Instructions_for_Quotes.doc
DOC document 22 KB Posted
- Attached to
- Blast Booth and Media Blasting Cabinet
- Solicitation number
- FA2823-18-Q-0104
About this file
Please break down quotes by individual costs. All costs (i.e., support equipment, installation) associated with the blast room is requested to be separated from all costs associated with the blast cabinets.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1401.tif | TIF image | |
| UFC_3-600-01.pdf | ||
| 1386.tif | TIF image | |
| Questions_with_MXS_answers_FINAL.doc | DOC document | |
| Questions_with_MXS_answers.doc | DOC document | |
| ADDENDUM_TO_FAR_52.212-2,_EVALUATION--COMMERCIAL_ITEMS_(OCT_2014).docx | DOCX document | |
| SOO_7_July_18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
***Instructions for Quotes***
Please break down quotes by individual costs. All costs (i.e., support equipment, installation) associated with the blast room is requested to be separated from all costs associated with the blast cabinets.
File details come from the government source that posted it.