Wage determination.pdf

PDF 102 KB Posted

Attached to
HVAC Reconfiguration/upgrade Federal contract opportunity
Solicitation number
FA2550-10-R-1005
Issued by
Department of the Air Force Space Command

About this file

Wage determination

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Reconfiguration/upgrade, newest first.
File Type Posted
Site visit questions.pdf PDF
Site visit HVAC at Building 715-Answers to Questions.pdf PDF
Amendment0002.pdf PDF
Notice of Site Visit.pdf PDF
Amendment HVAC-Extension.pdf PDF
Amendment HVAC-Extension.pdf PDF
site visit cancellation.pdf PDF
Notice of Site Visit.pdf PDF
Notice of Site Visit.pdf PDF
Notice of Site Visit.pdf PDF
Statment of work.pdf PDF
solicitation.pdf PDF
All drawings.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL DECISION: CO20100006 03/12/2010 CO6

Date: March 12, 2010

General Decision Number: CO20100006 03/12/2010

Superseded General Decision Number: CO20080006

State: Colorado

Construction Type: Building

County: El Paso County in Colorado.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories).

Modification Number Publication Date

0 03/12/2010

BRCO0007-002 05/01/2009

Rates Fringes

BRICKLAYER.......................$ 22.32 9.53

CARP0001-003 05/01/2009

CARPENTER

(Including

Formbuilding/Formsetting)...$ 26.60 8.89

ELEC0113-001 06/01/2009

ELECTRICIAN

(Including Low Voltage

Wiring and Installation of

Fire Alarms, Computers, Telephones and Temperature

Controls)...................$ 28.80 3%+13.10

* ELEV0025-002 01/01/2010

Elevator Constructor.............$ 36.94 20.24

FOOTNOTE:

a. Employer contributes 8% of basic hourly rate for over 5 years' service and 6% basic hourly rate for 6 months' to 5 years' service as Vacation Pay Credit.

PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

Day; Labor Day; Veterans Day; Thanksgiving Day; Friday after Thanksgiving Day; and Christmas Day.

ENGI0009-005 05/01/2009

Power equipment operators:

Backhoe: 3/4 yd. and over...$ 23.82 9.22

Backhoe: Belt & Elevating...$ 24.12 9.22

Backhoe: under 3/4 yd.......$ 23.67 9.22

Crane: 50 tons and under...$ 23.82 9.22

Crane: 51 to 90 tons.......$ 23.97 9.22

Crane: 91 to 140 tons......$ 24.12 9.22

Crane: 141 tons and over....$ 24.88 9.22

Front End Loader: over 6 cubic yards.................$ 23.82 9.22

Front End Loader: up to and including 6 cy..........$ 23.67 9.22

Roller: self propelled, all types over 5 tons.......$ 23.67 9.22

Roller: self-propelled, rubber tires under 5 tons...$ 23.32 9.22

Scraper: single bowl including pups 40 cubic yards and over and tandem bowls.......................$ 23.97 9.22

Scraper: single bowl under

40 cubic yards..............$ 23.82 9.22

Trackhoe....................$ 23.82 9.22

Water Wagon.................$ 23.82 9.22

IRON0024-002 11/01/2009

Ironworker, reinforcing and structural.......................$ 24.80 9.91

LABO0720-001 05/01/2009

Laborers:

Common and Concrete/Mason

Tenders.....................$ 16.52 6.84

PAIN0930-001 07/01/2009

GLAZIER..........................$ 27.95 7.10

PLAS0577-001 05/01/2007

Cement Mason/Concrete Finisher...$ 23.80 8.25

PLUM0058-001 07/01/2009

PLUMBER/PIPEFITTER

(Including HVAC pipe) &

(Excluding HVAC work).......$ 28.55 11.45

* ROOF0058-001 05/01/2009

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 20.55 5.08

SHEE0009-001 07/01/2009

Sheet metal worker

(Includes HVAC duct and installation of HVAC systems)....................$ 30.55 11.67

SUCO2001-007 12/20/2001

Carpenters:

Acoustical..................$ 15.02 .76

Drywall Framing/Hanging and Metal Stud Work.........$ 15.16 2.33

Drywall Finisher/Taper...........$ 14.42 .62

Mechanical Insulator/Asbestos

Worker

(Including application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 13.88

Painters:

Brush, Roller & Spray.......$ 11.29 3.11

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .