Questions and Answers.pdf

PDF 67 KB Posted

Attached to
89 AW HQ Water Bottle Stations (Updated)
Solicitation number
FA286026Q4033
Issued by

About this file

This is a Responses to Questions document for federal contract F1DT11 dated 3 August 2026, addressing contractor inquiries regarding the installation and maintenance of 89 water bottle stations.

The procurement requires installation of three water bottle stations at Joint Base Andrews with semi-annual preventive maintenance for all three installed units under the newly added CLIN 0004. All three existing installation locations have suitable 120V electrical service, water supply connections, drain connections, and wall support for replacement units. Standard wage determination applies to installation work, and RFO 52.228-5 insurance requirements apply for contractors performing work at the base. The government confirmed no restrictions on manufacturer or model selection provided equipment meets or exceeds all salient characteristics. Site visit was conducted on 30 July 2026 at 1000 hours with photographs provided for reference. The contracting officer clarified that semi-annual maintenance (not quarterly as originally stated) applies to all three stations and added CLIN 0004 to the contract to incorporate this maintenance requirement with updated Performance Work Statement documentation. Contractors may use standard qualified technicians for installation without union labor or prevailing-wage rate requirements beyond the standard wage determination.

View the file

Other files

File Type Posted
IMG_0701.jpeg JPEG file
IMG_0703.jpeg JPEG file
PWS Revision I.pdf PDF
IMG_0702.jpeg JPEG file
IMG_0700.jpeg JPEG file
Salient Characteristics.pdf PDF
89 AW HQ Water Bottle Stations Combo_Amendment_2.pdf PDF
89 AW HQ Water Bottle Stations Combo_Amendment_1.docx DOCX document
89 AW HQ Water Bottle Stations Combo_Amendment_1.docx DOCX document
PWS.docx DOCX document
89 AW HQ Water Bottle Stations Combo_.docx DOCX document
89 AW HQ Water Bottle Station Provisions and Clauses.pdf PDF
Salient Characteristics.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESPONSES TO QUESTIONS

89 Water Bottle Stations, F1DT11

3 Aug 2026

1. Please provide clear photographs of each of the three existing water fountains, including:

o Full front view of each unit o Surrounding wall and installation area o Manufacturer data label/model number o Existing water supply, drain, and electrical connections, if visible

A: see attached photos

2. If photographs and data labels are unavailable, would it be possible to arrange a brief site visit to inspect the three installation locations?

A: Site visit was scheduled 30 Jul 2026 @1000hrs and photos provided

3. Please confirm whether the existing locations have suitable:

o 120V electrical service o Water supply connections o Drain connections o Wall support or blocking for the replacement units

A: Current water stations are active and have all items listed below

4. Please confirm whether standard qualified technicians may perform the installation or whether union labor, prevailing-wage rates, or a specific wage determination applies.

A: Standard wage determination applies

5. Are there any specific insurance or Certificate of Insurance requirements for contractors performing work at Joint Base Andrews? If so, please provide the required limits or a sample COI.

A: RFO 52.228-5 will apply

6. The PWS requires installation of three stations but states that quarterly preventive maintenance is required for two stations. Please confirm whether quarterly maintenance should cover two or all three stations.

A: Semi-Annually maintenance will apply to all stations installed refer to the PWS

7. Please confirm whether there are any restrictions regarding the proposed manufacturer or model, provided the offered equipment meets or exceeds all salient characteristics.

A: no restrictions

A picture of the existing cooler(s) where you would like the new cooler(s) installed. If no cooler is currently present, please provide photos showing the nearest water line, electrical outlet, and drain to the desired installation location. Please label each photo to correspond with the appropriate installation location."

A: Pictures provided

8. There is no quarterly service CLIN and there is no indication for how many quarters we are to provide service, but it is listed as a requirement in the PWS.

A: We have added CLIN 0004 to incorporate semi-annual maintenance. See updated PWS.