Attachment_1_-_Repair_Sanitary_Sewer_DWG_Part_4.pdf

PDF 4 MB Posted

Attached to
Repair Sewage Distribution System Phase 1
Solicitation number
FA301019RA025-RepairSewageDistributionSystemPhase1
Issued by

About this file

This solicitation package describes a federal contract opportunity for repair and replacement of major sanitary sewer lines at Keesler Air Force Base. The work includes furnishing all labor, equipment, materials and operations to complete repairs and replacements as specified in the statement of work, specifications and drawings.

The opportunity is set aside for Historically Underutilized Business Zones as a HUBZone small business and utilizes Performance Price Trade-Off procedures. The NAICS code is 237110 for utility system construction and the size standard is $39.5 million. The proposed construction value is between $1 million and $5 million. The solicitation will be posted on October 15, 2019 on FedBizOpps with a closing date of November 14, 2019. The contract performance period is 360 days from notice to proceed. Offerors must register in the System for Award Management to be eligible for award. The contracting office contact information and requirement for checking FedBizOpps for amendments are also provided.

Attachment 1 - Repair Sanitary Sewer DWG Part 4.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONC

BLDG

A/C PAD A/C PAD

ELECTRIC

PADS

ELECTRIC

PAD

"G" STREET

"H" STREET

GAZEBO

HIGH

VOLTAGE

D

S

S

SS

S

S S

S

S S

S

S S S

SS

S

SS

S

S S S

S S

SS

S S S S

S

S

S S S

S

S S S S

S

S

S S

S

S

S

SS

S

S S

S

S

S

S

S S

S

S

S

S

S

S

S

S

SS S

S

S

S

S S S

S

S

S

S

S S D

S S

S

FISHER HOUSE

BIO-ENVIRONMENTAL

420 412

TYER HOUSE

KEESLER AIRE FORCE BASE

MEDICAL CENTER

CHILD DEVELOPMENT CENTER

99904

DAPS

904 DENTAL CLINIC

WALL STUDIO

417 416

RESEARCH LAB

DENTAL CLINIC

413 404

CLINICAL RESEARCH LAB

WEATHER TRNG FAC

S

S

S

S S

SSS

S

S

S

S

S S

S S

S S

S

SSS

S

"H" STREET

"H" STREET"H" STREET (WEST)

"G" STREET "G" STREET

S S

S

SMH 3 SMH 4 SMH 6 SMH 7

SMH 8 SMH 9

SMH 10

SMH 12

SMH 11

SMH 13

SMH 14

SMH 15

SMH 16 SMH 16A

SMH 17

SMH 18

SMH 19

SMH 20 SMH 21

SMH 5

SMH 1

SMH 2

SMH 59

SMH 62

SMH 60

SMH 68

SMH 69

SMH 70 SMH 71 SMH 72

SMH 73

SMH 75 SMH 76

S

SMH 50

SMH 52

SMH 53

SMH 54

SMH 55

SMH 56

SMH 49 SMH 48 SMH 47

SMH 45

SMH 46

SMH 44

SMH 42

SMH 43

SMH 26

SMH 24

SMH 22

SMH 23

SMH 25

SMH 84

SMH 83

SMH 82

SMH 81

SMH 79SMH 78SMH 77

SMH 139

SMH 138

SMH 137

SMH 136

SMH 135

SMH 132 SMH 131

SMH 140

SMH 141

SMH 146

SMH 147

SMH 128

SMH 123

SMH 124

SMH 103

SMH 122

SMH 121

SMH 120

SMH 111

SMH 148

SMH 126

SMH 125

SMH 149

SMH 150

SMH 151 SMH 152 SMH 153 SMH 154 SMH 156 SMH 157

SMH 110

SMH 109

SMH 108

SMH 107

SMH 106

SMH 105

SMH 115

SMH 116

SMH 113

SMH 104

SMH 117

SMH 102

SMH 119

SMH 118

SMH 98

SMH 99 SMH 100

SMH 97

SMH 96

SMH 95

SMH 91

SMH 90

SMH 89

SMH 28 SMH 29 SMH 30 SMH 34

SMH 35 SMH 37

SMH 38

SMH 39

SMH 40

SMH 41

SMH 36

SMH 31

SMH 32 SMH 33

NOTE:

BEFORE UNDERTAKING ANY PORTION OF WORK INVOLVING LAYING NEW SEWER LINES, THE CONTRACTOR

SHALL HAVE ALL UNDERGROUND UTILITIES CLEARLY MARKED AT ALL JACK AND BORE LOCATIONS AND SHALL

HAVE DETERMINED THE EXACT ELEVATIONS OF ANY AND ALL EXISTING LINES, BOXES, CABLES, ETC; THAT MAY

BE IN THE DIRECT PATH OF THE PROPOSED JACK AND BORE. SHOULD IT BE DETERMINED FROM THE FIELD

INVESTIGATION THAT THERE IS A CONFLICT WITH EXISTING UTIITIES WITH THE PROPOSED JACK AND BORE AT

ANY LOCATION, THE CONTRACTOR SHALL PROMPTLY REPORT IN WRITING TO CSC, OR HIS AUTHORIZED

REPRESENTATIVE THE AFOREMENTIONED CONFLICT. THE CONTRACTOR SHALL OBTAIN A WRITTEN

INTERPRETATION OR CLARIFICATION FROM CSC OR HIS AUTHORIZED REPRESENTATIVE BEFORE PROCEEDING

WITH ANY WORK AFFECTED BY SAID CONFLICT.

NNN

DRAWN

CHECKED

DATE

SCALE

JOB NO.

REVISIONS BY

TLT

LCR

07-06-10

P-10.03

1" = 200’

SHEET OV_02

SPECIAL NOTES TO CONTRACTOR:

WATER/SEWER LINE CONFLICTS

1. IN ALL CASES WHERE THE NEW SEWER LINE BEING CONSTRUCTED HAS LESS THAN A TEN (10’) FOOT

HORIZONTAL SEPARATION FROM THE EXISTING POTABLE WATER LINE, THE CONTRACTOR SHALL

SUBSTITUTE THE SDR 26 PVC MATERIAL FOR THE SEWER LINE WITH SDR 18 C-900 PVC, OR SDR 21

C-900 PVC AS SPECIFIED. THE CONTRACTOR SHALL USE THE APPROPRIATE TRANSITION GASKETS AND

FITTINGS WITH MEGALUGS TO TRANSITION FROM SDR 26 PVC PIPE TO SDR 18 C-900 PVC PIPE. IN

ALL CASES, THE CONTRACTOR SHALL ADHERE TO THE MOST CURRENT MISSISSIPPI STATE HEALTH

DEPARTMENT REGULATIONS WITH REGARD TO WATER AND SEWER LINE SEPARATION, BOTH HORIZONTALLY

AND VERTICALLY.

THESE PLANS HAVE ATTEMPTED TO IDENTIFY AND QUANTIFY ALL OF THESE SEGMENTS OF SEWER LINE

THAT WILL BE REQUIRED TO MEET THESE STANDARDS. THIS INFORMATION WAS DETERMINED FROM BEST

AVAILABLE INFORMATION FROM FIELD SURVEYS AND RECORD DRAWINGS AS SUPPLIED BY CSC.

JACK AND BORE

2. CONTRACTOR SHALL UTILIZE A GROUND RADAR SYSTEM SIMILAR TO THE "UTILITY SCAN" SYSTEM BY

GEOPHYSICAL SURVEY SYTEMS, INC., TO DETERMINE THE SIZE, ELEVATION AND LOCATION OF EXISTING

UNDERGROUND UTILITIES AT ALL PROPOSED JACK AND BORE LOCATIONS. THIS INVESTIGATIVE WORK

SHALL BE PERFORMED PRIOR TO ANY PIPE LAYING ACTIVITIES AND SHALL BE PRESENTED TO CSC FOR

ANALYSIS TO DETERMINE THE FEASIBILITY OF SAID JACK AND BORE OPERATIONS. CSC WILL MAKE THE

FINAL DETERMINATION AS TO LOCATION AND ELEVATION FOR THE INSTALLATION OF THE PROPOSED

SANITARY SEWER LINE AT ALL PROPOSED JACK AND BORE LOCATIONS.

SMH 155

SD

SD

G G G G

G G G

G G

G G G

G G G G G

G

G

G G G

G G

G

G

G

G

G

G

G G

G G

G

G G

G G G

G

G G G G G G

G

G

G G

G

G

G G G

G G

G G

G G

W

W W W

W W W

W W W W

W W

W W

W W

W W W

W

W W W W W

W W W W W W

W

W W

W W W

W

W W

W W W W

W

W W

W

W

W W

W

W W W W W

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

PARKING AREA

ASPHALT

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT DRIVE

ASPHALT DRIVE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

CONCRETE

SIDEWALK

CONCRETE

SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

CONCRETE SIDEWALK

ASPHALT PARKING

ASPHALT PARKING

ASPHALT PARKING

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

TANK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

ATHLETIC

FIELD

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

AREA UNDER

CONSTRUCTION

TANK

AREA UNDER

CONSTRUCTION

POOL

ONCRETE SIDE

IDEW ALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT PARKING

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

TENNIS

COURTS

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT DRIVE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

CONCRETE SIDEWALKCONCRETE SIDEWALKCONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALKCONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALKCONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

DIRT DIRTDIRT

DIRTDIRT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

ASPHALT PARKING AREA

NNN

DRAWN

CHECKED

DATE

SCALE

JOB NO.

REVISIONS BY

TLT

LCR

07-06-10

P-10.03

SHEET SB_01

1" = 200’

"I" STREET

"H" STREET

"G" STREET

MEADOWS DRIVE "F" STREET

"C" STREET

"I" STREET (FISHER STREET)

SOIL BORING LOCATIONS

B-1

B-2

B-3

B-4

B-5 B-6

B-7

B-8 B-9 B-10 B-11 B-12

B-13

B-14 B-15

B-16

B-17

B-18

GENERAL NOTES:

SOIL EXPLORATION AND GEOTECHNICIAL STUDY BY:

GEOTECHNICAL ENGINEERING TESTING, INC.

904 BUTLER DRIVE

MOBILE, ALABAMA 36693

"G" STREET

BORING NUMBER

B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 B-10 B-11 B-12 B-13 B-14 B-15 B-16 B-17 B-18 B-19

TICKET NUMBER

10080512000473 10080512020476 10080512040479 10080512070481 10080513210563 10080513220566 10080513230570 10080513250573 10080513260575 10080513270577 10080513280580 10080513280582 10080513320588 10080513360594 10080513370596 10080513380601 10080513440613 10080513450618 10080513460620

GEOTECHNICIAL ENGINEERING TESTING, INC.

LINE LOCATOR TICKET NUMBERS

"J" STREET

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

PARKING AREA

ASPHALT

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT DRIVE

ASPHALT DRIVE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

CONCRETE

SIDEWALK

CONCRETE

SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

CONCRETE SIDEWALK

ASPHALT PARKING

ASPHALT PARKING

ASPHALT PARKING

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

TANK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

AREA UNDER

CONSTRUCTION

AREA UNDER

CONSTRUCTION

AREA UNDER

CONSTRUCTION

AREA UNDER

CONSTRUCTION

TANK

AREA UNDER

CONSTRUCTION

POOL

ONCRETE SIDE

IDEW ALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT PARKING

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

TENNIS

COURTS

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT DRIVE

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT DRIVE

ASPHALT DRIVE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

CONCRETE SIDEWALKCONCRETE SIDEWALKCONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

CONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALKCONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

CONCRETE SIDEWALKCONCRETE SIDEWALK

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

PARKING AREA

DIRT DIRTDIRT

DIRTDIRT

PARKING AREA

ASPHALT

PARKING AREA

ASPHALT

ASPHALT PARKING AREA

File details come from the government source that posted it. Updated .