ATT_2-Increased_Quantity_Option_Pricing.pdf

PDF 19 KB Posted

Attached to
Washer, Dryer Lease and Maintenance Federal contract opportunity
Solicitation number
FA2823-17-Q-4014
Issued by
Department of the Air Force Materiel Command Test Center

About this file

"Worksheet" for pricing increased quantity option.

View the file

Other files for this federal contract opportunity

Other files attached to Washer, Dryer Lease and Maintenance, newest first.
File Type Posted
Draft_PWS_Updated_21_July_17.pdf PDF
ATT_2-Addendums_52.212-1_Updated_21_July_17.pdf PDF
Washer_Dryer_Combo_Synopsis_Updated_21_July_17.pdf PDF
Wage_Determination.pdf PDF
Q&A_Amendment_2.pdf PDF
Draft_PWS_Updated.pdf PDF
Q&A_Amendment_1.pdf PDF
ATT_4-Combined_Wage_Determinations.pdf PDF
ATT_1-Draft_PWS_Lease_Washer_and_Dryer.pdf PDF
Washer_Dryer_Combo_Synopsis_CO_Reviewed_Final.pdf PDF
ATT_3-Final_Addendums_52.212-1.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

Anticipated Future Requirement/Option for Increased Quantity

*Increased Quantity Option Pricing, will be incorporated into the resulting contract as a supplement to the Pricing Table in Attachment 3, Addendum to FAR 52.212-1, Instructions to

Offerors.

Increased Quantity Option CLIN (0003) for the ‘future requirement’ will not include pricing in the SF 1449 Continuation Sheet unless one of these CLINs are exercised. The Government may exercise option CLIN 0003 for increased quantity at any time during the life of this contract. The modification exercising the option will add the proposed price provided with the offer as Attachment 2, Increased Quantity Option Pricing. Increased Quantity Option CLINs (0003) will correlate to the period in which they are exercised. For example, if the Government exercises these CLINs during option period two (2003), then the price in the CLINs for the remaining periods (3003, 4003, 5003) will be also be included at that time.

Period of Performance

CLIN Description Quantity Unit Price

Base Period-

8/6/2017-8/5/2018

0003 IAW the Performance Work Statement (PWS), dated June 12, 2017), Attachment 1, the contractor shall perform and provide leasing, installation, removal and maintenance of 60 stackable washer/dryer machines.

12 Months $

Option Year 1-

8/6/2018-8/5/2019

1003 IAW the PWS, dated June 12, 2017, Attachment 1, the contractor shall perform and provide leasing, installation, removal and maintenance of 60 stackable washer/dryer machines.

12 Months $

Option Year 2-

8/6/2019-8/5/2020

2003 IAW the PWS, dated June 12, 2017, Attachment 1, the contractor shall perform and provide leasing, installation, removal and

Option Year 3-

8/6/2020-8/5/2021

3003 IAW the PWS, dated June 12, 2017, Attachment 1, the contractor shall perform and provide leasing, installation, removal and maintenance of 60 stackable washer/dryer machines.

Performance Work Statement (PWS), dated 12 June 2017.

Option Year 4-

8/6/2021- 08/5/2022

4003 IAW the PWS, dated June 12, 2017, Attachment 1, the contractor shall perform and provide leasing, installation, removal and

Option to Extend Services (FAR 52.217-8)-

8/6/2022-2/6/2023

5003 IAW the PWS, dated June 12, 2017, Attachment 1, the contractor shall perform and provide leasing, installation, removal and

6 Months $

File details come from the government source that posted it. Updated .