Attachment 4_Section L_ Instruction to offeors_Dated 11Jun25_11Pgs.pdf
PDF 878 KB Posted
- Attached to
- GWEF CHILLER PLANT AND COOLING SYSTEMS UPGRADE
- Solicitation number
- FA282325R0012
About this file
This document is a Section L Instructions to Offerors for a federal solicitation for the Guided Weapons Evaluation Facility (GWEF) HVAC Refresh project at Eglin Air Force Base. The solicitation (FA282325R0012) is a 100% Small Business Set-Aside competitive procurement for completely replacing the chiller plant system and main test chamber computer room air conditioning (CRAC) unit system, with a local area defined as within 400 miles of Eglin AFB.
Key details include a proposal submission deadline of 14 July 2025 at 0900 Central Time, an anticipated contract period of performance of 365 days after Notice to Proceed, and requirements for offerors to be small businesses registered in NAICS code 236220. The procurement will involve architectural, structural, civil, mechanical, plumbing, fire protection, electrical, communication, and security components. Proposals must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) website, with three separate volumes: Price, Past Performance, and Contract Documentation. The estimated project value is between $10-25 million, and funds are not currently available.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART IV REPRESENTATIONS AND INSTRUCTIONS
SECTION L– INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
SECTION L
FA282325R0012
DATED 11 June 2025
Instructions to Offerors and Instructions for Preparation of Proposals
1.0 OVERVIEW
The offer shall be compliant with the requirements within this solicitation as well as all associated documents, i.e. Specifications/Drawings/Statement of Work (SOW). In accordance with (IAW) the SOW dated 3 February 2023, the intent of the project FTFA 171082PA and FTFA 171082PB, Guided Weapons Evaluation Facility(GWEF) HVAC Refresh, Eglin AFB, FL is to completely replace the chiller plant system an main test chamber Computer Room Air Conditioning (CRAC) unit system. The Contractor will construct this project, IAW the criteria contained herein and using industry commercial grade products, materials, installation, and methods to comply with Department of Defense and Air Force standards as stated in the SOW, drawings/specifications, plans and all contract documents.
Work will include architectural, interior finishes, structural, civil site work, mechanical, plumbing, fire protection, electrical, communication and security components as shown on the construction documents, and phased as indicated on the plans, specifications, and other construction documents. Non-conformance with the instructions provided in this section may result in an unfavorable proposal evaluation or rejection of an offer. This acquisition is a local 100% Small Business Set-Aside, within the local Area. The local area is defined as 400 miles from Eglin Air Force Base. Addresses of businesses with an active registration to receive all awards within SAM.GOV will be used to determine eligibility.
Proposals may only be submitted by Small Business firms registered in the North American Industrial Classification System Code (NAICS) of 236220. This is a competitive best value source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Department of the Air Force Federal Acquisition Regulation Supplement (DAFFARS). These regulations are available electronically at https://www.acquisition.gov/content/regulations. Proposals may be submitted by small business interested parties pursuant to the following: At time of award, each business must be registered at SAM.gov with a Unique Entity ID (UEI) and all Representations and Certifications completed. The anticipated Period of Performance is 365 days after Notice to Proceed (NTP).
1.1 General Instructions: This section provides general guidance, as well as specific instructions on format and content, for preparing proposals. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. The Offeror's proposal must include all information required and must be submitted IAW these instructions. Compliance with these instructions is mandatory and failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and may eliminate the Offeror from further consideration for award. It is the Offeror's responsibility to ensure the completeness of the proposal submitted. Evaluation of a proposal will be conducted solely on the information contained within the submittal and the Government will not assume that an Offeror possesses any capabilities not specified.
Inconsistencies among the parts of each proposal shall be explained. Any unexplained inconsistency may raise a fundamental question of the Offeror's understanding of the requirement and/or ability to perform.
Offerors are advised that their proposals are presumed to represent their best efforts and most complete responses to this solicitation. Proposals that simply reiterate the contents of this solicitation, or contain
SECTION L
only superficial responses, may be considered unacceptable. Evidence of experience, capability, and qualifications that clearly demonstrate and support the Offeror’s claims are essential. The absence of such evidence will adversely influence the evaluation of the proposal. Offerors must clearly identify any exceptions to the solicitation terms and conditions and provide complete supporting rationale. Non-conformance with these instruction may result in an unfavorable proposal evaluation.
1.2 Electronic Reference Documents: All referenced documents for this solicitation are available on the official U.S. Government website for making, receiving, and managing federal awards, System for Award Management web site at https://SAM.gov. Potential Offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
1.3 Proposal Presentation and Preparations: The Government will not accept oral presentations in response to this solicitation. Email submissions will not be accepted. All proposals shall follow the proposal preparation instructions. Proposals are due via electronic submission (upload, CD, or DVD) no later than the solicitation end date - estimated <<14 July 2025>> at 0900 Central Time.
All Offerors must submit their proposal through the Solicitation Tool in PIEE (https://piee.eb.mil).
Alternatively, an electronic copy can be mailed, or hand carried to the contracting office. See Section 2.1 for specific instructions. Email submissions of proposals SHALL NOT BE accepted. Proposals shall not include any classified information. Note: Late submittal will be handled in accordance with (IAW) FAR
15.208. The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation, or attendance to the pre-proposal conference.
The Government will retain one digital copy of all unsuccessful proposals. Unless the Offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals (for example, additional or backup copies submitted on CD).
1.4 Points of Contact (POC): The POCs for this acquisition are listed below. Written requests for clarification shall be sent to the CO/CS prior to the due date of the proposal. All communication must be coordinated through the CO/CS using the following contact information (email is the preferred communication method due to teleworking schedules):
Donovan Wall Francisco Arredondo Contracting Officer (CO) Contract Specialist (CS) Donovan.wall.1@us.af.mil Francisco.arredondo.4@us.af.mil
AFMC AFTC/PZIOC AFMC AFTC/PZIOC
308 West D Ave 308 West D Ave Eglin AFB, FL 32542 Eglin AFB, FL 32542
1.5 FAR 52.236-27 Site Visit (Construction):
Site Visit (Construction) (Feb 1995)
(a)The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.
Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
SECTION L
Donovan Wall Francisco Arredondo Contracting Officer (CO) Contract Specialist (CS) Donovan.wall.1@us.af.mil Francisco.arredondo.4@us.af.mil
AFMC AFTC/PZIOC AFMC AFTC/PZIOC
308 West D Ave 308 West D Ave Eglin AFB, FL 32542 Eglin AFB, FL 32542
(End of Provision)
A Site Visit has been arranged for << 23 June 2025>> at 0800 A.M. Central Time. Base access requests will need to be provided to the CS listed above identifying the company name and list of individuals who will attend. Due to limited escort availability a maximum of three (3) individuals per company may attend the site visit. This limit is subject to change if the number of attendees exceeds capacity.
The email should include the following information: FULL LEGAL NAME AND DOB for each individual requesting access. Base access requests not providing at least 72-hour notice will not be honored. Interest in site visit will be confirmed with a GWEF visitors package containing additional information.
1.6 Discrepancies and Ambiguities in the Solicitation: If an Offeror believes the requirements in these instructions contain an error, omission, ambiguity, or are otherwise unsound, the Offeror shall immediately notify the Contracting Officer (CO) in writing with supporting rationale as well as the remedies the Offeror is asking the CO to consider as related to the omission or error NO LATER THAN
FIVE (5) CALENDAR DAYS AFTER THE FORMAL RFP RELEASE.
1.7 Discovery of Mistakes: Mistakes in an Offeror’s proposal that are disclosed after receipt of proposals shall be processed substantially in accordance with the procedures for mistakes in bids at FAR 14.407-4. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion. This reservation includes matters of additional or substitute pages of the initial proposal.
1.8 Teaming Arrangements/Joint Venture (JV): If the Offeror submits technical experience information that includes a Teaming Arrangement Member, Joint Venture Partner, or Mentor Protégé then the Offeror shall provide sufficient information to clearly convey the roles and responsibilities that each member or partner performed on the Past Performance Information (Attachment L6). The information of team members or joint venture partners shall be consistent with the proposed roles and responsibilities that each member or partner performed for the requirement. Identify each member's share of the prospective contract, 50/50, 51/49, etc. Clearly establish roles of each party (who was Prime and who was Subcontractor, who was responsible for what tasks, contract administration, proposals, work management, etc.).
In the event an Offeror is a JV, the Offeror may submit projects executed as the JV firm, or each JV member provided at least one (1) relevant project is submitted to demonstrate experience and provide a comprehensive narrative to demonstrate experience relevant to their role on this program.
Mentor-Protégé (M-P) is a relationship; M-Ps require formal JV, TAs, or Letters of Intent (LOIs) to qualify for consideration as a team.
SECTION L
1.9 Questions and Answers Period: All questions regarding this solicitation must be submitted in writing. All questions and subsequent answers will be posted to the SAM.gov website. It is the responsibility of the Offeror to continuously monitor the site for updates. All questions shall be submitted electronically to the individual(s) listed above no later than 09:00 A.M. CENTRAL TIME <<26 JUNE 2025>>. Information provided as a result of these questions and answers shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
1.10 Communications: Exchanges of source selection information before and after submission of the initial proposal packages between Government and Offerors will be controlled by the Contracting Officer. Email will be used to transmit such information and will be sent encrypted and must include “Source Selection Information – See FAR 2.101 and 3.104” in the subject line of the email.
1.11 Debriefings: The Contracting Officer (CO) will promptly notify Offerors of any decision to exclude them from the evaluation process; whereupon, they may request and receive a debriefing.
Offerors excluded may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, Offerors excluded from the evaluation are entitled to no more than one debriefing. The CO will notify unsuccessful Offerors in accordance with FAR 15.503. Upon such notification, unsuccessful Offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
1.12 Amendments: The Government reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time. Such revisions or amendments will be communicated on the SAM.gov website by issuance of an amendment to the solicitation. If such amendment requires material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable Offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by completing Block 18 of the SF 1442, providing signed copies of the amendments with their proposal (Volume III), or by separate letter which includes a reference to the solicitation and amendment numbers. Amendments to the solicitation after proposals are received will be issued only to the Offerors who have submitted proposals unless the Government determines that the change to the solicitation likely would have increased competition if the change had occurred prior to the proposal due date. In that case, the amendment will be posted on SAM.gov, and a revised proposal due date and time will be established.
1.13 Adequate Price Competition: The Contracting Officer (CO) has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the CO will review this determination and if, in the CO's opinion, adequate price competition exists, certification under FAR 15.406-2 will not be required. However, if at any time during this competition the CO determines that adequate price competition does not exist, Offerors may be required to submit information to the extent necessary for the CO to determine the reasonableness of the Cost/Price. Additionally, although adequate price competition is expected, if only one offer is received in response to this solicitation the responding Offeror will be required to provide certified cost or pricing data in accordance with Table 15-2, at FAR 15.408 and any proposal, bond, amendment, or revision that is received at the designated Government Office after the exact time specified for receipt of proposals will be "late" and will not be considered unless the Contracting officer determines the criteria set forth in FAR 15.208 exsists.
SECTION L
2.0 PROPOSAL PREPARTION
Proposals must be complete, self-sufficient, and respond directly to the requirements of this solicitation.
Alternate proposals will not be accepted. The Government will perform a proposal review for completeness in accordance with instructions provided. It is the Offeror’s responsibility to verify the completeness of the proposal submitted and to ensure the executed contract documentation and supporting documentation meet the requirements of Sections L & M of this solicitation. Failure to provide a complete proposal may be grounds for elimination. Proposals shall consist of three (3) separate volumes:
Volume I – Price, Volume II – Past Performance Volume III – Contract Documentation.
Proposals shall be complete, clearly presented, and include sufficient detail for effective evaluation as detailed in Section M of this solicitation and for substantiating validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but rather provide convincing rationale to address how the Offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of the Offeror’s facilities and/or experience and will rely heavily on the information presented in the Offeror's proposal. Proposals shall be neat, indexed (cross-indexed as appropriate), and assembled in an orderly manner. Elaborate artwork and expensive visual and other presentation aids are neither necessary nor desired. Include only information that is relevant to this source selection.
2.1 Proposal Submission: Offerors are responsible for submitting proposals to reach the Government POCs identified in paragraph 1.4 above by the time specified in this solicitation; only electronic proposals will be required (no hard copies - uploads, CDs, or DVDs only). Email submissions of proposals SHALL NOT BE accepted.
The electronic copy will be submitted using the Solicitation tool in the Procurement Integrated Enterprise Environment (PIEE) website https://piee.eb.mil. Offerors are cautioned to upload files to the Solicitation Tool with plenty of time to ensure upload of files and submission is accomplished before the due date and time. Proposals will be deemed to be timely if the timestamp in the Solicitation Tool is NLT the proposal due date and time.
The electronic copies of the proposal shall be submitted in a format readable by portable document format (PDF), Microsoft (MS) Office Word 97-2003, 2010, or 2016, MS Office Excel 97-2003, 2010, or 2016, and MS Office Power Point 97-2003, 2010, or 2016, as applicable. Do not embed files into the proposal documents. Embedded files will not be evaluated.
Title of the documents should state the corresponding proposal volume/title and include the Offeror’s CAGE code (i.e. “Vol 1 Price for XXXXX). *Note – “XXXXX” refers to the Offeror’s CAGE Code
Any proposal, bond, amendment, or revision that is received at the designated Government Office after the exact time specified for receipt of proposals will be “late” and will not be considered unless the Contracting Officer determines the criteria set forth in FAR 15.208 exists.
SECTION L
2.2 Format and Content: Each of the volumes specified in Section L shall be prepared as a single volume. A cover sheet should be included in each electronic volume and should be clearly marked as to volume number, title, copy number, solicitation identification, and the Offeror's name. To the greatest extent possible, each volume shall be written on a stand-alone basis so that its contents may be evaluated with a minimum of cross-referencing to other volumes of the proposal. Cross-referencing within a proposal volume is permitted where its use would conserve space without impairing clarity.
2.3 Page Size, Format, and Limit: The proposals will be on 8 1/2” x 11” pages. Legible tables, charts, graphs, and figures shall be used wherever practical to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11” x 17”. Typeface shall not be less than 12-point, with 1” margins on all sides. Smaller, legible font size, no smaller than 6-point, may be used for charts and tables.
A page is defined as one face of a sheet of paper containing information. This includes all appendices, charts, graphs, diagrams, tables, photographs, etc., unless placed on 11” x 17” sheets, in which case they will be counted as two (2) pages. All pages of each part shall be appropriately numbered and identified with the Request for Proposal (RFP) number (FA2823-23-R-0008). Page limitations (shown below) shall be treated as maximums. The page should be a standard “white page” format so that when printed the output page background is “white”.
2.4 Indexing: Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections. Indexing is not included in the page limitations.
Covers for volumes, tables of contents, indices, title pages, cross reference indices, and section dividers/tables will not be included in the page count if they are inserted solely to provide ease to the reader in locating volumes/sections of the proposal. They will be counted if they contain any other information, (e.g. diagrams, extraneous data, etc.). Pages marked “This page intentionally left blank” will not be counted. Pages in excess of the page count stated in the table below will not be evaluated. An electronic page is defined as each face of an 8 ½” X 11” electronic sheet of paper containing information.
Page limits apply to all electronic files and resulting printed output files, as applicable.
Volume Volume Title Copies
(Electronic) Page Limit
I Price
50 Division Excel Worksheet (L1) Any Pricing Justification Financial Questionnaire (L2)
One (1) Electronic
No Limit
II Past Performance
Past Performance Information (L3) Past Performance Questionnaires (L5) Consent Form (L4)
One (1) Electronic
20 pages total for Past Performance Information Sheets, 4 Pages per Information Sheet No limit for Consent Forms or Past Performance Questionnaires
SECTION L
III Contract Documentation One (1) Electronic
No Limit
3.0 VOLUME I – PRICE PROPOSAL - Submit one (1) electronic copy.
3.1 General Instructions: The Offeror’s Cost/Price proposal shall fully and clearly demonstrate reasonableness, balanced pricing, as well as document the Total Evaluated Price (TEP). The TEP will be the sum total of all Firm-Fixed Priced CLIN(s) and options (if applicable).
3.1.1 Reasonableness: This section is to assist you in submitting other than certified cost or pricing data that are required to evaluate the reasonableness of your proposed cost/price. Compliance with these requirements is mandatory and failure to comply may result in rejection of your proposal. The burden of proof for credibility of proposed costs/prices rests with the Offeror.
3.1.2 Materially Unbalanced Pricing: Materially unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an Offeror’s proposal. Materially unbalanced pricing exists when, despite an acceptable TEP, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. Offerors should explain significant fluctuations between offered rates/hours in the same labor categories over various years.
3.1.3 Price Realism: Note that unrealistically low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the Offeror does not understand the requirement or has made an unrealistic proposal. The Offeror’s proposal should be sufficiently detailed to demonstrate realism. price realism analysis will consist of independently reviewing and evaluating specific elements of each Offeror’s proposed 50 Division Cost Estimate (DCE) worksheet(s) to determine whether the estimated proposed elements are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the unique methods of performance described in the offeror’s technical proposal in accordance with FAR 15.404-1(d)(1).
3.1.4 Cost/Price Information: Data beyond that required by this instruction shall not be submitted, unless the Offeror considers it essential to document or support their cost/price position. All data relating to the proposed price, including all required supporting documentation, must be included in the section of the proposal designated as the Cost/Price Volume. Additionally, although adequate price competition is expected, if only one offer is received in response to this solicitation the responding Offeror will be required to provide certified cost or pricing data in accordance with Table 15-2, at FAR 15.408.
3.1.5 Rounding: All calculated monetary amounts provided shall be rounded to the nearest cent.
3.1.6 Volume Organization: The Cost/Price Volume shall consist of the following sections:
SECTION L
3.1.6.1 50 Division Cost Estimate (DCE) Worksheet (Attachment L1): Offerors shall provide a price breakdown for the project utilizing the 50 Division Cost Estimate (DCE) Worksheet (Attachment L1) for each CLIN as well as a summary page. Use and submit the 50 Division Cost Estimate (DCE) Worksheet (Attachment L1) to build your proposal. Offerors shall input the major work elements by specification division and provide pricing for those major work elements within each division sheet.
Offer will be complete, accurate, and sufficiently detailed to demonstrate a clear understanding of the requirement including providing sufficient details in the Division Cost Worksheet regarding quantities for material, labor, and other services. Offerors should not utilize lump sum or total pricing when pricing each specification division. Failure to breakout major work elements within a specification division may result in an unfavorable evaluation. If utilizing lump sum or total pricing when pricing the specific division, Offerors should provide rationale on why the price cannot be broken out. The burden of proof for credibility of proposed pricing rests with the Offeror.
3.1.6.2 Financial Responsibility Questionnaire (Attachment L2): Offerors shall submit the fully executed Financial Responsibility Questionnaire (Attachment L2) provided back from their financial institution.
4.0 VOLUME II – PAST PERFORMANCE - Submit one (1) electronic copy.
4.1 Recency and Relevancy of Past Performance Information
Offerors shall complete Attachment L3 “Past Performance Information,” on contracts and/or task orders you consider most recent and most relevant in demonstrating your ability to perform the proposed effort. Attachment L3 is limited to 4 pages per Information Sheet. Offerors shall only submit contracts for evaluation that are both recent and relevant. You may submit up to five (5) Past Performance Information sheets identifying active or completed contracts and/or task orders, either Government or commercial, for prime, teaming partner, and/or joint venture partner (within the same division or cost center) and you may also submit up to five (5) Performance Information Sheets for each subservice provider.
Recent past performance is defined as projects that have been completed within the last five (5) years (from the date of issuance on this solicitation). In lieu of a complete project, the Offeror may submit projects that are ongoing as long as, (a) the project is at least 80% complete by this solicitation’s issuance date, and (b) the Offeror can validate completion percentage with a government approved progress report. For commercial contracts, an equivalent customer validation of progress completion report (signed) may be used in lieu of a government approved progress report.
Relevant Contract is a contract that meets the definitions for one of the Relevancy Factors as set forth in Section M, Table M2
If past performance information is submitted under an Indefinite Delivery/Indefinite Quantity (IDIQ), the service provider must identify the delivery/task order relevant to this effort. Use one Past Performance Information Sheet for each delivery/task order cited. If submitting a Past Performance Information Sheet for the entire IDIQ effort the Offeror must identify the delivery/task order relevant to this effort. Offerors are cautioned that the Government will use data provided by each Offeror in this volume and data obtained from other sources in the evaluation of past and present performance.
SECTION L
4.2 Teaming Arrangements/Joint Ventures: If the Offeror intends to submit past performance information of a teaming arrangement member or a joint venture partner, then the Offeror shall provide sufficient information to clearly convey the roles and responsibilities that each member or partner performed. Past Performance information of team members or joint venture partners shall be consistent with the proposed roles and responsibilities that each member or partner will perform for this requirement. Identify each member's share of the prospective contract, 50/50, 51/49, etc. Clearly establish roles of each party (who is prime and who is subcontractor, who is responsible for what tasks, contract administration, proposals, work management, etc.). Provide for protection of competition-sensitive proprietary information (subcontractor past performance cannot be disclosed to the prime Offeror without the subcontractor’s consent). Provide a letter from all subcontractors (Attachment L5) that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime Contractor, only if it is being used as part of the past performance evaluation. If a under a teaming arrangement, include a Statement of Assurance that the team member will not be replaced for the duration of the contract, and any exceptions should be identified. The Prime Contractor is obligated to negotiate in good faith and is responsible for conveying mandatory Government terms and conditions to subcontractors. The prime Contractor shall remain fully responsible for contract performance, regardless of any teaming agreement between the prime Contractor and its subcontractors.
4.3 Organizational Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of two recent past efforts and this source selection. To facilitate the Government’s relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. A pamphlet or other commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the Offeror(s), your "roadmap" shall be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
4.4 Questionnaires: The submissions to the following sub-paragraphs do NOT count towards the page limit for the Offeror’s Past Performance Volume.
4.4.1 Questionnaire Submissions: For each Attachment L3 submission, the Government requires the Offeror to send out the Past Performance Customer Questionnaire, (Attachments L5) to each of the Government or Commercial Points of Contact. Existing CPARS or previously completed PPQs will be accepted in lieu of Past Performance Questionnaire (L5) forms.
ONE (1) COPY OF THE COMPLETED QUESTIONNAIRES SHALL BE SUBMITTED
DIRECTLY TO EITHER OF THE POINTS OF CONTACT IDENTIFIED IN PARAGRAPH
1.4 NOT LATER THAN THE DATE PROPOSALS ARE DUE AND ONE (1) COPY WILL
BE SUBMITTED WITH YOUR PROPOSAL
Additional information may be obtained by the Past Performance Team by direct contact through
SECTION L
the Contracting Officer.
While the Government may elect to consider data obtained from other sources, the burden of providing adequate, factual data to determine performance confidence rests with the Offeror. The Government does not assume the duty to search for data to cure problems it finds in proposals.
Proposals that do not contain the required information are subject to rejection by the Government.
The Offeror shall provide a summary of all prime Offeror and subservice provider/team member performance history submissions, in columnar format, with the following information: Service Provider Name, Contract Number, Performance Period, CO Name/Phone Number, Contracting Officer Representative Name/Phone Number. Completed questionnaires that are submitted by the respondents and copies of the respondents provide with the Offeror proposal shall not count against any page limitations established for this volume.
Each of the Offeror’s identified Government POCs can either send an encrypted email with the completed Past Performance Customer Questionnaire directly donovan.wall.1@us.af.mil, and francisco.arredondo.4@us.af.mil Attention: Donovan Wall and Francisco Arredondo. Please mark the subject line as Source Selection Information - See FAR 2.101 and 3.104
5.0 VOLUME III – CONTRACT DOCUMENTATION: - Submit one (1) electronic copy.
The purpose of this volume is to provide information to the Government for preparing the contract document and supporting file. The volume shall be prepared in the following format and contain the following contract files. The Offeror's proposal shall include a signed copy of the Solicitation and Sections A through K with applicable information within each section properly filled in by the Offeror.
Cover Page: Offeror shall provide a cover page containing the company/division CAGE code, Unique Entity ID number (UEI), TIN, business size, small business category, and the name, title, telephone number, and e-mail address of the Point of Contact.
Section A: Complete blocks 14 through 20c of the SF 1442. These sections constitute the model contract.
An authorized official of the firm submitting the offer must sign and date the SF 1442 in block 20a-c. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP, Sections A through M.
Section B: Offerors are required to complete this section
Section C – H: Offerors are not required to complete these sections.
Section I: Complete the Offeror supplied fill-in information for applicable clauses. All Offerors submitting a proposal to this solicitation shall comply with FAR 52.204-7 System for Award Management. Should the awardee not be located within the registry, the Contractor may be deemed unawardable.
Section K: Complete the representations and certifications in Section K or the System for Award Management (SAM).
SECTION L
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors.
5.1 Exceptions to the Solicitation: Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors shall provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. As award without discussions is contemplated, Offerors are cautioned that if the Government does not agree with the Offeror’s exception to the solicitation, the Offeror could be deemed non-responsive and therefore unawardable. This information shall be provided in the format and content of the following table.
Reference Page/Paragraph Requirement/Portion Rationale
SOW, SPEC,
Model Contract, etc.
Applicable Page and Paragraph Numbers
Identify the requirement or portion to which exception is taken
Describe why the requirement can/will not be met
Provide the following required information:
5.2 Authorized Offeror Personnel: Offeror shall provide the name, title, telephone number, and e-mail address of the company/division Point of Contact regarding decisions made with respect to the Offeror’s proposal and who can obligate the Offeror contractually. Offerors shall also identify those individuals authorized to negotiate with the Government.
5.3 Company/Division Address, Identifying Codes, and Applicable Designations: Offerors shall provide the company/division's street address, county and facility code; CAGE code; Unique Entity ID number (UEI); TIN; size of business (large or small). This same information must be provided if the work for this contract will be performed at any other location(s). List all locations where work is to be performed and indicate whether such facility is a division, affiliate, or subcontractor, and the percentage of work to be performed at each location.
SECTION L ATTACHMENTS:
1. 50 Divisions Cost Estimate Worksheet (L1)
2. Financial Responsibility Questionnaire (L2)
3. Past Performance Information (L3)
4. Consent Form(L4)
5. Past Performance Customer Questionnaire (L5)
6. Example Release Cover letter (L6)
File details come from the government source that posted it. Updated .