This document is a set of Questions and Answers related to a Request for Quotation (RFQ) for the purchase of three (3) X-Ray machines. The RFQ details the specifications and requirements for the X-Ray machines, including that they should be dual-view, able to run on 120V power, and potentially required to be on the TSA ACSTL list. The government will provide dumpsters for debris/packaging removal and a forklift to assist with unloading and loading. The hours of operation for installation/de-installation are 0730-1600 Monday through Friday, excluding holidays. Quotes are due by Thursday, May 16, 2024, 1300 hours MT and must include a CAGE code, UEI, point of contact information, estimated delivery date, and pricing valid for at least 30 days. This is a Firm-Fixed Price requirement and a total small business set-aside with a NAICS code of 334519 and a 600-employee size standard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

50 LRF X-Ray Machine Ques�ons and Answers

1. Is the equipment requested required to be listed on the TSA ACSTL? It is men�oned that that is used to iden�fy minimum requirements.

a. It is not required for the equipment to be on the TSA ACSTL list, we would prefer if the equipment procured was on the list. These machines on this list have been through tes�ng that deems them qualified for screening for hazards and poten�al threats.

2. Do you need any roller tables that would be added to the end of the Small and Medium tunnel X-ray machines? Or just the built-in conveyor?

a. The organiza�on will need power generated built in dual mode conveyer for both the small and medium x-ray machine.

b. Will the conveyers come with the 1-year warranty? Please note this informa�on on the proposals provided.

3. Please confirm that the small tunnel X-ray machine should be single view or Dual view? This is not listed in the specifica�ons, but TSA ACSTL systems are all Dual View.

a. We will need the small machine to be dual view.

4. Please confirm that the site will provide all electrical power required for the equipment?

(sufficient outlets and electrical infrastructure)? The men�oned 632DV200 machine is able to run on 120VAC power, although most units run on 230VAC power. If the site is setup for 120VAC, most large units, as specified, run on 240VAC.

a. The available electrical in the facility is 120 Volts AC and 15-20 amps.

5. Will debris/packaging need to be removed they the installers or will the government be able to dispose of packaging materials (plas�cs, pallets, wood, foam, etc.)

a. There are two dumpsters available for debris/packaging removal.

6. Will the men�oned forkli� and operator be able to assist with the unloading of new equipment and loading of old equipment onto the removal truck?

a. Yes, the organiza�ons forkli� operator will assist with the unloading of new equipment and loading of old. To not affect opera�ons, the organiza�on will require the vendor to coordinate at least 24-48 hours in advance. The weight of the equipment will be required in advance to ensure we have the proper forkli� available. We have a 4k forkli�.

7. Will the government be able to bring the machines from the delivery loca�ons to their final loca�ons for installa�on?

a. No

8. What are the hours of opera�on that the equipment can be installed/deinstalled?

a. The hours of opera�ons are 0730 – 1600 Monday thru Friday, excluding Holidays.

9. Can the equipment be deinstalled prior to the arrival of the new equipment? Or should deinstall/reinstall be done in an immediately consecu�ve basis once the new equipment is delivered?

a. The equipment can be deinstalled no more then 24 hour prior to the installa�on of the new machines. Due to the large number of parcels, packages and pallets received daily the organiza�on does not have the capacity to stop opera�on for more than 48 hours.

10. Could you please clarify which regulatory authority? Also, provide a copy of this if it is available.

a. Direc�ve: 107th Congress, Homeland Security Act of 2002 - Transporta�on Security Agency

(TSA)

Guidance: Screening shall be accomplished IAW accepted Government and/or commercial agency standards. Applicable Government agencies include, but are not limited to: Bureau of Alcohol, Tobacco & Firearms (BATF); Federal Avia�on Administra�on (FAA); Transporta�on Security Administra�on (TSA); Pentagon Force Protec�on Agency (PFPA); and 50th Space Wing (50 SW); commercial agencies include but are not limited to Explosives Countermeasures Interna�onal (ECI).

11. Is this solicita�on required to adhere to buy American?

a. Yes. Please provide quotes that adhere to buy American. If unable to do so, please provide pricing/reasoning why the equipment can not adhere to buy American. This requirement does also adhere to the non-manufacturer rule.