FA2835-18-Q-0005_Addtl_Qs_and_As.pdf

PDF 74 KB Posted

Attached to
AWACS Audio Visual System Upgrade
Solicitation number
FA2835-18-Q-0005
Issued by

About this file

Additional Questions and Answers

View the file

Other files

File Type Posted
Conf._Room_B1612,_Pic_2.jpg JPG image
AWACS_AVS_Upgrade_SOW_V.2.pdf PDF
Conf._Room_B1612,_Pic_1.jpg JPG image
Combined_Synopsis_Solicitation.pdf PDF
FA2835-18-Q-0005_Qs_and_As.pdf PDF
Conf._Room_B1612,_Pic_6.jpg JPG image
Conf._Room_B1612,_Pic_4.jpg JPG image
Conf._Room_B1612,_Pic_5.jpg JPG image
Conf._Room_B1612,_Pic_3.jpg JPG image
AWACS_AVS_Upgrade_PWS.pdf PDF
Combined_Synopsis_Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER

HANSCOM AIR FORCE BASE MASSACHUSETTS

20 June 2018

SUBJECT: AWACS Audio Visual System (AVS) Upgrade, B1612, Solicitation: FA2835-18-Q-0005, Addtitional Questions and Answers

These are additional questions submitted via email the Procurement Contracting Officer (PCO) deemed necessary to provide further clarification on the SUBJECT action.

1. Clarify the number of and the exact desired sources to be outputted to the ceiling projector and/or the front wall display.

There is already an existing projector with a power cable, 2 video cables, 2 audio cables and 1 computer cable.

2. Clarify the location of the A/V equipment rack within the room.

The rack would be located in a pre-existing cabinet at the front right hand corner of the room.

3. Clarify the cable pathway from the rack location to the table.

Cable path is from the front right hand corner of the room to the corner of the conference room table closest to the power source. First chair.

4. Clarity whether a control system will be needed for system operation and where the control panel (TP) will live in the room.

On the conference table.

5. Clarify if table microphones or ceiling microphones are desired for the installation.

Ceiling microphones, as stated in the Revised SOW.

6. Clarify if the front wall can support the desired 82" display and/or if a stand will be required for the display.

The wall can support an 82" display.

7. Clarify that power will be provided for both front wall display and ceiling projector.

Power presently exists for projector and front wall display.

8. Clarify that network/Demarc and power will be provided in the rack location to support the Audio Conferencing functionality.

Yes, network and power sources presently exist in pre-existing cabinet.

9. Clarify the dimension (top to bottom-left to right) of the owner furnished (OFE) Da-Lite screen.

Top to bottom - 86" Left to right - 120"

File details come from the government source that posted it.