TRD 8 Dec 20.pdf
PDF 100 KB Posted
- Attached to
- VTC Upgrade Federal contract opportunity
- Solicitation number
- FA2823-21-Q-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs 15 Dec 20.pdf | ||
| MBRceilingback.jpg | JPG image | |
| MBRceiling1.jpg | JPG image | |
| MBRceilingback2.jpg | JPG image | |
| MBRceilingback1.jpg | JPG image | |
| RFIs 10 Dec 20.pdf | ||
| RFIs as of 8 Dec 20.pdf | ||
| Reps and Certs.docx | DOCX document | |
| Desk.jpg | JPG image | |
| MBR_drop ceiling.jpg | JPG image | |
| MBR_room.jpg | JPG image | |
| desk1.jpg | JPG image | |
| MBR_speaker.jpg | JPG image | |
| 96_CS Design_Guide Feb_2020.pdf | ||
| Briefing Area.pptx | PPTX presentation | |
| FA2823-21-Q-0003.pdf | ||
| TRD 23 Nov 20.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VTC UPGRADE
TECHNICAL REQUIREMENT DOCUMENT
08 December 2020
REQUIREMENT
1. Projector (Qty of 2):
a. signal resolution: 1920 x 1200 or higher
b. high level of brightness of 6,500- lumen or higher
c. Dimensions (W x H x D) 18.1 x 6.7 x 20.3" / 460.0 x 169.0 x 515.0 mm Approximately
d. Weight 34.00 lb / 15.42 kg Approximately
e. Input / output RGB, DVI, HDMI, RJ45, HDBaseT interface connector: RJ45, 4 play (Video, Audio, LAN, Control)
f. Projector needs to have networked control and monitoring that can be accessed at presenter’s desk.
g. Projectors must be commercial grade TAA compliant equipment.
2. Ceiling projector mounts (Qty of 2)
3. Control system touch screen, 7in" without camera or mic at presenter desk
4. Amplifier
5. Microphone
6. Speakers (Qty of 8)
- None of the equipment can have WiFi or Bluetooth.
- Operational materials (O&M Manuals) must be provided.
- The main briefing room upgrade needs to be compatible with 96 CS infrastructure and be in accordance with the 96 CS Design Guide dated February 2020.
EXISTING CONDITIONS
The current Government owned items that are in place and need to be compatible with any items acquired under this requirement are: Panasonic Desktop Editor- audio equipment; Apollo- projector screen and HP EliteDesk 800 G2- desktop.
INSTALLATION
- Uninstall existing equipment (mounted JQA projector, monitors, applicable equipment in rack such as Bogden amplifier, and any unnecessary cable); turn over existing equipment to Government POC. There are 8 speakers in the ceilings currently.
- Onsite installation of equipment
- Includes all materials (mounting brackets, cables, connectors, hardware, etc). Adequately mount all equipment to include any required reinforcement to ensure sound, stable installation
WARRANTY
- Minimum One year (12 months), from date of acceptance
- Parts, labor and travel
- Troubleshooting
- Required response time during warranty period to address maintenance requests:
Systems is partially capable, such as 1 of 3 monitors is inoperable: 7-14 calendar days
System is completely inoperable, such as all monitors, projector and/or touch panel control do not work: 3 business days
- Live telephone support 24x7 during warranty period
File details come from the government source that posted it. Updated .