Site visit questions.pdf
PDF 88 KB Posted
- Attached to
- HVAC Reconfiguration/upgrade Federal contract opportunity
- Solicitation number
- FA2550-10-R-1005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site visit HVAC at Building 715-Answers to Questions.pdf | ||
| Amendment0002.pdf | ||
| Notice of Site Visit.pdf | ||
| Amendment HVAC-Extension.pdf | ||
| Amendment HVAC-Extension.pdf | ||
| site visit cancellation.pdf | ||
| Notice of Site Visit.pdf | ||
| Notice of Site Visit.pdf | ||
| Notice of Site Visit.pdf | ||
| solicitation.pdf | ||
| Wage determination.pdf | ||
| Statment of work.pdf | ||
| All drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site visit questions:
1. Will need to know who the Controls Contractor for the base is if They want the system tied into a front end system. Otherwise this building Would be quoted with stand alone controls.
[Yes, the controls contractor is HSQ. Ken Carrick email = Kenneth.carrick.ctr@schriever.af.mil .NJG]
We propose completing scope of work in phases similar to phasing show on the as build drawings.
[These drawings were given for reference only. The construction of the project is a Means and Method responsibility of the Contractor. NJG]
1. Can the occupants on the North side of the building be relocated temporarily to the South side of the building to allow for uninterrupted construction to occur? (phase I)
1A). [This will have to be coordinated with the Government Project Inspector after project is awarded. NJG]
2. At the completion of phase I can all the occupants be relocated from the South side of the building to the North side of the building to allow uninterrupted construction to occur? (phase II)
2A). [This will have to be coordinated with the Government Project Inspector
3. If phasing and relocation of occupants will not be allowed, would after hours shift work be allowed with the accompaniment of escorts? If so will the government provide the escorts?
2A). [This will have to be coordinated with the Government Project Inspector after project is awarded. The Government will not provide escorts. NJG]
4. If occupants will not be relocated out of the construction area who will be liable for the potential damage of occupants possessions?
4A). [This will have to be coordinated with the Government Project Inspector
5. If occupants will not be relocated out of the construction area who will be responsible for daily cleaning and make safe provisions?
5A). [The project Contractor will be liable for daily cleaning and make safe provisions. NJG] mailto:Kenneth.carrick.ctr@schriever.af.mil
Upon review the specifications do not indicate whether this system will need to be installed according to the new ATFP standards. Could you clarify if we need to meet the current standards?
Answer = [Yes, the installation will have to meet the ATFP standards. NJG]
The scanned drawings were stored to a small sheet size which prevents discerning the detail. Is a "Full sheet scan" available for the project?
Answer = [I believe the drawings were in PDF format which allows the user to print off any size plot at their discretion. The drawings provided were for reference only. NJG]
File details come from the government source that posted it. Updated .