Attachment_for_Section_L_-_PPI_Tool_Instructions.pdf

PDF 261 KB Posted

Attached to
Vance AFB Base Operations Support Federal contract opportunity
Solicitation number
FA3002-13-R-0011
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Attachment 6 - PPI Tool Instructions

View the file

Other files for this federal contract opportunity

Other files attached to Vance AFB Base Operations Support, newest first.
File Type Posted
11_05_VNC_Operations_Workload_Appendix_Amendment_0012.pdf PDF
MFR-_Amendment_0009.pdf PDF
FA3002-13-R-0011-Amendment_0009.pdf PDF
Amendment_0006.pdf PDF
Vance_RFI_Q A_Nov14.xls XLS spreadsheet
Tab_4_-_CAMP_VANCE_AFB_Prospectus_Amendment_0004.pdf PDF
Vance_AFB_GM_PWS_Amendment_0004-v2.pdf PDF
Vance_AFB_ISWM_(Refuse-Recycling)_PWS-_Amendment_0004.pdf PDF
CBA_Memo_-_19_Dec_14.docx DOCX document
Amendment_0003.pdf PDF
10_05_VNC_Installation_Management_Appendix_10B_Workload_amendment_0003.doc DOC document
11_05_VNC_Operations_Workload_Appendix_amendment_0003.doc DOC document
26_05_VNC_Purchasing_Appendix_26B_Workload_amendment_0003_.doc DOC document
RWP_Abbreviation_List_amendment_0003.xlsx XLSX spreadsheet
26_01_VNC_Purchasing_Description_of_Services_amendment_0003.pdf PDF
Vance__GFP_Amendment_0003.xlsx XLSX spreadsheet
07_01_VNC_Comm_IT_Service_Description_of_Services_amendment_0003.pdf PDF
25_05_VNC_Transportation__Appendix_25B_Workload_amendment_0003.doc DOC document
Map.pdf PDF
2014_Site_Visit_Schedule.pdf PDF
FY15_BOS_QASP_(4)-_8_Oct_14.pdf PDF
469_-_Plumbing__MAS.pdf PDF
472_-_EC_Shop_MAS.pdf PDF
PAD_12-03_Revision_1_Summary.pdf PDF
AAFES_Approved_Agreement_9_Jun_04.pdf PDF
VANCE_WORKFORCE_DEMOGRAPHIC_INFORMATION.docx DOCX document
Vance_AFB_PWS_28_Oct_14.pdf PDF
Change_1_Memo _11_Jul_11.pdf PDF
Vance_DD_254.pdf PDF
DBA___OK140021_(Highway).pdf PDF
GFE_Appendix.pdf PDF
BOS_ECS_and_ME_Functions_-_16_Oct_13.pdf PDF
FA3002-13-R-0011-_Vance_BOS_6_Nov_14.pdf PDF
Memorandum_for_Vance_AFB_Site_Visit.pdf PDF
FA3002-13-R-0011_Vance_BOS_Pre-Solicitation_Notice_(26_Sep_2014)_(2).pdf PDF
Vance_BOS_13_Aug_14_DRFP_Q A.pdf PDF
FOUO - Vance - 28Apr14.pdf PDF
General_Transformation_Info_Part_2.zip ZIP file
DRFP_-FA3002-13-R-0011_13_Aug_14.pdf PDF
PAST_PERFORMANCE_INFORMATION.docx DOCX document
2014_SCAt_H W_Fringe_Benefit_Changes.pdf PDF
Vance_BOS_Price_Model_-13_Aug_14.xlsx XLSX spreadsheet
Consolidated_Response_to_Industry_Questions_as_of_18_Mar_14.pdf PDF
CE_Tier_Workload_-_Rev1.xlsx XLSX spreadsheet
REQUEST_FOR_INFORMATION_VANCE_BOS_DRAFT_PERFORMANCE_INCENTIVE_PLAN_-_7_Feb_14.pdf PDF
BOS_Performance_Incentive_Plan_(6_Feb_14).pdf PDF
RWP.pdf PDF
Sample_-_Vance_CLIN_10_Revised_6_Feb_14.xlsx XLSX spreadsheet
TIER_PRICING_DOCUMENT_INFO_SHEET.docx DOCX document
SCA_WD_2005-2432_Rev_17_dated_19_Jun_13.pdf PDF
Show all 50

Vance AFB Base Operations Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L Attachment “6” Instructions to Offerors

Past Performance Information (PPI) for Offerors

Offerors must use the PPI Tool (Use latest version from FBO.gov) in order to electronically submit the Past Performance Volume in accordance with the RFP.

Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):

1. Access the FedBizOpps (https://www.fbo.gov/) website.

2. Find the solicitation posting.

3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the link and save the “ppi tool” to your computer. Name the file as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).

Note: PPI Tools saved in Microsoft Office versions 2007 and greater will be saved with “.accdb” file extension.

Entering information in the PPI Tool After selecting and saving the tool, enter information by performing the following steps:

1. Open the saved PPI Tool.

2. Select the “Options” button from the “Security Warning” banner, if applicable

. The “Security Alert” pop-up screen displays.

Figure 1: Security Alert Pop-up

Note:

• Files saved using Microsoft Office 2010 will have the “Enable Content” button on the “Security Warning” banner and therefore will not get a Security Alert pop-up.

https://www.fbo.gov/

• If a "read only" file is opened, in order to populate data in the file, click "Save As" in the "Read-Only" message bar. Enter the filename as the prime contractor + RFP number + file extension (e.g. XYZCompanyFA861710R6158.accdb).

3. Select the radio button “Enable this content” and then click “OK.” A setup pop-up screen displays.

Figure 2: Setup Pop-Up

4. Select the “Start” button. The “Application Setup” screen displays.

Figure 3: Application Setup Screen

Note: Once the Offeror’s Name and RFP Number have been entered they can be edited by selecting the “Edit Offeror And RFP Number” button from the “Contractor’s Menu”

5. Enter the Offeror’s Name and RFP Number and then click the “Next” button. The application setup continues.

Figure 4: Continue the Application Setup

6. Choose the appropriate option by selecting the corresponding radio button and then click the

“Next” button. The “Contractor’s Menu” displays.

Figure 5: Contractor’s Menu

7. Click the “Step 1: Set up Business Relationships” button to create a business relationship, if applicable, for each contributing contracting organization before proceeding throughout the PPI Tool (refer to Section L of the RFP for detailed instructions). Identify all prime and sub-prime organizations and categorize them according to the appropriate role in the proposed acquisition. The “Business Relationships” screen displays.

Figure 6: Business Relationships

8. Click the “New” button to create a business relationship for the proposed acquisition. An additional “Business Relationships” screen displays.

Figure 7: Enter New Business Relationship

9. Complete the fields as follows (fields marked on the screen with an asterisk ‘*’ are required):

• Contractor’s Name: Self-explanatory

• Role in Proposed Acquisition: Choose one of the four options – Prime, Sub, Joint

Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

• Place of Work: Location where contractor will perform work.

• Percentage of Work: Identify percentage of work contributed by specified contracting organization.

• Responsibilities: Detail responsibilities of specified contracting organization.

10. Select one of the buttons at the bottom of the screen.

• Add – Saves the current business relationship and allows for the addition of a new one.

• Close – Cancels the current business relationship without saving.

Note: In order to edit or delete an existing business relationship in the list, double-click on it.

11. Select the “Close” button on the “Business Relationships” screen after all of the business relationships has been added.

12. Click the “Step 2: Enter Past Performance Information (PPI)” button to enter the Past Performance Information. The “Past

Performance” screen displays.

Figure 8: Past Performance

13. Click the “New” button to enter Past Performance Information for the proposed acquisition.

An additional “Past Performance” screen displays.

Figure 9: Enter Past Performance Information

14. Complete the fields on each of the tabs as follows (fields on the screen marked with an asterisk ‘*’ are required):

• Contract Information Tab Contractor: Select from the dropdown the appropriate contractor.

Cage Code: Self-explanatory.

Contract Number: If you don’t have a contract number, enter “N/A.”

Program Title: Enter full name of program.

Contr Agency/Customer: Enter servicing contracting agency and customer (office symbols suffice).

DUNS Number: Self-explanatory

Delivery Task/Order: If the order is provided as a stand-alone reference, enter the task/call/delivery/purchase order number.

Contract Type: Enter Firm-Fixed-Price (FFP), Cost Plus Fixed-Fee (CPFF), Indefinite Delivery/Indefinite Quantity (ID/IQ), LH, Blanket Purchase Agreement (BPA), Cost Plus Incentive-Fee (CPIF), Cost Plus Award Fee (CPAF), etc. For additional clarification, click the question mark button.

Short Program Title (i.e. Acronym): Enter abbreviated title for the program or enter “N/A.”

Contract Dollar Value:

o Original: Input total contract dollar value, with all options if applicable, in the amount originally awarded on the referenced contract.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

o Current: Input total contract dollar value, with all options if applicable, as the contract stands at time of PPI submission.

If ID/IQ or BPA, provide total ceiling.

If stand-alone task/call/delivery/purchase, provide amount of the individual contract.

Period of Performance (mm/dd/yy) o Start Date: Input start date of contract.

o Original End Date: Input original end date based on award.

o Current End Date: Input end date, as the contract stands at time of PPI submission.

o Explain the differences in Period of Performance, if applicable: Enter an explanation of the difference between “Original End Date” and “Current End Date.”

• Program Details Tab Brief Description of Effort as:

o Select Prime, Sub, Joint Venture, or Other (Explain). An explanation comment box will display when you select “Other.”

o Provide a brief description of the service provided and actual work performed under this contract reference.

o ****If applicable: Provide information on problems encountered on the identified contracts. At a minimum, briefly describe the problem experienced, actions taken to alleviate the problem, and whether or not the problem was satisfactorily overcome.****

Explain how your performance on this contract is relevant for each applicable factor or subfactor, as instructed under Past Performance in Section M of the RFP. Include any unique aspects that demonstrate relevancy in this effort. Provide evidence to support such relevance and the ability to perform the requirements as described in the

RFP.

Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting, if applicable.

Identify whether a subcontracting plan was required for the contract you are submitting. If one was required, identify in percentage terms the planned versus achieved goals during contract performance. Explain why goals were not met, if applicable:

• POC & Key Individuals Tab Key Individuals: Click the “New” button to specify any key individual or individuals who participated in this program or who may support the proposed acquisition. Also indicate their roles for both acquisitions, previous and current. To edit or delete an existing key individual, double-click an item from the list.

Note: In accordance with FAR 15.305(a)(2)(iii), relevant experience from key personnel may be evaluated. If you wish to include the past performance of individual key personnel, select the “New” button for each individual and fill out the necessary information.

Customer Points of Contact: Click the “Program/Site Manager,” “Contracting Officer” or “Admin POC” button for the point of contact that you would like to add, edit, or delete.

Note: For government contracts provide current information on Program Manager, Contracting Officer, and Admin POC, if available.

For commercial contracts provide points of contact fulfilling these same roles, if available.

15. Select from the buttons at the bottom of the Past Performance screen:

• Save – Saves the Past Performance Information and displays the “Contract Information” tab on the Past Performance screen.

• Close – Closes the Past Performance screen. If there were any updates, a pop-up window displays asking to save before closing.

• Delete – Deletes the current PPI record. A pop-up window displays, select “Yes” to delete the record or “No” to close the window without deleting the record.

Note: In order to edit or delete an existing PPI record in the list, double-click on it.

16. Select the “Close” button on the “Past Performance Information” screen after all of the PPI records have been added.

Printing Reports and Submitting PPI Tool In order to print the Business Relationships and PPI reports, perform the following steps:

1. Click the “Step 3: Print Report” button . A pop-up displays asking which report to print.

Figure 10: Select Report to Print

2. Select separately each of the two options, “Business Relationships” or “Past Performance.”

The Business Relationships and Past Performance documents will print separately; combine the two to create your Past Performance Volume.

In order to submit the Business Relationships and PPI, perform the following steps:

3. Click the “Step 4: Submit” button . The “Submission Instructions” screen displays.

Figure 11: Submission Instructions

4. Follow the submission instructions. Hard copies of the pages generated from this tool shall be used in the hard copy of the past performance volume subject to the limitations outlined in this RFP and should be Tab 1 of the past performance volume.

Note:

• Submit an electronic copy (e.g. CD) of the saved PPI database file with your proposal. If a prime contractor is submitting the file enter the filename as:

o prime contractor + RFP number + file extension (e.g.

XYZCompanyFA861710R6158.accdb) If a subcontractor is submitting the file enter the filename as:

o subcontractor + RFP number + file extension (e.g.

ABCCompanyFA861710R6158.accdb)

• Once the file is saved to a CD or any location that is marked as “Read-only,” it must first be saved to the desktop in order to read/edit the file.

File details come from the government source that posted it. Updated .