace rail with truss rod assembly for each gate, end, and pull post.
2.3 TENSION WIRE
A. Provide Metallic Coated Steel Marcelled Tension Wire, 7 gauge (4.50 mm) (0.177 in.) complying with ASTM A824. Galvanizing shall be Type II with a minimum zinc coating of 1.20 oz/ft² (366 g/m²).
2.4 BARBED WIRE- Not Required for this project
2.5 FITTINGS
A. Provide post caps for all posts. Terminal Post Caps, Line Post Loop Tops, Rail and
Brace Ends, Boulevard Clamps, and Rail Sleeves shall be in compliance to ASTM
F626, pressed steel hot dip galvanized after fabrication having a minimum zinc coating of 1.20 oz/ft² (366 g/m²).
B. Tension and Brace Bands: Hot dip galvanized pressed steel complying with ASTM
F626, minimum steel thickness of 12 gauge (2.67 mm) (0.105 in.), minimum width of 19 mm (3/4 in.) and minimum zinc coating of 1.20 oz/ft² (366 g/m²). Secure bands with 7.94 mm (5/16 in.) galvanized steel carriage bolts.
C. Truss Rod Assembly: In compliance with ASTM F626, 9.53 mm (3/8 in.) diameter steel truss rod with a pressed steel tightener, hot dip galvanized with minimum zinc coating of 1.2 oz/ft² (366 g/m²). Assembly shall be capable of withstanding a tension of 2,000 lbs. (970 kg).
D. Tension Bars shall be in compliance with ASTM F626. Provide hot dip galvanized steel one-piece bars, with a length 50 mm (2 in.) less than the fabric height.
Minimum zinc coating shall be 1.2 oz. /ft² (366 g/m²). Bars for 2 in. (50 mm) mesh shall have a minimum cross section of 4.8 mm (3/16 in.) by 19 mm (3/4 in.).
E. Tie Wire and Hog Rings: Provide hot dip galvanized steel wire, minimum zinc coating 1.20 oz/ft² (366 g/m²), 9 gauge (3.76 mm) (0.148 in.) in compliance with
ASTM F626.
2.6 SWING GATES
A. Provide one (1) 4.35 meter (12 foot) opening with a double swing gate on the major access way to the site.
1. Match gate fabric to that of the fence system.
2. Gateposts shall be a minimum of 73mm (2-7/8 inch) O.D hot dip galvanized
Schedule 40 steel pipe, complying with ASTM F1083.
3. Double swing gate shall be hot dip galvanized steel pipe, welded fabrication, in compliance with ASTM F900. Gate frame members shall be a minimum of 48.3 mm (1.90 in.) O.D. schedule 40 galvanized steel pipe, in compliance with
ASTM F 1083.
4. Frame members shall be spaced no greater than 2.44 meters (8 ft.) apart vertically and horizontally.
5. Protect welded joints by applying zinc-rich paint in accordance with ASTM
Practice A780.
6. Barbed wire mounting shall transition to vertical at the center of the gates to allow inward swing.
7. Hardware: Provide hinges, latches permitting operation from both sides of gate, and keepers for each gate leaf. Fabricate latches with integral eye openings for padlocking; padlock shall be accessible from both sides of gate.
2.7 CONCRETE
A. Concrete for post footings shall be normal-weight concrete with not less than 20.7
MPa (3000 psi) compressive strength at 28 days, 75 mm (3-inch) slump, and 25 mm
(1-inch) maximum size aggregate.
PART 3 – EXECUTION
3.1 PREPARATION
A. Verify the layout information for chain-link fences and gates shown on Shop Drawings in relation to property survey and existing structures. Verify dimensions by field measurements.
B. Stake locations of fence lines, gates, and terminal posts. Do not exceed intervals of 150 meters (500 feet) or line of sight between stakes. Indicate locations of any known underground structures, benchmarks, and property monuments.
C. Clear, grub, and grade fence line, removing debris and providing a 6 feet clear area on either side of the fence.
3.2 FRAMEWORK INSTALLATION
A. Posts: All Posts shall be set plumb in concrete footings in accordance with ASTM
F567. Minimum footing depth shall be per manufacturer’s recommendations, but no less than 1 meter. Minimum footing diameter shall be per manufacturer’s recommendations, but no less than 300 mm (12 in.). For swing gate posts, the foundation diameter shall be not less than 450 mm (18 in.). Top of concrete footing shall be at grade, crowned to shed water away from the post.
B. Fabric shall not be attached to posts until the concrete footings have cured for at least five days.
C. Tension wire: Shall be installed 100 mm (4 in.) up from the bottom of the fabric and
100 mm (4 in.) down from the top of the fabric. Tension wire shall be stretched taut, independently and prior to the fabric, between the terminal posts and secured to the terminal post using a brace band. Secure the tension wire to each line post with a tie wire.
D. Post Bracing Assemblies: Install according to ASTM F 567, maintaining plumb position and alignment of fencing. Install braces at end and gate posts and at both sides of corner and pull posts. Locate horizontal braces at two-thirds fabric height on fences without top rail. Install so posts are plumb when diagonal rod is under proper tension.
3.3 CHAIN LINK FABRIC INSTALLATION
A. Chain Link Fabric: Install fabric to outside of the framework. Attach fabric to the terminal post by threading the tension bar through the fabric; secure the tension bar to the terminal post with tension bands and 7.94 mm (5/16 in.) carriage bolts spaced no greater than 305 mm (12 in.) O.C. Chain link fabric shall be free of sag, and secured to the line post with tie wires spaced no greater than 300 mm (12 in.) O.C.
Secure fabric to the tension wire with hog rings spaced no greater than 450 mm (18 in.) O.C.
B. Fabric shall be pulled tight so that the maximum deflection of the fabric is 50 mm
(2 in) when a 22.5 kilograms (50 pounds) pull is exerted perpendicular to the center of the panel.
C. Tie wire shall be wrapped 360 degrees around the post or rail and the two ends twisted together three full turns. Excess wire shall be cut off and bent over to prevent injury.
D. The bottom of the fence fabric shall meet the finished grade such that it prevents surreptitious human entry.
3.4 BARBED WIRE INSTALLATION - Not Required for this project
3.5 GATE INSTALLATION
A. Swing Gates: Installation of swing gates shall be in compliance with ASTM F 567.
Direction of swing shall be inward. Gates shall be plumb in the closed position having a bottom clearance of 75 mm (3 in.) above grade. The ground under the swing arc shall be graded to allow for operation.
3.6 NUTS AND BOLTS
A. Bolts: Carriage bolts used for fittings shall be installed with the head on the secure side of the fence. All bolts shall be peened over to prevent removal of the nut.
3.7 ELECTRICAL GROUNDING
A. Grounding: The fence shall be grounded every 100 meters (110 yards) by a 1.8 meter (6 foot) ground rod connected to the fence fabric with grounding clamps and number 10 gauge wire.
3.8 CLEAN UP
A. Clean Up: The area of the fence line shall be left neat and free of any debris caused by the installation of the fence.
END OF SPECIFICATION
Impasse II Specification Ameristar Perimeter Security USA Inc. Rev. 07/01/2016
Attachment #2 ---MAHG21-1153 Storm Ida: Repair North and West Fencing Harrison Court
AMERISTAR® PERIMETER SECURITY USA INC.
IMPASSE II®- High Security Steel Fence System – Ornamental Pale
Construction Specification - SECTION 32 31 19
PART 1 - GENERAL
1.01 WORK INCLUDED
The contractor shall provide all labor, materials and appurtenances necessary for installation of the steel corrugated pale security fence system defined herein at Keesler Air Force Base.
1.03 SYSTEM DESCRIPTION
The manufacturer shall supply a total steel ornamental pale high security fence system of the Ameristar® Impasse II® model, Gauntlet design. The system shall include all components (i.e., pales, rails, posts, gates and hardware) required.
1.04 QUALITY ASSURANCE
The contractor shall provide laborers and supervisors who are thoroughly familiar with the type of construction involved and materials and techniques specified.
1.05 REFERENCES
ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy Coated (Galvannealed) by the Hot-Dip Process.
ASTM B117 - Practice for Operating Salt-Spray (Fog) Apparatus.
ASTM D523 - Test Method for Specular Gloss.
ASTM D714 - Test Method for Evaluating Degree of Blistering in Paint.
ASTM D1654 - Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments.
ASTM D2244 - Test Method for Calculation of Color Differences from Instrumentally Measured Color Coordinates.
ASTM D2794 - Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact).
ASTM D3359 - Test Method for Measuring Adhesion by Tape Test.
ASTM F2408 – Ornamental Fences Employing Galvanized Steel Tubular Pickets.
1.06 SUBMITTAL
The manufacturer's submittal package shall be provided prior to installation.
1.07 PRODUCT HANDLING AND STORAGE
Upon receipt at the job site, all materials shall be checked to ensure that no damage occurred during shipping or handling. Materials shall be stored in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism and theft.
1.08 PRODUCT WARRANTY
A. All structural fence components (i.e. rails, pales, and posts) shall be warranted within specified limitations, by the manufacturer for a period of 15 years from date of original purchase. Warranty shall cover any defects in material finish, including cracking, peeling, chipping, blistering or corroding.
PART 2 - MATERIALS
2.01 MANUFACTURER
A. The steel ornamental pale high security fence system shall conform to Ameristar Impasse II model, Gauntlet 3-Rail style manufactured by Ameristar Perimeter Security Inc., in Tulsa, Oklahoma.
1557824398E Text Box
(OR APPROVED EQUAL)
Attachment #2
2.02 MATERIAL
A. Steel material for fence framework (i.e., corrugated pales, rails and posts), when galvanized prior to forming, shall conform to the requirements of ASTM A924/A924M, with a minimum yield strength of 45,000 psi (310 MPa). The steel shall be hot-dip galvanized to meet the requirements of ASTM A653/A653M with a minimum zinc coating weight of 0.90 oz/ft2 (276 g/m2), Coating Designation G-90.
B. Material for corrugated pales shall be a nominal 2.75” x .75” x 14 Ga. The cross-sectional shape of the rails shall conform to the manufacturer's Impasse II® rail design a nominal 2” x 2” x 11 Ga. Pre-drilled holes in the Impasse II® rail shall be spaced 6” on center, providing a pale airspace of no greater than 3.25” or Pre-drilled holes in the Impasse II Anti-Scale rail shall be spaced 4.1875” on center, providing a pale airspace of no greater than 1.5” (38mm). Tamperproof fasteners shall be used to fasten each pale to rail at every intersection. Fence posts and gate posts shall meet the minimum size requirements of Table 1.
C. If applicable - Material for steel Impasse II privacy screening shall be 18 gauge pre-formed slats, providing complete screening coverage between pales and at pale to post connections. Impasse II privacy screening shall provide screening from top rail to bottom rail, and be capable of traversing terrain without impeding the raking capabilities of the fencing panel. Privacy screening not available for Impasse II Anti-Scale model.
2.03 FABRICATION
A. Pales, rails and posts shall be pre-cut to specified lengths. Impasse II rails shall be pre-punched to accept tamperproof security fasteners. Post flange shall be pre-punched to accept rail to post attachment. Post web shall be punched providing a clear opening for interior of rails to align throughout the entire system for affixing conduit, video cabling, IDS wiring, and other components for a complete systems integration. Impasse II rails shall be attached to post flange providing a bracket-less design at each intermediate post.
B. The manufactured galvanized framework shall be subjected to the PermaCoat® thermal stratification coating process (high-temperature, in-line, multi-stage, multi-layer) including, as a minimum, a six-stage pretreatment/wash, an electrostatic spray application of an epoxy base, and a separate electrostatic spray application of a polyester finish. The base coat shall be a thermosetting epoxy powder coating (gray in color) with a minimum thickness of 2 mils (0.0508mm). The topcoat shall be a “no-mar” TGIC polyester powder coat finish with a minimum thickness of 2 mils (0.0508mm). The color shall be (specify Black, Bronze, White, or Desert Sand). The stratification-coated framework shall be capable of meeting the performance requirements for each quality characteristic shown in Table 2.
C. Completed panels shall be capable of supporting a 400 lb. load (applied at midspan) without permanent deformation. Panels shall be biasable to a 30˚ change in grade.
D. Impasse II fence system shall be designed to minimize the system impedance to comply with IEEE grounding requirements. No additional grounding material, beyond the structure grounding lug installation, will be required to create a safe low resistance fence system. By way of fence construction, the entire fence system is inherently grounded without the need for any additional work.
Grounding location at the post is for taking the fence system to site ground.
E. Swing gates shall be fabricated using 2” sq. x 12ga rail, 2” sq. x 12ga. gate ends, and 2.75” x .75” x 0.075 pales. Gates that exceed 6’ in width will have a 2” sq. x 11ga. intermediate upright. All rail and upright intersections shall be joined by welding. All pale and rail intersections shall also be joined by welding.
F. Sliding cantilever gates shall be TransPort IS design matching style, height, and color of fence system. The dual enclosed track slide gate shall be an aluminum component design using tracks, uprights, pales, hardware, fittings, and fasteners. Gate installation shall comply with latest ASTM F2200 standards for automated gates, regardless if the gate is of manual operation.
PART 3 - EXECUTION
3.01 PREPARATION
All new installation shall be laid out by the contractor in accordance with the construction plans.
3.02 FENCE INSTALLATION
Fence post shall be spaced according to Table 3, plus or minus ¼”. For installations that must be raked to follow sloping grades, the post spacing dimension must be measured along the grade. Fence panels shall be attached to the line and end posts with fasteners supplied by the manufacturer. Attachment to corner post shall be made using brackets and fasteners supplied by the manufacturer (See Figure 1). Posts shall be set in concrete footers having a minimum depth of 36” (Note: In some cases, local restrictions of freezing weather conditions may require a greater depth). The “Earthwork” and “Concrete” sections of this specification shall govern material requirements for the concrete footer. Posts setting by other methods such as plated posts or grouted core-drilled footers are permissible only if shown by engineering analysis to be sufficient in strength for the intended application.
3.03 FENCE INSTALLATION MAINTENANCE
When cutting/drilling rails or posts adhere to the following steps to seal the exposed steel surfaces; 1) Remove all metal shavings from cut area. 2) Apply zinc-rich primer to thoroughly cover cut edge and/or drilled hole; let dry. 3) Apply two (2) coats of custom finish paint matching fence color. Failure to seal exposed surfaces per steps 1-3 above will negate warranty. Ameristar spray cans or paint pens shall be used to prime and finish exposed surfaces; it is recommended that paint pens be used to prevent overspray. Use of non-Ameristar parts or components will negate the manufactures’ warranty.
3.04 GATE INSTALLATION
Gate posts shall be spaced according to the manufacturers’ gate drawings, dependent on standard out-to-out gate leaf dimensions and gate hardware selected. Type and quantity of gate hinges shall be based on the application; weight, height, and number of gate cycles.
The manufacturers’ gate drawings shall identify the necessary gate hardware required for the application. Gate hardware shall be provided by the manufacture of the gate and shall be installed per manufacturer’s recommendations.
3.05 CLEANING
The contractor shall clean the jobsite of excess materials; post-hole excavations shall be scattered uniformly away from posts.
Table 1 – Minimum Sizes for Impasse II® Posts
Fence Posts (Nominal) Panel Height
3” x 2.75” x 12 Ga. I-Beam Up to & Including 8’ Height 4” x 2.75” x 11 Ga. I-Beam Over 8’ Height up to & including 10’ Height
Gate Leaf Gate Height
Up to & Including 6’ Over 6’ Up to & Including 8’
Over 8’ Up to & Including 10’
Over 12’
Up to 4’ 3” x 12Ga. 3” x 12 Ga. 4” x 11 Ga. 4” x 11 Ga.
4’1” to 6’ 3” x 12Ga. 3” x 12 Ga. 4” x 11 Ga. 4” x 11 Ga.
6’1” to 8’ 4” x 11 Ga. 6” x 3/16” 6” x 3/16” 6” x 3/16”
8’1” to 10’ 4” x 11 Ga. 6” x 3/16” 6” x 3/16” 6” x 3/16”
10’1” to 12’ 6” x 3/16” 6” x 3/16” 6” x 3/16” 8” x 1/4"
12’1” to 16’ 6” x 3/16” 6” x 3/16” 8” x 1/4” 8” x 1/4"
Table 2 – Coating Performance Requirements
Quality Characteristics ASTM Test Method Performance Requirements
Adhesion D3359 – Method B Adhesion (Retention of Coating) over 90% of test area (Tape and knife test).
Corrosion Resistance B117, D714 & D1654 Corrosion Resistance over 3,500 hours (Scribed per D1654;
failure mode is accumulation of 1/8” coating loss from scribe or medium #8 blisters).
Impact Resistance D2794 Impact Resistance over 60 inch lb. (Forward impact using 0.625” ball).
Weathering Resistance D2244, D523 (60 ̊Method) Weathering Resistance over 1,000 hours (Failure mode is 60% loss of gloss or color variance of more than 3 delta-E color units).
Table 3 – Impasse II® Post Spacing
Span 8’ Nominal (95” Rail)
Line & End Posts
Post Size 3” x 2.75” x 12 Ga. I-Beam 4” x 2.75” x 11 Ga. I-Beam
Post Settings ± ¼” O.C. 96” 96”
*For Corner Posts see Figure 1
Figure 1
SECTION 01 30 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.0 SUMMARY (Not Applicable)
1.1 REFERENCES (Not Applicable)
1.2 SUBMITTAL CLASSIFICATION
1.2.1 Submittals are classified as follows:
1.2.1.1 Contracting Officer Approval: The Contracting Officer (CO) approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the CO. Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction", they are considered to be "shop drawings."
1.2.1.2 Information Only: All submittals not requiring the Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.3 APPROVED SUBMITTALS:
The approval of submittals by the CO shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory.
Approval will not relieve the Contractor of the responsibility for any error, which may exist, as the Contractor is responsible for the dimensions and design of adequate connections, details and satisfactory construction of all work. After submittals have been approved by the CO, no resubmittal for the purpose of substituting materials or equipment will be given consideration unless accompanied by an explanation as to why a substitution is necessary.
1.4 DISAPPROVED SUBMITTALS:
The Contractor shall make all corrections required by the CO and promptly furnish a corrected submittal in the form and number of copies as specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, notice as required under the Contract Clause entitled "Changes" shall be given promptly to the CO.
PART 2 EXECUTION
2.0 GENERAL:
The Contractor shall submit all items listed on the Submittal Register (Material Submittal Schedule (MSS), or equivalent) or specified in the other sections of these specifications. The CO may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same used in the contract drawings. Submittals shall be made in three (3) copies unless otherwise noted on the Submittal Register to the CO. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Prior to submittal, all items shall be checked and approved and each respective transmittal form or material approval submittal (AF 3000, Material Approval Submittal) shall be stamped, signed and dated by the Contractor certifying that the accompanying submittal complies with the contract requirements. Submittals shall include line number of item from Government-prepared Submittal Register. Proposed deviations from the contract requirements shall be clearly identified. Submittals shall include items such as: Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals including parts list;
certifications; warranties and other such required submittals. Submittals requiring CO approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby.
2.1 SUBMITTAL REGISTER: Material Submittal Schedule (MSS):
A Submittal Register on the MSS shall be provided to the Contractor as an attachment to the awarded contract. During the pre-construction meeting, the Contractor shall meet with the CO to jointly review the CO prepared Submittal Register. The Contractor shall be responsible for providing all items listed on the Submittal Register in accordance with the scheduled submittal dates.
2.2 SCHEDULING:
Submittals covering component items forming a system or items that are interrelated, shall be scheduled to be coordinated and submitted concurrently. Certifications to be submitted with the pertinent drawings shall be so scheduled. The Contractor shall take special care to timely schedule the submittal date required for long lead-time items and shall allow 30 days for CO review action on all submittals except as noted below. No delays, damages, or time extensions will be allowed for time lost in late submittals.
All submittals will be made on AF 3000, Material Approval Submittal as specified below.
2.2.1 The number of days for CO action on the following submittals will be as indicated:
2.2.1.1 Submittals required on the MSS – 10 calendar days.
2.2.1.2 Any submittal that requests or requires deviation from contract drawings or specifications – 14 calendar days.
2.3 TRANSMITTAL FORM (AF 3000, Material Approval Submittal):
AF 3000, Material Approval Submittal shall be used for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms will be furnished to the Contractor by the CO. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted.
Special care will be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.
2.4 CONTROL OF SUBMITTALS:
The Contractor shall carefully control his procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the provided Submittal Register.
2.5 CO APPROVED SUBMITTALS:
Upon completion of review of submittals requiring CO approval, the submittals will be identified as having received approval by being so noted on AF 3000, Material Approval Submittal. Such submittals shall be made in accordance with the Construction Contract Clause entitled "Specifications and Drawings for Construction" and the following: unless otherwise noted on the Submittal Register and when submitting physical documents, three (3) prints of all drawings; or, if catalog cuts, printed specifications or similar publications are used as submittals, three (3) original copies shall be submitted. One corrected copy shall be returned to the Contractor. When submitting documents for review and approval via email, only one copy is required. In cases where "trade names or equal" specifications are used, any equal substitution by the Contractor will be considered a deviation and will require approval. Any submittal requesting a deviation shall be considered as one requiring "approval" action. Payment for materials incorporated into the work will not be allowed if required approvals have not been obtained. Upon completion of review of submittals requiring CO approval, the submittals will be identified as having received approval by being so noted on AF 3000, Material Approval Submittal.
2.6 INFORMATION ONLY SUBMITTALS:
All other submittals are considered to be "Information Only" submittals and may be subject to review action by the CO or may be simply receipt acknowledged. Any submittal “For Information Only” shall be clearly marked “FIO”. Normally, submittals for information only will not be returned. Approval of the Construction Manager (CM) is not required on information only submittals. These submittals will be used for information purposes. The CO reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications and will not prevent the CO from requiring removal and replacement if nonconforming material is incorporated in the work. This also does not relieve the Contractor of the requirement to furnish samples for testing by the CO laboratory or check testing by the CO, in those instances where the technical specifications so prescribe. It shall be the Contractor's responsibility of assuring that the materials and/or equipment covered by that submittal meets the contract requirements. Any such "For Information Only" submittal found to contain errors or omissions shall be resubmitted as one requiring "approval" action. All "For Information Only" submittals shall be made in triplicate unless otherwise specified.
END OF SECTION