Attachment_1_-_Repair_Sanitary_Sewer_DWG_Part_3.pdf
PDF 4 MB Posted
- Attached to
- Repair Sewage Distribution System Phase 1
- Solicitation number
- FA301019RA025-RepairSewageDistributionSystemPhase1
About this file
This solicitation package includes drawings and specifications for a federal contract opportunity to repair sanitary sewer lines across Keesler Air Force Base. The contractor will be required to furnish all labor, equipment, materials and perform all operations to repair or replace major sanitary lines as defined in the statement of work and accompanying documents. The work must be completed within 360 days of receiving notice to proceed. The acquisition will be set aside for historically underutilized business zones and utilize performance price tradeoff procedures. The NAICS code is 237110 and the size standard is $39.5 million. The estimated value is between $1-5 million. The solicitation is expected to be posted on October 15, 2019 with a closing date of November 14, 2019. Interested HUBZone contractors must register in SAM to be eligible for award.
Attachment 1 - Repair Sanitary Sewer DWG Part 3.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NNN
DRAWN
CHECKED
DATE
SCALE
JOB NO.
REVISIONS BY
TLT
LCR
07-06-10
P-10.03
SHEET CS_03
1" = 200’
"I" STREET
"H" STREET
"G" STREET
MEADOWS DRIVE
"F" STREET
"C" STREET
"I" STREET (FISHER STREET)
"G" STREET
1 2 3 4 5 6
8 9
12 13 14
192021222324
28 29 30 31 32 33 34 35
384041
595756
48 47 46
"J" STREET
Node ID Northing Easting Node ID Northing Easting Node ID Northing Easting
67 331974.68 959140.32 68 331973.80 959289.13 69 331931.13 959364.35 70 331814.38 959365.43 71 332070.99 959034.16 72 332251.57 959031.45 73 332321.35 959030.53 74 332257.18 959536.88
34 331162.57 959788.71 35 331168.53 960389.51 36 331614.91 960380.86 37 331947.99 960381.19 38 331610.63 959784.03 39 331727.94 959698.17 40 331610.02 959699.30 41 331607.05 959444.46 42 331992.18 959439.69 43 331602.99 959039.08 44 331602.75 959015.11 45 331594.68 958328.83 46 331589.02 957794.56 47 331587.40 957644.57 48 331583.89 957341.43 49 331579.69 957036.78 50 331866.71 957179.94 51 332278.31 957433.46 52 332255.06 957636.62 53 332108.62 957638.57 54 332297.83 957635.72 55 332237.53 957636.98 56 332238.74 957787.57 57 332239.10 957875.95 58 332289.07 957874.28 59 332243.02 958215.39 60 332343.02 958214.61 61 332244.26 958322.10 62 332063.87 958323.92 63 331788.88 958326.76 64 331796.01 959037.34 65 331849.49 959036.74 66 331850.80 959138.78
1 330298.23 956936.36 2 330302.74 957320.99 3 330306.02 957658.87 4 330313.97 958343.06 5 330321.25 959028.10 6 330322.69 959158.78 7 330022.69 959158.78 8 330328.03 959713.44 9 330328.86 959797.91 10 330335.96 960458.33 11 330290.12 964478.30 12 330340.33 960865.41 13 330344.05 961212.06 14 330347.24 961508.65 15 330958.52 961816.22 16 330900.96 961206.14 17 330958.52 960834.45 18 330958.52 960391.22 19 330720.30 960395.27 20 330713.73 959794.02 21 330713.03 959708.60 22 330705.36 959023.34 23 330698.17 958339.01 24 330690.65 957654.39 25 330890.23 957309.13 26 330892.24 956927.67 27 330725.32 956663.35 28 331133.41 957063.08 29 331136.14 957302.22 30 331139.02 957649.53 31 331146.10 958333.78 32 331154.49 959018.61 33 331161.42 959703.59
NOTE:
NODE ID LOCATIONS SHOWN REPRESENT THE INTERSECTION
OF BASELINES, BEGINNING OF A BASELINE, END OF A
BASELINE OR A TURN IN THE BASELINE.
ELECTRIC
PAD
"G" STREET
"G" STREET
"G" STREET
"G" STREET
"G" STREET
"I" STREET (FISHER STREET)
"H" STREET
"H" STREET
"H" STREET
"H" STREET
"H" STREET
"H" STREET
"H" STREET
"G" STREET
"I" STREET (FISHER STREET)
MEADOWS DRIVE
"H" STREET (WEST)
"G" STREET (EAST) "G" STREET (EAST) "G" STREET (EAST)
MEADOWS DRIVE
ELECTRIC
PAD
G
C
CABLE BOX
WATER
VALVE
A/C
PAD
GAS
VALVE
GAS METER
HIGH
VOLTAGE
GAS
VALVE
PULL BOX
ICV
T
TELEPHONE
BOX
T
TELEPHONE
BOX
EXIST D.I.
TOP = 16.57’ +/-
EXIST D.I.
TOP = 18.23’ +/-
ELECTRIC PADS
SD
SD
G G G G
G G G
G G
G G G
G G G G G
G
G
G G G
G G
G
G
G
G
G
G
G G
G G
G
G G
G G G
G
G G G G G G
G
G
G G
G
G
G G G
G G
G G
G G
W
W W W
W W W
W W W W
W W
W W
W W
W W W
W
W W W W W
W W W W W W
W
W W
W W W
W
W W
W W W W
W
W W
W
W
W W
W
W W W W W
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
PARKING AREA
ASPHALT
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT DRIVE
ASPHALT DRIVE
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
CONCRETE
SIDEWALK
CONCRETE
SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
CONCRETE SIDEWALK
ASPHALT PARKING
ASPHALT PARKING
ASPHALT PARKING
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
TANK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
AREA UNDER
CONSTRUCTION
AREA UNDER
CONSTRUCTION
AREA UNDER
CONSTRUCTION
AREA UNDER
CONSTRUCTION
TANK
AREA UNDER
CONSTRUCTION
POOL
ONCRETE SIDE
IDEW ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT PARKING
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
TENNIS
COURTS
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT DRIVE
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
CONCRETE SIDEWALKCONCRETE SIDEWALKCONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALKCONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALKCONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
DIRT DIRTDIRT
DIRTDIRT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
ASPHALT PARKING AREA
CONC
BLDG
A/C PAD A/C PAD
ELECTRIC
PADS
ELECTRIC
PAD
"G" STREET
"H" STREET
30" CPP
12"
6" MTL
6" MTL
6" MTL
GAZEBO
HIGH
VOLTAGE
10"
SMH #953
TOP = 18.19’
INV SE = 12.13’
INV N = 11.97’
ABANDONED
6" PVC
6"
6"
SS
SS
SS D
D
FISHER HOUSE
BIO-ENVIRONMENTAL
420 412
TYER HOUSE
KEESLER AIRE FORCE BASE
MEDICAL CENTER
CHILD DEVELOPMENT CENTER
99904
DAPS
904 DENTAL CLINIC
WALL STUDIO
417 416
RESEARCH LAB
DENTAL CLINIC
413 404
CLINICAL RESEARCH LAB
WEATHER TRNG FAC
REHAB TO THIS PART OF SYSTEM
NOT INCLUDED IN CONTRACT
SMH #974
TOP = 19.69’
INV S = 14.48’
INV W = 14.20’
INV E = 14.31
"H" STREET
"H" STREET"H" STREET (WEST)
"G" STREET "G" STREET
S S S S S S
S S
S S S S S S S S
S
S S S S S
S
S S
S
S
S
S
S S
S
S
S
S S
S S S S
S
SSSS
S
S
SSSS
S
S
SS
SSSS
S
S S S S
SSSS
S
S
SSSSSS
S
SS
S
S
S S
S
S S
S
SSS
S
S
S
S
S
SSS S S S S
SS S S
SS S
S SS
S S
S S S
SS
S
S
S
S
SS
SSS
SS
S
S
SS
S
S
S S
S
S
S S
S
S
S
S
S S S
S S
SS
S
S S
S S
S
S
S
S
S
S
S S S S S S
S
S
S
S S S S S S
S
S
S
S
S
S
SMH 1030
SMH 630
SMH 624 SMH 616
SMH 613 SMH 608
SMH 606
SMH 603
SMH 1069
SMH 595
SMH 592
SMH 637
SMH 645 SMH 650 SMH 1065
SMH 684SMH 673
SMH 674
SMH 688 SMH 694 SMH 995 SMH 998
SMH 1000
LIFT STA.
SMH 1002
SMH ?
SMH ?
SMH 889
SMH 882
SMH 888
SMH 885
SMH 920 SMH 909 SMH 898 SMH 890
SMH 563 SMH 539
SMH 526
SMH 532 SMH 994
SMH 980
SMH 954
SMH 968 SMH 969
SMH 832 SMH 835
SMH 839
SMH 850 SMH 865 SMH 870 SMH 881
SMH 747SMH 736
SMH 734
SMH 714SMH 709
SMH 703
SMH 500SMH 492
SMH 402
SMH 413
SMH 411SMH 1017
SMH 60 SMH 57
SMH 22
SMH 119
SMH 154 SMH 321 SMH 224 SMH 217 SMH 214
SMH 215
SMH 168 SMH 166
SMH 163
SMH 157
SMH 380
SMH 385
SMH 1066
SMH 354
SMH 353
SMH 355
SMH 349
SMH 310
SMH 330
SMH 334
SMH 333
SMH 303
SMH 299SMH 301
SMH 296
SMH 289
SMH 281
SMH 282
SMH 273
SMH 248SMH 225
SMH 239
SMH 125
SMH 129 SMH 180
SMH 181
SMH 188 SMH 212
SMH 143
SMH 138
SMH 112
SMH 110
SMH 366
SMH 377
SMH 379
SMH 46
SMH 39
SMH 37
SMH 30
SMH 10
SMH 11
SMH 14
SMH 15
SMH 19
SMH 424 SMH 423
SMH 449
SMH 448
SMH 445
SMH 460
SMH 478
SMH 1033
SMH 455
SMH 1019
SMH 576
SMH 571 SMH 541
SMH 551
SMH 517
SMH 288
SMH 974 SMH 953
SMH 720 SMH 761
SMH 1068
SMH 748 SMH 750
SMH 776
SMH 782
SMH 785
SMH 789SMH 384
SMH 381
SMH 1102
SMH 1100SMH 1097SMH 1092SMH 1088
SMH 1085
SMH 1082
SMH 1083
SMH 101
SMH 79
SMH 78
SMH 73
SMH 85
SMH 86SMH 88
SMH 794
SMH 837
SMH 860 SMH 878
SMH 810
SMH 809
SMH 803
SMH 797
SMH 796
SMH 1044
NOTE:
BEFORE UNDERTAKING ANY PORTION OF WORK INVOLVING LAYING NEW SEWER LINES, THE CONTRACTOR
SHALL HAVE ALL UNDERGROUND UTILITIES CLEARLY MARKED AT ALL JACK AND BORE LOCATIONS AND SHALL
HAVE DETERMINED THE EXACT ELEVATIONS OF ANY AND ALL EXISTING LINES, BOXES, CABLES, ETC; THAT MAY
BE IN THE DIRECT PATH OF THE PROPOSED JACK AND BORE. SHOULD IT BE DETERMINED FROM THE FIELD
INVESTIGATION THAT THERE IS A CONFLICT WITH EXISTING UTIITIES WITH THE PROPOSED JACK AND BORE AT
ANY LOCATION, THE CONTRACTOR SHALL PROMPTLY REPORT IN WRITING TO CSC, OR HIS AUTHORIZED
REPRESENTATIVE THE AFOREMENTIONED CONFLICT. THE CONTRACTOR SHALL OBTAIN A WRITTEN
INTERPRETATION OR CLARIFICATION FROM CSC OR HIS AUTHORIZED REPRESENTATIVE BEFORE PROCEEDING
WITH ANY WORK AFFECTED BY SAID CONFLICT.
NNN
DRAWN
CHECKED
DATE
SCALE
JOB NO.
REVISIONS BY
TLT
LCR
07-06-10
P-10.03
SHEET OV_01
1" = 200’
SPECIAL NOTES TO CONTRACTOR:
WATER/SEWER LINE CONFLICTS
1. IN ALL CASES WHERE THE NEW SEWER LINE BEING CONSTRUCTED HAS LESS THAN A TEN (10’) FOOT
HORIZONTAL SEPARATION FROM THE EXISTING POTABLE WATER LINE, THE CONTRACTOR SHALL
SUBSTITUTE THE SDR 26 PVC MATERIAL FOR THE SEWER LINE WITH SDR 18 C-900 PVC, OR SDR 21
C-900 PVC AS SPECIFIED. THE CONTRACTOR SHALL USE THE APPROPRIATE TRANSITION GASKETS AND
FITTINGS WITH MEGALUGS TO TRANSITION FROM SDR 26 PVC PIPE TO SDR 18 C-900 PVC PIPE. IN
ALL CASES, THE CONTRACTOR SHALL ADHERE TO THE MOST CURRENT MISSISSIPPI STATE HEALTH
DEPARTMENT REGULATIONS WITH REGARD TO WATER AND SEWER LINE SEPARATION, BOTH HORIZONTALLY
AND VERTICALLY.
THESE PLANS HAVE ATTEMPTED TO IDENTIFY AND QUANTIFY ALL OF THESE SEGMENTS OF SEWER LINE
THAT WILL BE REQUIRED TO MEET THESE STANDARDS. THIS INFORMATION WAS DETERMINED FROM BEST
AVAILABLE INFORMATION FROM FIELD SURVEYS AND RECORD DRAWINGS AS SUPPLIED BY CSC.
JACK AND BORE
2. CONTRACTOR SHALL UTILIZE A GROUND RADAR SYSTEM SIMILAR TO THE "UTILITY SCAN" SYSTEM BY
GEOPHYSICAL SURVEY SYTEMS, INC., TO DETERMINE THE SIZE, ELEVATION AND LOCATION OF EXISTING
UNDERGROUND UTILITIES AT ALL PROPOSED JACK AND BORE LOCATIONS. THIS INVESTIGATIVE WORK
SHALL BE PERFORMED PRIOR TO ANY PIPE LAYING ACTIVITIES AND SHALL BE PRESENTED TO CSC FOR
ANALYSIS TO DETERMINE THE FEASIBILITY OF SAID JACK AND BORE OPERATIONS. CSC WILL MAKE THE
FINAL DETERMINATION AS TO LOCATION AND ELEVATION FOR THE INSTALLATION OF THE PROPOSED
SANITARY SEWER LINE AT ALL PROPOSED JACK AND BORE LOCATIONS.
SD
SD
G G G G
G G G
G G
G G G
G G G G G
G
G
G G G
G G
G
G
G
G
G
G
G G
G G
G
G G
G G G
G
G G G G G G
G
G
G G
G
G
G G G
G G
G G
G G
W
W W W
W W W
W W W W
W W
W W
W W
W W W
W
W W W W W
W W W W W W
W
W W
W W W
W
W W
W W W W
W
W W
W
W
W W
W
W W W W W
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
PARKING AREA
ASPHALT
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT DRIVE
ASPHALT DRIVE
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
CONCRETE
SIDEWALK
CONCRETE
SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
CONCRETE SIDEWALK
ASPHALT PARKING
ASPHALT PARKING
ASPHALT PARKING
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
TANK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
ATHLETIC
FIELD
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
AREA UNDER
CONSTRUCTION
TANK
AREA UNDER
CONSTRUCTION
POOL
ONCRETE SIDE
IDEW ALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT PARKING
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
TENNIS
COURTS
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT DRIVE
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT DRIVE
ASPHALT DRIVE
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
CONCRETE SIDEWALKCONCRETE SIDEWALKCONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
CONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALKCONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
CONCRETE SIDEWALKCONCRETE SIDEWALK
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
PARKING AREA
DIRT DIRTDIRT
DIRTDIRT
PARKING AREA
ASPHALT
PARKING AREA
ASPHALT
ASPHALT PARKING AREA
File details come from the government source that posted it. Updated .