This document outlines a federal solicitation for renovating Building 402 and demolishing Building 561 at Patrick Space Force Base. The scope of work includes repairing and renovating Building 402 to update all building systems, finishes, lighting, HVAC, restrooms, break room and administrative areas. It also requires demolishing Building 561. All work must meet the current Florida Building Code and the 45th Space Wing Installation Facilities Standard. Questions are due by April 26th and proposals are due by May 11th. A mandatory site visit will be held on April 24th for interested contractors to attend.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA252123B0001

Repair Building 402, 45 SW-JA Relocation (SXHT 12-1042) Patrick AFB, FL

Question and Answer Template

Contractor Name: __Maverick Constructors, LLC___

POC: __Ralph Kennedy_______________________

IFP Section __________ Paragraph _________

Tech Spec Paragraph 01 45 00.00 10, Para. 3.4.2_& 3.4.3___________

Other (Specify) ___________________________

1. Question: ___ A CQC System Manager, with a Engineering degree, Architectural Degree, or a Construction Management Degree, with 10 years related experience doesn’t exist in this area, we have looked the previous times this project bid. Additionally, the other members of the CQC staff as required by Para. 3.4.3 and the experience matrix will add considerable cost especially when you consider the size of this project. Can a CQM with a COE/ NAVFAC Quality Control Management Certification be substituted? __ _____

Review with Brad/Mik

Attachment 10

1539937967C Text Box No, specs are to be followed as written.

TJS-Herman JV LLC

Katie Hammock parking lot and show all utilities (sewer tie-ins and laterals, water tie-ins and laterals, HVAC water supply gate valves and main building supply shutoff gate valves).

Repair Building 402, 45 SW-JA Relocation (SXHT 12-1042) Patrick AFB, FL

Question and Answer Template

Contractor Name: _____________________________

POC: ______________________________________

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

2. Question: Please provide the demolition plan for Building B______________________________________________________________________________561 to include limits of work within the

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

3. Question: Confirm if asbestos abatement is required for de______________________________________________________________________________molition. Specifications conflict whether there is asbestos abatement required or not. There is <______________________________________________________________________________1% over the entire building.

This was provided in the RFP package

If this question is in reference to B561 demo then refer to Sheet H-001 for information.

Attachment 10 lead time delays, in nearly all commodities that cannot be anticipated. Subcontractors are receiving unforeseen increases in material delivery durations from their suppliers. How is the Government going to accommodate the current extended lead times and material manufacturing and delivery delays that are occurring in the construction industry?

The construction industry continues to experience significant cost volatility in nearly all commodities that cannot be anticipated. Subcontractors are receiving unforeseen increases in material costs from their suppliers, sometimes on a weekly basis, that can be as high as 10% or more. How is the Government going to accommodate the current price escalation being experienced in the marketplace with regards to commodities such as wood, steel, plastics, etc.?

Can an Equitable Price Adjustment (EPA) per contract length as one of the Defense FAR Supplement (DFARS) 216.203-4(1)(ii) clause be added to the RFP?

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

4. Question: The construction industry continues to experien______________________________________________________________________________ce significant volatility, resulting in material

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

5. Question: We understand that the Government intends to a______________________________________________________________________________ward a lump sum contract for this Task Order.

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

6. Question:

Supply chain/manufacturing delays will be considered in accordance with FAR 52.249-10 Default (Fixed-Price Construction)

This contract will be awarded as a firm-fixed priced contract. Volatility in material and equipment costs may be considered on a case-by-case basis in accordance with applicable Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement regarding contract adjustments.

Confirm that the Government will allow propos______________________________________________________________________________ers a minimum of seven (7) days to respond to the RFP starting from the date that the Governm______________________________________________________________________________ent responds to 100% of the RFIs received.

Confirmed________________________________

Specification 01 11 00.00, para 3.8.2 states that "The Quality Control Manager shall be a different individual than the project superintendent." Specification 01 45 00.00, para 3.4.2 states that "The CQC System Manager is assigned as CQC System Manager but has duties as project superintendent in addition to quality control." Clarify if the Superintendent and Quality Control Manager can be the same person.

3.8.2, 3.4.2

Provide firm and point of contact for the mechanical controls system.

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

7. Q uestion:

Tech Spec Paragraph __01 11 00.00_________ , 01 45 00.00

Other (Specify) ___________________________

8. Question:

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

9. Question:

IFP Section __________ Paragraph

The hazardous abatemea nt report provided as an ______________________________________________________________________________ppendix to the specifications is dated 2019. Will the Contractor bew required to perform a ______________________________________________________________________________hole and separate hazardous materials survey and report of the work area prior to demolition a______________________________________________________________________________ctivities?

HAZMAT and TCLP provided ___________________________________________as attachment 9.______________________

See Spec Section 01 11 00.00 30 Paragraphs 3.8.2 and 3.9

PSFB EMCS controls online systems. The CES PM and inspector will be liaison between contractor and EMCS as needed.

Provide firm and point of contact for the FAMNS.

Has a Limited Source Justification (FAR 6.302-1(c), 6.303) been prepared for any materials identified under this solicitation? If so, identify which systems to which they apply and provide all related documentation, including any required Approval (FAR 6.304) or

The Solicitation states, "c. ATTACHMENT 3: Bid Guarantee in accordance with FAR 52.228- 1 Bid Guarantee; electronic copies of bid guarantees will be accepted with bid package;

however, upon request of the government, original copies must be produced and submitted to the government in a timely fashion." (PDF page #48). Please confirm that there is not an attachment missing as Attachment 3 is the wage determination in this solicitation.

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

10. Question:

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

11. Question:

Certification (FAR 6.303(b)(12)). ______________________________________________________________________________

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

12. Question:

Same as above. As needed.

FAMN - Monaco EMCS Controls - Schneider Electric Carpet - Milliken Locks- BEST Coremax - Reference specifications page 370.

FAR 52.228-1 included in amended IFP.

- Reference Q&A Appendix A, MFG Waiver to use Milliken.

The Solicitation states, "c. ATTACHMENT 3: Bid Guarantee in accordance with FAR 52.228- 1 Bid Guarantee; electronic copies of bid guarantees will be accepted with bid package;

however, upon request of the government, original copies must be produced and submitted to the government in a timely fashion." (PDF page #48). Please confirm the amount of the bid guarantee by percent of bid price or dollar value.

purposes of this price only proposal submission, is it acceptable to the Government that the Contractors submit single, lump-sum values per CLIN?

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

13. Question:

CLINs be added together to determine the______________________________________________________________________________ total price?

Total evaluated price.

IFP Section __________ Paragraph _________

Tech Spec Paragraph _______________

Other (Specify) ___________________________

15. Question:

The CECC Form 3052 is more appropriate for modifications to an existing contract. For

Recommend you provide both lump sum as indicated in section L and Form 3052.

FAR 52.228-1 included in amended IFP.

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

14. Question:

The basis of award is listed as price only. For pr______________________________________________________________________________ice comparison purposes, will all base and option

Can the KTR reuse salvaged building components in the new buildout if they are in compliance with the RFP?

Provide as-builts for the building(s) and surrounding site (utilities).

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

16. Question:

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

17. Question:

Must be coordinated with CES for approval.

No, I don't even know what building this is for.

Repair Building 402, 45 SW-JA Relocation (SXHT 12-1042) Patrick AFB, FL

Question and Answer Template

Contractor Name: __GSI Construction Corporation, Inc.___________________________

POC: __Josh Owens – josh@GSIconstruct.com____________________________________

IFP Section _Solicitation L-4_________ Paragraph ____3.c._____

Tech Spec Paragraph ___________

Other (Specify) ___________________________

18. Question: ______The solicitation states that a bid guarantee is required, per FAR 52.228-1, but that FAR clause does not appear elsewhere withing the solicitation and would state the required percentage of the bid guarantee – can that percentage be provdied?

______________________________________________________________________ FAR

52.228-1 included in amended IFB____________________________

Patrick AFB, FL

Question and Answer Template

Contractor Name: _____________________________

POC: ______________________________________

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

19. Question:

20. Question:

___________Recommend showing FA/S/Data as a separate line item than Electrical_____________________

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) ___________________________

___Field verify after award.

Attachment 10

Ashley Cope Typewritten Text

REITER ELECTRIC, INC

Ashley Cope Typewritten Text Ashley Cope or Michael Reiter

Ashley Cope Typewritten Text Atch1Drawings

Ashley Cope Typewritten Text Do you want Fire/Security/Data included with the Electrical bid or are you requesting

Ashley Cope Typewritten Text those quotes individually from those trades?

Ashley Cope Typewritten Text Atch1Drawings

Ashley Cope Typewritten Text Equipment Plan - E102 does not show power requirements for A/C 1, 2 or 3. It shows on

Ashley Cope Typewritten Text the panel schedule but where does that feed - subpanel, distribution block, etc? Please

Ashley Cope Typewritten Text advise.

Patrick AFB, FL

Question and Answer Template

Contractor Name: ____Maverick Constructors, LLC_

POC: ___Ralph Kennedy______________________

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) __Demo Bldg. 561_________________________

21. Question: __Do you have the Asbestos Survey, Heavy Metals Survey, and _TCLP results for Bldg. 561?

____Reference attachment 9

IFP Section __________ Paragraph _________

Tech Spec Paragraph _02 83 00__________

Other (Specify) ___________________________

22. Question: __The specs call out for abating the lead paint in Bldg. 561. With wet demolition methods, typically abatement of the lead paint isn’t required, especially if the TCLP results show the paint is below hazardous levels. Will you consider amending the specs to delete the abatement of lead paint requirement as long as wet demolition methods are used?_________________________________________________________________________ Brian Ellis to answer________________________________________________________________

Attachment 10

1539937967C Text Box Refer to section 1.3. The LBP does not need to be "abated" prior to wet demolition, however, safe practices contained in this spec section shall be adhered to for both worker and environmental protections.

Repair Building 402, 45 SW-JA Relocation (SXHT 12-1042) Patrick AFB, FL

Question and Answer Template

Contractor Name: _Moran Construction Inc.____________________________

POC: __Patrick J. Moran, President____________________________________

IFP Section __________ Paragraph _________

Tech Spec Paragraph ___________

Other (Specify) __B561_________________________

23. Question: _____Please ask if the lead survey AND the follow-up TCLP results will be provided. Also, please ask if the requirements for lead will change based upon the TCLP results which show both interior and exterior material to be non-hazardous.

Reference attachment 9.____________________________

Patrick AFB, FL

Question and Answer Template

Contractor Name: Strategic Surfaces Inc.

POC: Jeff Judy – JeffJudy@StrategicSurfaces.com Cell # 407-764-3200

IFP Section :09 51 00 Acoustical Ceilings Paragraph: 2.2 Acoustical Ceiling Units

Tech Spec Paragraph: Basis-Of-Design - Armstrong “Woodworks Channeled Plank

Other (Specify) ___________________________

24. Question:

1) What Color Heavy Duty Suspension System will be used including Edge molding?

See section 2.2.1.1

2) Will Veneer Perforations be required or a Solid Plank? Perf Options (W7 / W8 /W9)

No perforations

3) If Perforations are required What is the required NRC For the Woodworks Channeled Plank Panel System. Poly encapsulated Insulation can be added to Achieve .65 -.80 NRC

N/A

4) Which direction will the Plank Panels be required to Run? Plan North - South or Plan East - West? Plan N-S mailto:JeffJudy@StrategicSurfaces.com

Waiver Control Number:

(Assigned by the 771 ESS)

Waiver Request for Exemption to the Mandatory Use Policy Air Force Program

Requestor Information

Request Date:

Requesting POC: POC Email:

Requesting Organization: Supporting Contracting Office:

Base: MAJCOM:

Requirement Description & Requested Source Information

Manufacturer:

Dealer Name:

Place of Manufacturer:

Cage Code:

Method of Purchase:

stimated cost (Total):

Description of Requirement:

Justification: (Explain why the will not meet requirement.)

Market Research: (Include analysis of proposed alternatives suitability in terms of Fit, Form, and Function)

Cost / Benefit Analysis: Describe and justify additional feature(s) and include the net cost difference (Calculated by subtracting the Mandatory Use item cost from the cost of the requested fulfillment source).

This form and decision response must be maintained in the file/record.

2023Q0201

14 Apr 2023

Kristine Snow Kristine.snow.1@spaceforce.mil

45 CES

Patrick Space Force Base

45 CONS

Space Systems Command

Milliken N/A N/A N/A

Other Blanket Waiver - All Projects PSFB & CCSFS

SLD 45/ Patrick SFB & Cape Canaveral SFS requires a carpet that can resist mold and moisture. Patrick SFB wants to use the Air Force Carpet program, but only select the Milliken brand because it meets our needs with regards to mold resistance.

Patrick SFB and Cape Canaveral SFS is located in an area with long periods of very high humidity. The open-cell backed carpeting with "TractionBack" backing wicks any moisture, from slab or humidity, up into the backing and out to the seams, and allows evaporation without trapping any moisture underneath to form mold (and glue is a food source for mold). Moisture barriers do not withstand over time and high relative humidity at times creates moisture issues, even on upper floors. There have been situations here where moisture was so excessive in the concrete slab that the glue did not hold and the carpet tiles lifted and slid, causing a safety hazard. All of the other carpets on the BPA have hard, closed-cell backing and has been used in the past and mold issues continue to be an issue. This has not been an issue since Milliken with "TractionBack" has been installed.

At this time there are no other manufacturers which provide this open-cell backing and means of adhering to the sub-floor without using glue. For the 25 years, since their carpet tile's introduction, Milliken Carpet has never had a moisture claim.

The products are comparatively, evenly priced. Milliken Carpet products are included in the Mandatory Use program.

APPENDIX AAttachment 10

The Waiver Requestor will sign first. Next, the local will endorse.

Requestor Signature:

Requestor Name:

Rank/Grade:

Phone:

Email:

CO

Signature:

Name:

Rank/Grade:

Phone:

Email:

FOR AFICC / CATEGORY LEAD USE ONLY

Waiver Control Number:

(Assigned by the 771 ESS)

Waiver Request for Exemption to the Mandatory Use Policy - Air Force

I recommend Choose an item. the requested waiver.

771 ESS Offic

Based upon the information provided in this request for exemption to the Mandatory Use Policy for the Air Force is hereby

Waiver Authority Signature:

Waiver Authority Name:

Rank/Grade:

Title:

2023Q0201

SNOW.KRISTINE.E.

1539937967

Digitally signed by

SNOW.KRISTINE.E.1539937967

Date: 2023.04.17 09:07:42 -04'00'

PALMER.NANCY.

R.1107795169

Digitally signed by

PALMER.NANCY.R.1107795169

Date: 2023.04.17 09:47:57 -04'00'

Kristine Snow NANCY R. PALMER

NH-03 NH-03

321-494-3668

Kristine.snow.1@spaceforce.mil nancy.palmer.2@spaceforce.mi 321-494-5235 approval of

KAISER.JACLYN.M

ARIE.1282380184

Digitally signed by

KAISER.JACLYN.MARIE.128238

Date: 2023.04.18 08:26:53 -04'00'

GUADARRAMA.DEN

NIS.S.1231026670

Digitally signed by

GUADARRAMA.DENNIS.S.1231

026670 Date: 2023.04.19 06:09:42 -05'00' approved.

The customer is correct that Milliken's offering is the only one of it's kind on the program. Their "breathable" carpet mitigates moisture from the top down and from the slab up.

APPENDIX AAttachment 10

23B0001 Question 4-13-23
Atch 5 - Q and A - TJS-Herman JV LLC
Atch 5 - Q&A - GSI No. 1
Atch5QandATemplate-combined
Bldg 561 Questions 4-25-23
MCI 4 25 23
1.
1.

File details come from the government source that posted it. Updated .