Attachment_3_-_Repair_Sewage_Distribution_AF66.pdf
PDF 84 KB Posted
- Attached to
- Repair Sewage Distribution System Phase 1
- Solicitation number
- FA301019RA025-RepairSewageDistributionSystemPhase1
About this file
This submittal register outlines 26 items required from a contractor in response to a solicitation for repairing a sewage distribution system. The contractor must provide submittals including concrete, rebar, pipe, valves, manholes, aggregates, asphalt, fencing, and sod at various stages of the project. The register also requires hazardous materials questionnaires, warranties, and recycling/disposal reports before and after contract completion.
The related federal contract opportunity is a solicitation to repair sewage distribution lines at Keesler Air Force Base for $1-5 million. As a HUBZone set-aside, only certified historically underutilized business zone small businesses may bid. The NAICS code is 237110 and size standard is $39.5 million. The solicitation and drawings will post on October 15th 2019 on FedBizOpps, with bids due November 14th 2019. The contract performance period is 360 days after notice to proceed. Interested parties must register in the System for Award Management and check FedBizOpps for amendments. The solicitation is issued by the Department of the Air Force Air Education and Training Command.
See Attachment 3 - Repair Sewage Distribution AF66.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 HazMat Questionnaire 3 3 5 Days Prior to Start Date
2 HazMat MSDS 3 3 5 Days Prior to Start Date
3 Hazmat Reporting Entry Form 3 3 5 Days Prior to Start Date
4 Hazmat Reporting Entry Form 3 3 End of Contract 5 Recycling and Landfill Report 3 3 End of Contract 6 Warranty (Manufacturer's) 3 End of Contract 7 1-Year Warranty (Contractor) 3 End of Contract
8 Submittal: Concrete 1 Within 30 days of notice to proceed
9 Submittal: Rebar 1 Within 30 days of notice to proceed
10 Submittal: Stormwater Pipe 2 2 Within 10 days of notice to proceed
11 Submittal: Sewer Pipe 2 2 Within 10 days of notice to proceed
12 Submittal: Pipe Gasket and Fittings 2 Within 10 days of notice to proceed
13 Submittal: Precast Manholes 2 1 Within 30 days of notice to proceed
14 Submittal: Valves 1 2 Within 10 days of notice to proceed
15 Submittal: Valve Boxes 2 Within 10 days of notice to proceed
16 Submittal: Limestone Aggregate 1 End of Contract
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
CONTRACTOR
RESUBMITTAL
DATE CONTRACTOR
NOTIFIED
APPROVED DIS-
APPROVED
SUBMITTAL REGISTER PROJECT NUMBER
MAHG10-1016
PROJECT TIT
Repair Sewage Dis
TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT A
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
D
AT
A
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
D O
C U
M
EN
T \ R
EP
O
R T
REQUIRED SUBMISSION DATE
I T E M
N U M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
SH
O
P D
R
AW
IN
G
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
NO. OF COPIES REQUIRED
C O
LO
R
S
EL
EC
TI
O N
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
CONTRACTOR
RESUBMITTAL
DATE CONTRACTOR
NOTIFIED
APPROVED DIS-
APPROVED
SUBMITTAL REGISTER PROJECT NUMBER
MAHG10-1016
PROJECT TIT
Repair Sewage Dis
TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT A
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
D
AT
A
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
D O
C U
M
EN
T \ R
EP
O
R T
REQUIRED SUBMISSION DATE
I T E M
N U M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
SH
O
P D
R
AW
IN
G
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
NO. OF COPIES REQUIRED
C O
LO
R
S
EL
EC
TI
O N
17 Submittal: Geotextile Drainage Fabric 1 Within 30 days of notice to proceed
18 Submittal: Flowable Fill Concrete 1 End of Contract
19 Submittal: Hot Mix Asphalt 1 Within 30 days of notice to proceed
20 Submittal: Thermoplastic Pavement Material 1 1 Within 30 days of notice to proceed
21 Submittal: Water Hydrant 1 2 Within 10 days of notice to proceed
22 Submittal: Air Release Valves 2 Within 10 days of notice to proceed
23 Submittal: Epoxy Cement 1 End of Contract 24 Submittal: Sod 1 End of Contract
25 Submittal: Chain link Fencing 1 1 Within 30 days of notice to proceed
26 Submittal: Privacy Fencing 1 1 1 Within 30 days of notice to proceed
Must be filled out if contractor answers YES to the Hazmat
Questionnaire
Submit Final Quantities
FINAL APPROVAL REMARKS
TLE
stribution
ADMINISTRATOR
FINAL APPROVAL REMARKS
TLE
stribution
ADMINISTRATOR
File details come from the government source that posted it. Updated .