SOW - Trane Chiller Servicing - April 2026.pdf

PDF 830 KB Posted

Attached to
RFQ - Trane Chiller Servicing
Solicitation number
FA254326Q0026
Issued by

About this file

This is a Statement of Work (SOW) for B442 TRANE Chiller Proprietary Software Updates and Technical Diagnostic Support located at 606 S. Aspen Street, Buckley Space Force Base, Colorado 80011, dated April 2026.

The contractor shall provide fully qualified technicians and specialized tools to inspect and recommission two (2) 120-ton air-cooled Trane chillers (Model # CGAM120F) installed in 2012. Primary work includes updating chiller software to the current version, performing complete annual inspections, and recommending further service as needed. Specific tasks include reviewing manufacturer installation and operation manuals, updating software on both units, re-programming chillers, calibrating sensors and actuators, verifying thermostatic expansion valves (TXVs) are operating correctly, adjusting settings to optimize performance, performing post-update inspections, verifying unit communication and functionality, conducting comprehensive annual inspections for leaks and damage, performing operational and system safety checks, and identifying components requiring further repair. Upon completion, the contractor must deliver a deficiency report detailing any compromised components or units requiring additional attention; if full system replacement is recommended, a separate detailed report with clear justification must be provided.

The contractor is responsible for providing all qualified labor, materials, and specialized equipment required for recommissioning. All technicians must be certified and licensed to service commercial water chillers per manufacturer specifications, building chilled water system design, state and local codes, and UFC 3-410-01 standards. Technicians must possess specialized certification and experience with the specific Trane Model # CGAM120F units. No cell phones, cameras, recording devices, or Bluetooth-enabled devices are permitted in the Restricted Area without prior approval; the contractor must provide device information to the Contracting Officer for waiver processing. All services must be completed within 30 days of award, with a final report submitted containing detailed information on the software upgrade, operational and safety checks performed, and any unit deficiencies discovered.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

STAEMENT OF WORK

FOR

B442 TRANE Chiller Proprietary Software Updates and Technical Diagnostic Support

606 S. ASPEN ST.

BUCKLEY SFB, COLORADO

80011

April 2026

1.0 Scope of Work

1.1 Primary Objective

The Contractor shall provide fully qualified technicians and all specialized tools to inspect and recommissioning two (2) 200 Ton Air-Cooled Scroll Chillers that were installed in 2012. The contractor shall update all chiller software from to the current version, perform a complete annual inspection, and recommend further service as needed on the following equipment.

• (2) 120 Ton Air-Cooled Trane Chillers Model # CGAM120F

1.2 Software upgrade and chiller recommissioning

The contractor shall thoroughly review all equipment’s manufacturer Installation and Operation manuals in their entirety prior to beginning any work. After reviewing all manuals, the contractor will:

• Update any necessary software on both Chillers.

• Re-program both chillers.

• Calibrate chiller sensors and actuators to ensure proper operation.

• Verify TXVs are operating correctly.

• Adjust chiller settings and parameters to optimize performance.

• Perform inspection of Chiller after software has been updated.

• Verify unit communication / functionality.

• Perform a complete annual inspection, including checking for leaks and damage to equipment.

• Perform operational check and system safety checks after work is completed.

• Identify any components requiring further repair and recommission all three Chillers.

1.3 Deficiency Reporting

Upon completion of the re-commissioning, the contractor will deliver a deficiency report detailing any compromised components or units requiring further attention. If additional work or a full system replacement is recommended, the contractor must provide a separate, detailed report with clear justification for the recommendation.

1.4 Contractor-Furnished Items

The contractor is responsible for providing all necessary qualified labor, materials and equipment, including but not limited to:

• Tools and specialized equipment needed to recommission chillers.

2.0 Governing Standards

All work shall be performed in strict accordance with the manufacturer's specifications, building chilled water system design, and the latest editions of the following codes and standards:

• All applicable state and local laws/codes

• UFC 3-410-01: Heating, Ventilating, and Air Conditioning Systems. UFC criteria can be found at the Whole Building Design Guide at the following link:

https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc.

3.0 Technical & Compliance Requirements

3.1 Definition of Qualified Labor

The contractor must ensure all technicians are certified and licensed to service and repair commercial water chillers in accordance with the standards listed in Section 2.0. Furthermore, all technicians must possess specialized certification and experience with the following specific equipment models:

• (2) 120 Ton Air-Cooled Trane Chillers Model # CGAM120F

3.2 Electronic Device Use in Restricted Area

*NOTE* No cell phones, cameras, recording devices, or any other type of Bluetooth-enabled devices are allowed into the Restricted Area (RA). If photographs are required, the Contractor can coordinate with the Civil Engineer Project Manager (PM) to have photographs taken in an approved manner. If unsure of what electronic devices are allowed in the RA the Contractor shall provide the CO or COR the following information for approval prior to bringing the device into the RA: device make, model, serial number, year, and purpose of device. This is required to ensure contractor equipment is tracked and can be allowed through the gate. This is required upon award to ensure waivers for contractor equipment are processed and can be allowed through into the RA.

4.0 Reporting & Deliverables

Upon project completion, the contractor shall submit a final report containing the following detailed information:

• A detailed report of the software upgrade.

• A summary of all operational and safety checks performed.

• A detailed summary of any unit deficiencies discovered during re-commissioning.

• All services shall be received 30 days after award.

https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc

ATTACHMENTS:

Attachment 1: Unit

Attachment 2: Unit data plate photo

Attachment 3: Unit data plate photo

File details come from the government source that posted it. Updated .