Atch 4 - SXHT 12-1042 GPP Cert Form.pdf
PDF 214 KB Posted
- Attached to
- Renovate B402/Demo B561, Patrick SFB Federal contract opportunity
- Solicitation number
- FA252123B0001
About this file
This document outlines requirements for a federal contract solicitation to renovate and demolish buildings at Patrick Space Force Base. The scope of work includes repairing and renovating Building 402 to update all building systems, finishes, lighting, HVAC, restrooms, and administrative areas. It also requires demolishing Building 561. Interested parties must attend a mandatory site visit on April 24, 2023 at 0900 hours to inspect the buildings. Contractors are limited to three attendees per firm and must submit personal information for attendees by April 18. All questions regarding the solicitation must be submitted using the provided template to the points of contact by April 26. Final proposals are due no later than May 11, 2023 at 1300 hours. The solicitation is being conducted by the Department of the Air Force Space Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23B0001 ABSTRACT OF OFFERS.pdf | ||
| Solicitation Amendment FA252123B00010002 SF 30.pdf | ||
| Atch 10 - SXHT 12-1042 Rpr 402 Demo 561 IFB QAs.pdf | ||
| Solicitation Amendment FA252123B00010001 SF 30.pdf | ||
| Atch 10 - SXHT 12-1042 Rpr 402 Demo 561 IFB QAs.pdf | ||
| Atch 9 - SXHT12-1042 B402 Add-On B561 Demo_Hazardous Materials Survey.pdf | ||
| Atch 3 - Wage Determination - FL20230001.pdf | ||
| Atch 7 - SXHT 12-1042 Hazardous Waste Form.pdf | ||
| Solicitation - FA252123B0001.pdf | ||
| Atch 8 - SXHT 12-1042 Rpr 402_Demo 561 - RulesofEngagement.pdf | ||
| Atch 6 -SXHT 12-1042 CECC Form 3052.xls | XLS spreadsheet | |
| Atch 2 - SXHT 12-1042 Specifications.pdf | ||
| Atch 5 - Q and A Template.docx | DOCX document | |
| Atch 1 - SXHT 12-1042 Drawings.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIRECTIONS FOR USE OF THE GREEN PURCHASING PROGRAM
CERTIFICATION AND EXEMPTION FORMS
45TH SPACE WING (AFSPC)
Patrick Air Force Base, FL 32925
12 August 2004 Revised 15 July 2005
ANNEX A TO 45 SW PLAN 32-7080
GREEN PURCHASING PROGRAM CERTIFICATION FORM
AND
GREEN PURCHASING PROGRAM
EPA CPG DESIGNATED ITEM PURCHASE EXEMPTION
FORM
PROJECT SXHT 12-1042
Repair B402 Courthouse and Demolish B561
DIRECTIONS FOR USE OF THE GREEN PURCHASING PROGRAM
CERTIFICATION AND EXEMPTION FORMS
Complete top of the Green Purchasing Program Certification (GPPC) Form and check mark all EPA-designated items applicable to this acquisition.
Complete the top of the GPPC Form
Check mark Box A on Part 1 of the GPPC
Form. Provide signatures/dates.
Were any EPA-designated items checked on the GPPC Form?
Yes
No
Yes
No Were all possible
EPA-designated items specified in the procurement action?
Check mark Box C on Part 1 of the GPPC
Form and complete the justification section.
Provide signatures/dates.
Check mark Box B on Part 1 of the GPPC Form.
Provide signatures/ dates.
Complete Part 2 of the GPPC Form
Were all EPA-designated items specified in the procurement action purchased?
No
Yes
Check mark Box A on Part 2 of the GPPC
Form. Provide signatures/dates.
Check mark Box B on Part 2 of the GPPC Form and complete the justification section. Provide signatures/dates.
Complete an Green Purchasing Program EPA CPG Designated Item Purchase
Exemption Form for each EPA-designated item for which an exemption has been claimed on Part 2 or 3 of the GPPC Form.
Place all forms in the Contracting Office contract/project file.
GREEN PURCHASING PROGRAM CERTIFICATION DETERMINATION
INSTRUCTIONS
This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products. This form is not required for construction item purchases less than $2,000, or for other purchases less than $2,500. The completed form becomes part of the contracting office contract file.
PROCUREMENT TITLE:
PROCUREMENT REQUEST NO.
PART 1: RECOVERED MATERIALS DETERMINATION
Part 1 shall be completed by the specifying authority when requesting a procurement action.
EPA-DESIGNATED ITEMS
(Place a check mark next to each product that applies to this procurement)
Construction Products:
Building insulation Polyester carpet Carpet Cushion
Cement & concrete containing:
Coal fly ash
Ground granulated blast furnace slag
Cenospheres Silica fume
Floor tiles (rubber & plastic)
Flowable fill Latex paint Laminated paperboard Modular threshold ramps Nonpressure pipe Patio blocks Railroad grade crossings/ surfaces Roofing materials
Shower & restroom dividers/partitions
Structural fiberboard
Landscaping Products Compost from yard trimmings or food waste Garden and soaker hoses Hydraulic mulch Lawn and garden edging Plastic lumber landscaping timbers and posts
Park & Recreation Products:
Park and recreational furniture Playground equipment Playground surfaces Running tracks Plastic fencing (snow or erosion control, safety barriers)
Non-paper Office Products Binders (paper, solid plastic or plastic covered) Plastic clipboards Plastic file folders Plastic clip portfolios Plastic presentation folders Office furniture Office recycling containers Office waste receptacles Plastic desktop accessories Plastic envelopes Plastic trash bags Printer ribbons Toner cartridges
Paper & Paper Products Commercial/industrial sanitary tissue products MiscellanousMiscellaneous papers Newsprint Paperboard and packaging Printing and writing papers Tray liners
Vehicular Products:
Engine coolants Rebuilt vehicular parts Re-refined lubricating oils Retread tires
Transportation Products Channelizers Delineators Flexible delineators Parking stops Traffic barricades Traffic cones
Miscellaneous Products:
Awards and plaques Bike racks Blasting grit Industrial drums Mats Pallets Signage Sorbents Strapping http://www.epa.gov/cpg/products
PROCUREMENT TITLE:
PROCUREMENT REQUEST NO.
PART 1: RECOVERED MATERIALS DETERMINATION (CONT’D)
FAR 11.002(d) requires the establishment of statements of work and specification requirements for the procurement of products containing recovered materials and environmentally preferable and energy-efficient products and services.
If no EPA designated items were checked on page 1, than check box A:
A. I hereby certify that no EPA designated guideline items are included in this procurement action
If any EPA designated items are checked on page 1, than mark box B or C:
B. I hereby certify that the EPA recycled content requirements have been specified for all of the designated guideline items in this procurement action
OR
C. I hereby certify that the EPA recycled content requirements have been specified for all but the following designated guideline items for which compliance with EPA standards is not attainable.
If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.
The exemption being claimed for this purchase is:
1. The product does not meet appropriate performance standards (in accordance with National
Institute of Standards and Technology (NIST) guidelines
2. The product is not available within a reasonable time frame
3. The product is not available competitively (from two or more sources)
4. The product is only available at an unreasonable price (based on a life-cycle cost analysis).
Designated Item Justification #
1.
2.
3.
4.
5.
Design/Specifying Agent Signature Date
Requiring Organization’s Technical Representative Signature Date
PROCUREMENT TITLE:
PROCUREMENT REQUEST NO.
PART 2: GREEN PROCUREMENT CERTIFICATION
Part 2 of this certification is to be completed upon receipt of the purchase goods and services. If EPA designated items were specified in this procurement action, the contractor/supplying agent shall complete Part 2 of this certification upon delivery of the products or services. Attach supporting documentation identifying percentage of recovered material content used in each designated item. NOTE: A designated item is specified if no exemptions were prepared and identified in Part 1.C of this form during the development of this procurement action.
Check the appropriate box:
A. EPA recycled content requirements have been met for all designated items specified in this procurement action.
OR
B. EPA recycled content requirements have been met for all but the following EPA designated guideline item(s) for which compliance with EPA standards was not attainable.
If Box B is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.
The exemption being claimed for this purchase is:
1. The product does not meet appropriate performance standards (in accordance with National
Institute of Standards and Technology (NIST) guidelines.)
2. The product is not available within a reasonable time frame
3. The product is not available competitively (from two or more sources)
4. The product is only available at an unreasonable price (based on a life-cycle cost analysis).
Designated Item Justification #
1.
2.
3.
4.
5.
Contractor/Supplying Agent Signature Date
GREEN PURCHASING PROGRAM
EPA CPG DESIGNATED ITEM PURCHASE EXEMPTION
PROCUREMENT TITLE:
PROCUREMENT REQUEST NO.
The technical authority shall prepare a separate justification for each designated item purchased that does not meet EPA standards as part of this procurement action:
The following item does not comply with EPA standards for recycled/recovered materials:
The exemption being claimed for this purchase is:
1. The product does not meet appropriate performance standards (in accordance with National Institute of Standards and Technology (NIST) guidelines)
2. The product is not available within a reasonable time frame
3. The product is not available competitively (from two or more sources)
4. The product is only available at an unreasonable price (based on a price analysis that considers life-cycle cost). The recycled-content product costs $ per and the non-recycled-content product costs $ per
This written justification is made in accordance with 42USC 6962(c)(1):
Design/specifying Agent’s Signature Date
Contracting Officer’s Signature Date
Rationale for exemption: (Please provide the rationale upon which this justification was based. Include vendor names, points of contact, life-cycle cost analysis and any other documentation that supports this decision.
| 12 August 2004 |
| INSTRUCTIONS |
| PROCUREMENT REQUEST NO. |
| PART 1: RECOVERED MATERIALS DETERMINATION |
| EPA-DESIGNATED ITEMS |
| Construction Products: |
| Landscaping Products |
| Non-paper Office Products |
| Paper & Paper Products |
| Retread tires |
| Transportation Products |
| PROCUREMENT REQUEST NO. |
| Designated Item Justification # |
| PROCUREMENT REQUEST NO. |
| PART 2: GREEN PROCUREMENT CERTIFICATION |
| Designated Item Justification # |
| PROCUREMENT REQUEST NO. |
| Requiring Organization’s Technical Representative Signature Date |
| Contracting Officer’s Signature Date |
| Check mark Box B on Part 1 of the GPPC Form Provide signatures dates: | |
| Check mark Box B on Part 2 of the GPPC Form and complete the justification section Provide signaturesdatesRow1: | |
| Check mark Box B on Part 2 of the GPPC Form and complete the justification section Provide signaturesdatesRow1_2: | |
| Complete an Green Purchasing Program EPA CPG Designated Item Purchase Exemption Form for each EPAdesignated item for which an exemption has been claimed on Part 2 or 3 of the GPPC FormRow1: | |
| Complete an Green Purchasing Program EPA CPG Designated Item Purchase Exemption Form for each EPAdesignated item for which an exemption has been claimed on Part 2 or 3 of the GPPC FormRow1_2: | |
| Complete Part 2 of the GPPC FormRow1: | |
| Complete Part 2 of the GPPC FormRow1_2: | |
| Building insulation: Off | |
| Polyester carpet: Off | |
| Carpet Cushion: Off | |
| Coal fly ash: Off | |
| Ground granulated: Off | |
| Cenospheres: Off | |
| Silica fume: Off | |
| Floor tiles rubber: Off | |
| Flowable fill: Off | |
| Latex paint: Off | |
| Laminated paperboard: Off | |
| Modular threshold ramps: Off | |
| Nonpressure pipe: Off | |
| Patio blocks: Off | |
| Railroad grade crossings: Off | |
| Roofing materials: Off | |
| Shower restroom: Off | |
| Structural fiberboard: Off | |
| Compost from yard: Off | |
| Garden and soaker hoses: Off | |
| Hydraulic mulch: Off | |
| Lawn and garden edging: Off | |
| Plastic lumber landscaping: Off | |
| Park and recreational: Off | |
| Playground equipment: Off | |
| Playground surfaces: Off | |
| Running tracks: Off | |
| Plastic fencing snow or: Off | |
| Binders paper solid plastic: Off | |
| Plastic clipboards: Off | |
| Plastic file folders: Off | |
| Plastic clip portfolios: Off | |
| Plastic presentation folders: Off | |
| Office furniture: Off | |
| Office recycling containers: Off | |
| Office waste receptacles: Off | |
| Plastic desktop accessories: Off | |
| Plastic envelopes: Off | |
| Plastic trash bags: Off | |
| Printer ribbons: Off | |
| Toner cartridges: Off | |
| Commercialindustrial: Off | |
| MiscellanousMiscellaneous: Off | |
| Newsprint: Off | |
| Paperboard and packaging: Off | |
| Printing and writing papers: Off | |
| Tray liners: Off | |
| Engine coolants: Off | |
| Rebuilt vehicular parts: Off | |
| Rerefined lubricating oils: Off | |
| Retread tires: Off | |
| Channelizers: Off | |
| Delineators: Off | |
| Flexible delineators: Off | |
| Parking stops: Off | |
| Traffic barricades: Off | |
| Traffic cones: Off | |
| Awards and plaques: Off | |
| Bike racks: Off | |
| Blasting grit: Off | |
| Industrial drums: Off | |
| Mats: Off | |
| Pallets: Off | |
| Signage: Off | |
| Sorbents: Off | |
| Strapping: Off | |
| A I hereby certify that no EPA designated guideline items are included in this procurement action: On | |
| B I hereby certify that the EPA recycled content requirements have been specified for all of the: Off | |
| C I hereby certify that the EPA recycled content requirements have been specified for all but the: Off | |
| 1: | |
| 2: | |
| 3: | |
| 4: | |
| 5: | |
| Date: 20 Jan 2023 | |
| Date_2: 20 Jan 2023 | |
| procurement action: Off | |
| guideline items for which compliance with EPA standards was not attainable: Off | |
| 1_2: | |
| 2_2: | |
| 3_2: | |
| 4_2: | |
| 5_2: | |
| Date_3: | |
| Date_4: | |
| The following item does not comply with EPA standards for recycledrecovered materials: | |
| 1 The product does not meet appropriate performance standards in accordance with National: Off | |
| 2 The product is not available within a reasonable time frame: Off | |
| 3 The product is not available competitively from two or more sources: Off | |
| 4 The product is only available at an unreasonable price based on a price analysis that: Off | |
| considers lifecycle cost The recycledcontent product costs: | |
| per: | |
| nonrecycledcontent product costs: | |
| per_2: | |
| Date_5: | |
| Date_6: | |
| Date_7: | |
| 2023-01-20T15:22:26-0500 | |
| SNOW.KRISTINE.E.1539937967 |
| PROCUREMENT TITLE: Repair Courthouse B402 and Demolish B561 | |
| PROCUREMENT REQUEST NO: SXHT 12-1042 | |
| 2023-01-20T15:23:13-0500 | |
| SNOW.KRISTINE.E.1539937967 |
File details come from the government source that posted it. Updated .