Road Map to CE Tier Workload
View the file
Other files for this federal contract opportunity
Show all 50
Vance AFB Base Operations Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Document | Purpose | Can Be Used | Location |
| PWS- 11-1 | Defines the Governments' requirements | To develop manning and required skills and Work-Breakdown-Structure | PWS |
| PWS- 11-2 | Defines the Governments' requirements standards, measurable and attainable | To measure the contractor's compliance to the Government standards | PWS |
| PWS- 11-4 | List applicable governing publication | Self-explanatory | PWS |
| PWS- 11-5 | Defines and categorize the historical workload into RWP, DSW, and work orders | To develop manning, required skills and skill levels and Work-Breakdown-Structure | PWS |
| PWS- 11-7 | Defines the required reports | To develop reports workload | PWS |
| PWS- 11-16 | Defines Government provided training | As an aid in developing the contractor training program | PWS |
| PWS- 11-19 | Defines special training, certification, or licensing requirements | To develop special training, certification, or licensing requirements | PWS |
| Work Priority Table | Defines new work priorities and work classifications | To re-define historical workload into new work classifications | PWS Para. 11.3.2.1 and Technical Library |
| Legacy to NexGen Bridging Table | Defines and bridges the old Legacy categories, priority classification and terminology to the new NexGen categories priority classification and terminology | To convert the historical Legacy workload into the required NexGen Classification for bidding purposes | PWS Para. 11.3.2.2 and Technical Library |
| 7115 Report | Identifies the base Real Property and Real Property Installed Equipment | To develop manning, required skills and skill levels and Work-Breakdown-Structure | Technical Library |
| Critical Asset List | Identify the base critical facilities/Systems | In conjunction with the base 10-2 plan for base recovery | Technical Library |
| Priority Asset List (PAL) | Categorized the base assets into tiers based on mission criticality | To develop manning and required skills and prioritize workload | Technical Library |
| MAS | Identifies the preventive maintenance requirements by skill set for the base Real Property and Real Property Install Equipment | When developing Preventive Maintenance Program, | Technical Library |
| General Transformation Information | Provide the Offeror with purpose, direction and goals of the Civil Engineer Transformation Initiative | To provide the contractor with a better understanding for the need for flexibility in future workload, requirements and funding initiatives | Technical Library |
| Additional Work Document | Provide the Offeror with additional detailed workload information about the Change of Occupancy, Custodial, Elevator, Utility Privatization and Operations workload requirements | To develop manning, required skills and skill levels and Work-Breakdown-Structure, categorize Legacy workload into NexGen categories priority classification | Technical Library |
| Sample Work Break-down Structure | To verify that all requirement have been identified by PWS paragraph and CLIN and that acceptable manpower is allocated to that requirement, indicate total FTEs applied to each requirement and proposed cost of each requirement | To develop manning, identify required skills and skill levels, developing price model and developing inputs for the Pricing Tier Matrix | Technical Library |
| Schedule B | Provides CLIN structure and requirements paragraph reference | To verify the correct PWS reference paragraph is assigned to the correct CLIN | Technical Library |
| Pricing Tier Matrix | To provide the Government with a pre-priced cost for specific workload categorized by description, Operational priority and NexGen Priority Classification | After the Offerors has developed a total price for accomplished 100% of the required workload, (Operation Sustainment and Entomology)this matrix can be used to provide specific cost after specified workload has been removed | Attachment to Schedule B |