Attch__2_FA2521-17-B-0007_DBEH_14-1502_RprHVltgDctBank(Final_Design_Drawings)_REV.pdf
PDF 10 MB Posted
- Solicitation number
- FA2521-17-B-0007
About this file
Attachment 2 Drawings
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
K
I
D
T
R
I
P n g i n e e r i n g I n c
L L
E N
E A
U S
A F
T
H
C
I V
L
E
N G
I N
E E
R
S
Q U
A D
R O
N
B
U I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
C
O
F
A
D
R
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G-001
J
M
A Y
H E
W
M
M
A Y
H E
W
L O
C A
T I O
N
M
A P
P
R O
J E
E
A
A
N D
D R
A W
I N
G
I N
D E
X
C
H
A R
T N
E T
T
D B
H
G
B
E A
R D
D B
C C
A F
S
F
L
CAPE CANAVERAL AIR FORCE STATION
DBEH 14-1502
CAPE CANAVERAL, FLORIDA
SCALE:
LOCATION MAP
NONE
TRUE
NORTH
N
REPAIR HIGH VOLTAGE DUCT BANK,
LAUNCH COMPLEX ROADS
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
GROUNDWATER CONTAMINATION
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
ASBESTOS
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
PROJECT AREA
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
E
D
DRAWING INDEX
SHEET NO. DESCRIPTION
GENERAL
G-001
LOCATION MAP, PROJECT AREA AND DRAWING INDEX
ELECTRICAL
E-001 KEY PLAN - DEMOLITION AND NEW CONSTRUCTION
E-002 ELECTRICAL NOTES
E-003 ELECTRICAL LEGEND AND ABBREVIATIONS
E-004 STORMWATER POLLUTION PREVENTION PLAN NOTES
E-005 STORMWATER POLLUTION PREVENTION PLAN DETAIL
ED-101 U-LINE DEMOLITION - PLAN 1
ED-102 U-LINE DEMOLITION - PLAN 2
ED-103 U-LINE DEMOLITION - PLAN 3
ED-104 U-LINE DEMOLITION - PLAN 4
ED-105 HEIV7-LINE UNDERGROUND DEMOLITION - PLAN 5
ED-106 HEIV7-LINE UNDERGROUND DEMOLITION - PLAN 6
EC-101 4S14-LINE UNDERGROUND ELECTRICAL - NEW - PLAN 1
EC-102 4S15-LINE UNDERGROUND ELECTRICAL - NEW - PLAN 2
EC-103 4S16-LINE UNDERGROUND ELECTRICAL - NEW - PLAN 3
EC-104 4S16-LINE UNDERGROUND ELECTRICAL - NEW - PLAN 4
EC-105
4S16, HEIV7-LINES UNDERGROUND ELECTRICAL - NEW - PLAN 5
EC-106 HEIV7-LINE UNDERGROUND ELECTRICAL - NEW - PLAN 6
EC-107 HEIV7-LINE UNDERGROUND ELECTRICAL - NEW - PLAN 7
E-501 MANHOLE DUCT BANK DETAILS - SHEET 1 OF 2
E-502 MANHOLE DUCT BANK DETAILS - SHEET 2 OF 2
E-503 MISCELLANEOUS DETAILS - SHEET 1 OF 2
E-504 MISCELLANEOUS DETAILS - SHEET 2 OF 2
E-505 ELECTRICAL DETAILS - SHEET 1 OF 2
E-506 ELECTRICAL DETAILS - SHEET 2 OF 2
E-601 SINGLE-LINE DIAGRAM - EXISTING AND DEMOLITION
E-602 SINGLE-LINE DIAGRAM - NEW CONSTRUCTION
R E
P A
G
H
V
O L
T A
G
C
T
B
A N
K
L A
U N
M
P L
X
A
D S
P
M b a r v i r
X
X
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
X
X
X
X
X
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
H
R
U
B
L
A
N
D
S
S
S
S
K
R
I
P
S A
M U
E L
C
P
H I L L I P
S
P
K W
Y n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
E-001
ED-101
J
M
A Y
H E
W
M
M
A Y
H E
W
K E
Y
P
L A
N
D
E M
O L I T
I O
N
A
W
C O
N S
T R
U C
T I O
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
U-LINE KEY PLAN - DEMOLITION
N
TRUE
NORTH
ED-102
ED-103
ED-104
S A
M U
E L
C
P
H I L L I P
S
P
K W
Y
SAB R
O
AD
M E
R C
U R
Y
G
E M
I N
I
R
O A
D
O
LD P
RESS S
IT
E R O
AD
CENTRAL CONTROL ROAD
44636
49904
44600
EC-104
KEY PLAN - NEW CONSTRUCTION
EC-101
TRUE
NORTH
EC-102
CENTRAL CONTROL ROAD
EC-105
EC-103
SWMU AREA
M E
R C
U R
Y
G
E M
I N
I
R
O A
D
44636
SAB R
O
AD
49904
O
LD P
RESS S
IT
E R O
AD
44810
NORTH
N
SCALE:
KEY MAP
NONE
U-LINE
INDUSTRIAL
AREA
N
ED-105
EC-106
EC-107
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
ED-106
P
M b a r v i r
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NONE
n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
E-002
J
M
A Y
H E
W
M
M
A Y
H E
W
E L
E C
T R
I C
T
E S
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
GENERAL NOTES:
1. EXISTING CONDITIONS MAY VARY FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY EXISTING CONFIGURATION
AND CONDITIONS.
2. CONTRACTOR SHALL FIELD VERIFY THAT INDICATED ELEVATIONS PROVIDE A MINIMUM OF 1'-6" COVER OVER DUCT
BANK AT MINIMUM COVER POINT AND THAT MANHOLE COVER ELEVATION PLACES MH COVER AT GRADE (-0, +1").
LOAD BREAK SWITCH TOP OF PAD SHALL BE AT CROWN OF ROAD OR ADJACENT BLDG FF ELEVATION.
3. CONTRACTOR SHALL HAND DIG AT ALL EXISTING BURIED UTILITY CROSSINGS.
4. CONTRACTOR SHALL LEAVE A 1/4" DIAMETER PULL ROPE IN ALL SPARE DUCTS.
5. SEAL AROUND GROUND ROD PENETRATIONS OF MANHOLES WITH WATERPROOF FLEXIBLE SILICONE-BASED
SEALANT.
6. GROUND ALL MANHOLE AND HANDHOLE METAL WITH #4/0 BARE CU CONDUCTOR.
7. DUCT BANK ROUTINGS ARE DIAGRAMMATIC AND ARE SUBJECT TO MODIFICATION BASED ON UNDERGROUND AND
OTHER INTERFERENCES. MANHOLE LOCATIONS ARE BASED ON BEST INFORMATION AVAILABLE AT TIME OF DESIGN
RELEASE. MANHOLE LOCATIONS ARE SUBJECT TO MODIFICATION BASED ON INTERFERENCES. CONTRACTOR SHALL
SUBMIT AN RFI FOR MANHOLE LOCATION CHANGES GREATER THAN 50'.
8. CONSTRUCTION SHALL BE ACCOMPLISHED IN SUCH A MANNER AS TO MINIMIZE POWER OUTAGES. INSTALLATION
SHALL PRECEDE DEMOLITION.
9. CONTAINMENT OF DRILLING FLUIDS (SLURRIES, BENTONITE, ETC.) MUST BE MAINTAINED WITHIN THE CONSTRUCTION
AREA OR WITHIN THE ENTRY AND EXIT PITS. NO DISCHARGE IS ALLOWED TO GO TO SURFACE WATERS. EXCESS AND
SURFACE BLOWOUT DRILLING FLUIDS SHALL BE COLLECTED AND DISPOSED OFF-SITE, MIXING WITH EXCESS SPOIL
OR PLACEMENT IN OPEN TRENCHES IS PROHIBITED.
10. ALL TOP OF MANHOLE ELEVATIONS SHOWN DESIGNATE TOP OF MANHOLE COVER. TOP OF MANHOLE PROPER WILL
BE DETERMINED BY COVER DEPTH.
11. MAINTAIN 18" VERTICAL SEPARATION BETWEEN DUCT BANK AND EXISTING UNDERGROUND UTILITIES WHERE
POSSIBLE. IF EXISTING UTILITIES ARE INCLUDED IN THE CONCRETE ENCASEMENT OF THE DUCT BANK, MAINTAIN 2"
(MIN) SEPARATION BETWEEN OUTSIDE OF CONDUIT AND OUTSIDE OF UTILITY PIPE OR DUCT.
12. THE CONTRACTOR SHALL REMOVE FROM THE JOB SITE ALL DEMOLISHED ASPHALT PAVEMENT IMMEDIATELY UPON
DEMOLITION, WITH NO ONSITE STOCKPILING OF THIS MATERIAL.
13. ALL 2W4 DUCT BANK SHALL CONSIST OF (1) CONDUIT WITH A 3-CONDUCTOR CIRCUIT AND (1) SPARE CONDUIT, UON.
14. STAGING AREAS FOR SOIL OR MATERIALS SHALL BE APPROVED BY CONTRACTING OFFICER PRIOR TO USE.
15. CONTRACTOR SHALL SUPPLY, CONNECT, OPERATE, FUEL, AND MAINTAIN TEMPORARY ELECTRICAL GENERATORS
FOR THE DURATION OF ELECTRICAL OUTAGE. THE GENERATORS SHALL BE SIZED TO MAINTAIN FULL FACILITY
FUNCTION WITHOUT VOLTAGE SAG.
16. CONTRACTOR SHALL COORDINATE WITH 45 SW ENVIRONMENTAL SECTION THROUGH THE CONTRACTING OFFICER TO
ARRANGE FOR TRANSFORMER DROP-OFF AT FACILITY 44200. SEE SPECIFICATION SECTION 01 57 19.
17. AT ALL POLE REMOVAL LOCATIONS, RESTORE GRADE TO MATCH EXISTING.
18. ALL CONDUCTORS ARE 15kV, 4/0 AND #2, EPR UNLESS OTHERWISE NOTED.
19. CONTRACTOR SHALL COORDINATE ALL DEWATERING ACTIVITIES WITH IRP OFFICE.
20. TO MINIMIZE SPLICES WHERE POSSIBLE, INSTALL UNSPLICED CABLE IN NEW MANHOLES WITH SERVICE LOOP.
MOUNT CABLE LOOP ON MANHOLE RACKS.
21. WHERE PENETRATIONS THROUGH CONCRETE MANHOLES AND SIDEWALKS MUST BE MADE, OR WHERE EXCAVATION
ACTIVITIES WILL GENERATE DUST AND PARTICULATES, WORKERS SHALL UTILIZE RESPIRATORY PROTECTION PER 29
CFR 1910.134 AGAINST SILICA AND PARTICULATES. REFER TO ELECTRICAL DRAWINGS TO DETERMINE THE EXTENT
OF IMPACT.
22. THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER IF THE PRESENCE OF MATERIALS CONTAINING
HEAVY METALS, INCLUDING BUT NOT LIMITED TO LEAD, CADMIUM, CHROMIUM OR ASBESTOS-CONTAINING MATERIALS
(ACM) IS SUSPECTED OR DISTURBED, AND HAS NOT BEEN IDENTIFIED BY THIS CONTRACT BUT IS REQUIRED TO BE
DISTURBED IN ORDER TO:
PERFORM THE CONTRACT WORK;
SAFELY ACCESS THE AREA OF WORK WITHOUT EXPOSURE TO HAZMAT ABOVE THE PEL; OR
HAVE WORKERS PERFORM THE CONTRACT WORK WITHOUT EXPOSURE ABOVE PEL.
UNDER NO CIRCUMSTANCES SHALL ANY MATERIALS CONTAINING HEAVY METALS OR ASBESTOS BE REMOVED
WITHOUT CONTRACTING OFFICER APPROVAL.
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
BɸFROM
Bɸ TO
FROM
AT EQUIPMENT
MHTOMHBɸ
SS37V1-1
MH Bɸ
AT MANHOLES
2329 2418
CKT N0IC10
KCMIL KCMIL
KCMILKCMIL
SCALE:
CIRCUIT IDENTIFICATION TAG DETAIL - EXAMPLE
NONE
INDICATES PHASE OF
SINGLE CONDUCTOR CABLE
CABLE
1" HIGH POLYPROPYLENE TAGS
WITH BLACK ON YELLOW FINISH
STANDARD CHARACTERS
(TYPICAL CABLE NUMBER SHOWN)
NYLON SELF-LOCKING
TIE-STRAPS
CABLE
POLYETHYLENE TAG HOLDER
WITH BLACK FINISH (TYP)
NOTE: AT EQUIPMENT, CABLE TAG
SHALL IDENTIFY EQUIPMENT AT OTHER
END OF THE CABLE.
P
M b a r v i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
E-003
J
M
A Y
H E
W
M
M
A Y
H E
W
E L
E C
T R
I C
G
E N
D
A
B
R E
V I A
T I O
N S
C
H
A R
T N
E T
T
D B
G
B
E A
R D
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
D B
C C
A F
S
F
L
OVERHEAD ELECTRIC - TO BE REMOVED
OVERHEAD ELECTRIC - EXISTING
UNDERGROUND ELECTRIC DUCT BANK (MV) - NEW INSTALLATION
UNDERGROUND ELECTRIC CONDUIT (LV) - NEW INSTALLATION
UNDERGROUND ELECTRIC CONDUIT (LV) - EXISTING
ABANDONED UNDERGROUND ELECTRICAL DUCT BANK
WATER LINE - EXISTING
SANITARY SEWER - EXISTING
COMMUNICATIONS DUCT BANK - EXISTING
FENCE - EXISTING
ABANDONED IN PLACE
STORM DRAIN LINE - EXISTING
FIRE WATER LINE - EXISTING
UNDERGROUND NITROGEN FUEL LINE - EXISTING
GROUND WIRE
EXISTING UNDERGROUND INFILTRATION GALLERY
DIRECTIONAL DRILL/BORE
COMMUNICATIONS MANHOLE - EXISTING
ELECTRIC MANHOLE - EXISTING
SANITARY MANHOLE - EXISTING
WASTEWATER - SEPTIC MANHOLE - EXISTING
STORM SEWER MANHOLE - EXISTING
FIRE HYDRANT - EXISTING
ELECTRIC MANHOLE - NEW, PRECAST CONC, 10'x10'x10' UNO
DUCT BANK (EX. 4-WAY 5")
EDGE OF VEGETATION
DISTURBED AREAS TO BE STABILIZED
(RETURN TO GRADE, RESEED/SOD)
VEGETATION - TO BE REMOVED
ASPHALT PAVING
ROAD CUT
EXISTING MONITORING WELL
ABANDONED MONITORING WELL
LOAD BREAK SWITCH
VFI POSITION
FAULT INDICATOR
LOAD BREAK POSITION
EMBANKMENT
CONTAMINATED GROUND WATER
PLUME AREA (IRP SITE/SWMU)
SOLID WASTE MANAGEMENT UNIT (SWMU)
SECTIONALIZER (SINGLE)
SECTIONALIZER (SINGLE WITH 2ND ENCLOSURE)
POWER POLE, WOOD - EXISTING
POWER POLE, CONCRETE - EXISTING
SIGN - EXISTING
WATER VALVE
WATT-HOUR METER
POLE-MOUNTED TRANSFORMER(S)
PAD-MOUNTED TRANSFORMER (MV)
TRANSFORMER (LV)
DISCONNECT SWITCH
LOAD BREAK SWITCH
PANELBOARD, 480/277V, 3PH, 4W
PANELBOARD, 208/120V, 3PH, 4W
SPLICE
X X
4W5
SS SS
W W
C C
S
C
OHE OHE
OHE OHE
LEGEND:
KVAR KILOVAR
KILOWATT
LINEAR FEET
LOAD TAP CHANGER
LOW VOLTAGE
LOAD BREAK SWITCH
KW
LF
LTC
LV
LBS
WITHOUT
WEATHERPROOF
WATER
TRANSFORMER
ZONE
XFMR
ZN
W
W/
W/O
WP
WTR
WATT
WITH
THOUSAND CIRCULAR MILS
OIL-AIR/FORCED AIR/FORCED AIR
POTENTIAL TRANSFORMER
REINFORCED CONCRETE PIPE
RIGID GALVANIZED STEEL
SQUARE FOOT, SQUARE FEET
TELEPHONE TERMINAL BOARD
TELEPHONE TERMINAL CABINET
UNLESS OTHERWISE NOTED
VACUUM CIRCUIT BREAKER
AS
MTC
AMMETER SWITCH
MANUAL TAP CHANGER
ECCENTRIC REINFORCED CONCRETE PIPE
FLORIDA DEPARTMENT OF TRANSPORTATION
CENTER LINE, CLEAR
AUTOMATIC TRANSFER SWITCH
AUXILIARY
BELOW FINISHED FLOOR
BELOW FINISHED GRADE
BASIC INSULATION IMPULSE LEVEL
CONDUIT
CIRCUIT BREAKER
CORRUGATED METAL PIPE
CONCRETE
CONTINUED, CONTINUATION, CONTROL
CURRENT TRANSFORMER
COPPER
DIAMETER
DIMENSION
DISCONNECT
DRAWING
ELEVATION
ELECTRIC
ELECTRICAL METALLIC TUBING
EDGE OF PAVEMENT
FINISHED
FULL LOAD AMPS
GOVERNMENT FURNISHED EQUIPMENT
GROUND
GALVANIZED RIGID STEEL
HARDWARE
HORIZONTAL
HORSEPOWER
HIGH VOLTAGE
HOT WATER
CURRENT
INSIDE DIAMETER
INCH, INCHES
THOUSAND CIRCULAR MILS
KILOVOLTS
EOP
I
ID
IN
KCMIL
kV,KV
HDWR
HORIZ
HP
HTR
HV
HW
HEATER
FLA
FT
GFE
GND
GRS
FEET
ERCP
FDOT
FDR
FIN
FL
FEEDER
FLOOR
DN
DWG
EL
ELEC
EMT
DOWN
CONT
CT
CU
DIA(Ø)
DIM
DISC
CL
C
CB
CKT
CMP
CONC
CIRCUIT
ATS
AUX
BFF
BFG
BIL
THICK
TYPICAL
UNDER FLOOR
UNDERGROUND
VACUUM
VELOCITY
VERTICAL
UG
UON
VAC
VCB
VEL
VERT
THK
TTB
TTC
TYP
UF
REFERENCE
SANITARY
SHEET
STAINLESS STEEL
STATION
SWITCH
SYSTEM
TEMPERATURE
SQ FT
SS
STA
SW
SYS
TEMP
RCP
REF
RGS
SAN
SHT
OA/FA/FA
ON CENTER
OIL CIRCUIT BREAKER
OUTSIDE DIAMETER
OVERHEAD
OPPOSITE
OVERHEAD
POWER FACTOR
PANEL, PANELBOARD
PRESSURE
QUANTITY
PF
PNL
PRESS
PT
QTY
OC
OCB
OD
OH
OPP
OVHD
MEDIUM VOLTAGE
MOTOR
NAIL AND DISK
NOT APPLICABLE
NORMALLY CLOSED
NEUTRAL
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OXYGEN
NEUT
NIC
NO
NTS
O2, O
MV
MTR
N&D
N/A
NC
ABBREVIATIONS:
AMPERE, AMPS
ABOVE FINISHED COUNTER
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPS INTERRUPTING CAPACITY
A
AFC
AFF
AFG
AIC
MECHANICAL
MANHOLE
MOTOR OPERATED
MULTI-RATIO
MCM
MECH
MH
M.O.
MR
X X X X X X X
E
WEATHERWX
SVC SVC
UGE UGE
E E
E E
AIP AIP
SD SD
FW FW
GN2 GN2
HANDHOLEHH
FLOW LINE
SOLID WASTE MANAGEMENT UNITSWMU
WW
ST
PAPER INSULATED LEAD CABLEPILC
AUE AUE
FF FINISHED FLOOR
VACUUM FAULT INTERRUPTERVFI
SECTIONALIZERSECT
INSTALLATION RESTORATION PROGRAMIRP
POLYCHLORINATED BIPHENYLSPCB
PERSONAL PROTECTIVE EQUIPMENTPPE
M
T
G G G
PERMITTED EXPOSURE LIMITPEL
ABSORBENT GLASS MATAGM
P
M b a r v i r
AutoCAD SHX Text
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L E
N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
E-004
J
M
A Y
H E
W
M
M
A Y
H E
W
S T
O R
M W
A T
P
L L U
T I O
N
P
R E
V E
N T
I O
N
P L A
N
N
O T
E S
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
SITE DESCRIPTION
OWNER AND ADDRESS: UNITED STATES AIR FORCE
1224 JUPITER STREET, BUILDING 534
PATRICK A.F.B., FLORIDA 32925
LOCATION: CAPE CANAVERAL AIR FORCE STATION
LATITUDE: 28° 30' 47" N LONGITUDE: 80° 34' 19" W
SECTION / TOWNSHIP / RANGE: 8 / 23 S / 38 E
PROJECT NAME: REPAIR HIGH VOLTAGE DUCTBANK LAUNCH COMPLEX ROADS
PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF EXCAVATION WORK
FOR THE INSTALLATION OF NEW UNDERGROUND UTILITIES.
SITE MAPS:
* CONSULT ASSOCIATED PLANS FOR EROSION AND SEDIMENT CONTROLS,
STORMWATER DISCHARGE POINTS LOCATION OF SURFACE WATER AND
CONSTRUCTION IMPACT.
SITE AREA:
1. TOTAL AREA OF SITE = 12 AC
2. TOTAL AREA DISTURBANCE = 5 AC
3. WETLAND AREA = NONE
4. RECEIVING WATER = BANANA RIVER
CERTIFICATION OF COMPLIANCE WITH FEDERAL,
STATE AND LOCAL REGULATIONS
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL
LAWS REGARDING EROSION AND TURBIDITY CONTROLS, THE FOLLOWING
PERMITS HAVE BEEN OBTAINED AND ARE AVAILABLE ON-SITE:
D.E.P. PERMIT: NONE
C.O.E. PERMIT: NONE
S.J.R.W.M.D. E.R.PERMIT: NONE
D.E.P. N.O.I.: TO BE SUBMITTED BY CONTRACTOR
SEQUENCE OF MAJOR ACTIVITIES
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. SUBMIT NOTICE OF INTENT (N.O.I.)
2. FLAG THE WORK LIMITS & MARK TREE OR PROTECTED AREA BUFFER, IF
APPLICABLE.
3. COORDINATE PRE-CONSTRUCTION MEETING WITH DESIGNATED SITE
SUPERINTENDENT AND INSPECTOR(S) IN CHARGE OF SWPPP REQUIREMENTS
4. INSTALL REQUIRED PERIMETER CONTROLS
5. PERFORM DEMOLITION OPERATIONS, IF APPLICABLE.
6. INSTALL STRUCTURES
7. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE
8. INSTALL PERMANENT SEEDING/SODDING AND PLANTING AND WATER AS
REQUIRED UNTIL PERMANENTLY ESTABLISHED
9. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS
STABILIZED, COORDINATE INSPECTION OF ALL WORK AREAS.
10. REMOVE ANY EROSION CONTROL DEVICES AND RESEED/SOD AS REQUIRED.
11. SUBMIT NOTICE OF TERMINATION (N.O.T.)
CONSTRUCTION CONTRACTOR REQUIREMENTS
IN ADDITION TO THE RESPONSIBILITIES OUTLINED IN THE ABOVE SECTIONS, IT IS
ALSO THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
FOLLOWING IS CONDUCTED:
* N.O.I. FORM IS COMPLETED AND SUBMITTED WITH APPROPRIATE FEE AT LEAST
48 HOURS PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY
* CONSTRUCTION CONTRACTOR AND ALL CONSTRUCTION SUB-CONTRACTORS
COMPLETE CERTIFICATION SIGNIFYING THAT THEY ARE AWARE OF TERMS AND
CONDITIONS OF THE GENERIC PERMIT
* CHANGES TO SWPPP ARE COMPLETED, AS NEEDED, TO ENSURE COMPLIANCE
WITH FEDERAL, STATE AND LOCAL REQUIREMENTS AND THE REPORT FORM
FOR CHANGES TO SWPPP IS COMPLETED, WHEN NECESSARY.
* SITE INSPECTIONS ARE PERFORMED AND THE INSPECTION REPORT FORM
COMPLETED AS INDICATED BY PLAN BY CONSTRUCTION CONTRACTOR'S
QUALIFIED INSPECTOR.
* MAINTENANCE ON BMPs AND MAINTENANCE RECORD COMPLETED AS
INDICATED BY PLAN.
* N.O.T. FORM IS COMPLETED AND SUBMITTED AS INDICATED BY PLAN.
IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE
BEST MANAGEMENT PRACTICES (BMPs) AS SHOWN ON THE SITE PLAN AND AS
CONTAINED IN THIS SWPPP. IT IS ALSO THE CONSTRUCTION CONTRACTOR'S
RESPONSIBILITY TO ENSURE THESE BMPs ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED
WATER FROM LEAVING THE PROJECT SITE. THE CONSTRUCTION CONTRACTOR
SHALL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON THE SITE
PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED TO ENSURE
THE SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY
CONTROL REQUIREMENTS. BEST MANAGEMENT PRACTICES SHALL BE
IMPLEMENTED BY THE CONSTRUCTION CONTRACTOR AS REQUIRED TO MEET
THE SEDIMENT AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE
BY THE REGULATORY AGENCIES.
THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION,
MITIGATION, & REPAIR COSTS ASSOCIATED WITH NON-COMPLIANCE. IT IS THE
CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL
MEASURES TO ATTAIN IMMEDIATE COMPLIANCE, SHOULD VIOLATIONS BE
IDENTIFIED.
EROSION AND SEDIMENT CONTROLS
PERIMETER CONTROLS:
1. SILT FENCE: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING
LIMITATIONS:
A. WHERE THE MAXIMUM DRAINAGE AREA IS 1/4 ACRE PER 100 FEET OF
LENGTH.
B. USE 4"x4" TRENCH & 8" FABRIC EXTENDED INTO GROUND BEFORE BACKFILL
& COMPACTION.
C. MAXIMUM USEFUL LIFE 6 MONTHS.
SWALE / LIVE STREAM SILT / SEDIMENT CONTAINMENT:
1. SEE FDOT INDEX 102, CHART 1, SHEET 1 FOR SPACING REQUIREMENTS FOR
TYPE I AND II SYNTHETIC BALE BARRIERS & SILT FENCES.
2. TURBIDITY CURTAINS SHALL BE LOCATED PARALLEL TO FLOW OF A MOVING
BODY OF WATER & SHALL NOT BE PLACED ACROSS THE MAIN FLOW OF A
SIGNIFICANT BODY OF MOVING WATER.
3. SOIL PARTICLES SHALL BE ALLOWED TO SETTLE A MINIMUM OF 6-12 HOURS
BEFORE REMOVAL OF TURBIDITY CURTAIN.
4. LAND DISTURBING ACTIVITY SHALL NOT CREATE VIOLATIONS OF WATER
QUALITY STANDARDS. MONITORING OF TURBIDITY LEVELS SHALL OCCUR IN
ACCORDANCE WITH PERMIT CONDITIONS.
STOCKPILING MATERIAL:
1. NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS
TO DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT
WATER BODY OR STORM WATER COLLECTION FACILITY.
VEGETATION:
1. TEMPORARY STABILIZATION SHALL BE APPLIED TO AREAS OPENED BY
CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE
RE-DISTURBED AND RECEIVE FINAL STABILIZING TREATMENT WITHIN 14 DAYS.
IF, AFTER 14 DAYS FROM TIME OF STABILIZATION, THE TEMPORARY GRASSED
AREAS HAVE NOT ATTAINED A MINIMUM OF 70% GOOD GRASS COVER, THE
AREA WILL BE REWORKED AND ADDITIONAL MEASURES APPLIED SUFFICIENT TO
ESTABLISH THE DESIRED VEGETATIVE COVER.
2. PERMANENT STABILIZATION SHALL BE PERFORMED IN ALL AREAS THAT
HAVE BEEN DISTURBED BY CONSTRUCTION ACTIVITY UNLESS OTHERWISE
DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE FUNCTION OF
CRITICAL SCRUB HABITAT. FINAL STABILIZATION MUST BE INITIATED NO MORE
THAN 7 DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED IN THAT AREA.
UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE PERMITTED TO CAUSE
A DEGRADATION OF OFFSITE WATER QUALITY. IF SEED IS USED THE SEEDING
MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH
SEASONAL VEGETATION. SLOPES STEEPER THAN 4:1 SHALL BE SODDED.
3. DISTURBED SIDE SLOPES OF DRAINAGE CONVEYANCE SWALES OR
SURFACE WATERS SHALL BE IMMEDIATELY SODDED. SOD SHALL BE PEGGED
OR STAPLED TO RESIST WASHOUT.
4. CONSTRUCTION CONTRACTOR SHALL STABILIZE COMPLETED PORTIONS OF
THE PROJECT AS WORK PROGRESSES TO PROTECT AGAINST EROSION UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE
FUNCTION OF CRITICAL SCRUB HABITAT. CONSTRUCTION CONTRACTOR SHALL
IMMEDIATELY REPAIR, FILL AND SOD ERODED AREAS OF THE PROJECT THAT
RESULT FROM THE CONSTRUCTION LAND ALTERATIONS.
5. ALL AREAS THAT ARE SEEDED/SODDED SHALL BE INSTALLED AND
WATERED UNTIL THE GROUND COVER IS FULLY ESTABLISHED.
POLLUTANT SOURCE CONTROLS:
WASTE DISPOSAL:
1. WASTE MATERIALS AND RUBBISH SHALL BE COLLECTED AND STORED IN
CONTAINERS OR, IF APPROPRIATE, IN PILES. SEPARATE, SELF-CLOSING,
NONFLAMMABLE, NON-REACTIVE CONTAINERS SHALL BE USED FOR GARBAGE.
OILY FLAMMABLE AND DANGEROUS WASTES, NON-SALVAGE MATERIAL AND
DEBRIS SHALL BE REMOVED FROM WORK AREAS AND DISPOSED OF DAILY. THE
CONSTRUCTION CONTRACTOR SHALL USE A LANDFILL OUTSIDE OF THE BASE
FOR DISPOSAL OF CCAFS AND PAFB C&D IN ACCORDANCE WITH FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMITS.
2. ASBESTOS WASTE SHALL BE DISPOSED OF OUTSIDE OF THE BASE IN
ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS.
3. PORTIONS OF THE PROJECT INCLUDE REMOVING AND REPLACING CABLE
ALONG EXISTING DUCT BANKS. THE CONTRACTOR SHOULD BE AWARE THAT
THERE IS POTENTIAL ORANGEBURG PIPING IN/AROUND OLDER DUCT BANKS ON
THE INSTALLATION. IF ORANGEBURG PIPE IS KNOWN TO EXIST, THE
CONTRACTOR MAY ABANDON THE PIPING IN PLACE AND NOTIFY THE
INSTALLATION ENVIRONMENTAL COMPLIANCE OFFICE OF ITS PRESENCE. IF
ORANGEBURG PIPING IS DISCOVERED OR PULLED, THE CONTRACTOR SHALL
MAINTAIN THE PIPING ON SITE AND NOTIFY THE INSTALLATION ENVIRONMENTAL
COMPLIANCE OFFICE OF INTENT TO ABANDON THE PIPING IN PLACE OR
COORDINATE WASTE REMOVAL.
4. REFER TO SPECIFICATIONS FOR FURTHER WASTE AND DISPOSAL AND
RECORD KEEPING REQUIREMENTS.
HAZARDOUS / NON HAZARDOUS:
1. ALL HAZARDOUS WASTE SHALL BE MANAGED IN ACCORDANCE WITH STATE
AND FEDERAL REGULATIONS, INCLUDING 45 SW OPLAN 19-14, BY THE
CONSTRUCTION CONTRACTOR AND SHALL BE TURNED OVER TO THE AIR FORCE
FOR DISPOSAL UNDER THE AIR FORCE'S EPA IDENTIFICATION NUMBER.
2. AT THE PRE-CONSTRUCTION CONFERENCE, THE CONSTRUCTION
CONTRACTOR SHALL PROVIDE THE CONTRACTING OFFICER WITH A LIST OF ALL
HAZARDOUS MATERIALS TO BE INCORPORATED INTO THE PROJECT INCLUDING
THE MATERIAL SAFETY DATA SHEET IN ACCORDANCE WITH DFARS 52.223-3,
HAZARDOUS WASTE MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
AND PROJECT SPECIFICATIONS. THE CONSTRUCTION CONTRACTOR SHALL
SUBMIT COPIES OF SIGNED INTERNAL MANIFESTS TO THE CONTRACTING
OFFICER MONTHLY.
3. THE CONSTRUCTION CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY IF ANY CONTAMINATED SOIL, GROUND WATER OR
SUSPECT DEBRIS IS ENCOUNTERED DURING EXCAVATION, DEMOLITION OR
CONSTRUCTION OF THE PROJECT.
SANITARY WASTE:
1. ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS
AS NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE SHALL BE
COLLECTED AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL
WASTE DISPOSAL REGULATIONS FOR SANITARY SEWER.
OFFSITE VEHICLE TRACKING:
1. A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED, WHERE
NECESSARY, TO HELP REDUCE VEHICLE TRACKING OF SEDIMENT. THE PAVED
STREET ADJACENT TO THE SITE ACCESS SHALL BE SWEPT DAILY TO REMOVE
ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS
HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED WITH
A TARPAULIN.
FERTILIZERS, PESTICIDES, HERBICIDES:
1. THE SPECIFIED REQUIREMENT FOR FERTILIZERS, PESTICIDES, AND
HERBICIDES SHALL BE IDENTIFIED. THE QUANTITIES AND METHODS OF
APPLICATION SHALL BE CHECKED TO ASCERTAIN THEY ARE APPROPRIATE AND
CONSISTENT WITH LOCAL GUIDELINES.
GOOD HOUSEKEEPING:
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED
ONSITE DURING THE CONSTRUCTION PROJECT:
1. ALL CONSTRUCTION EQUIPMENT SHALL BE IN PROPER WORKING ORDER
AND INSPECTED REGULARLY. ALL EQUIPMENT SHALL HAVE THE BUILT-IN
CAPACITY, STABILITY, AND NECESSARY SAFETY FEATURES TO FULLY COMPLY
WITH THE PROJECT SPECIFICATIONS AND REQUIREMENTS, WITHOUT SHOWING
EVIDENCE OF UNDUE STRESS OR FAILURE. CONSTRUCTION CONTRACTOR
PERSONNEL SHALL BE IN SUFFICIENT NUMBER OF COMPETENT WORKERS ON
THE JOB AT ALL TIMES TO INSURE WORK IS MADE A TIMELY AND SATISFACTORY
MANNER. A COMPETENT AND EXPERIENCED SUPERVISOR, REPRESENTING THE
CONSTRUCTION CONTRACTOR, SHALL BE IN DIRECT CHARGE AND CONTROL OF
OPERATIONS AT ALL TIMES. EQUIPMENT BREAKDOWNS OR OTHER
UNFORESEEN WORK STOPPAGES SHALL IMMEDIATELY CONSIDER THE
PROTECTION OF SURFACE WATERS FROM POTENTIAL POLLUTION.
2. DRIP PANS SHALL CONTAIN LEAKS OR SPILLS WHENEVER NECESSARY FOR
MAINTENANCE ACTIVITIES. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
3. AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS
REQUIRED TO DO THE JOB.
4. ALL MATERIALS STORED ONSITE SHALL BE STORED IN NEAT, ORDERLY
MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A
ROOF OR OTHER ENCLOSURE.
5. PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
ORIGINAL MANUFACTURER'S LABEL.
6. SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
7. WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE
DISPOSING OF THE CONTAINER.
8. MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL
SHALL BE FOLLOWED.
INSPECTION AND MAINTENANCE PLAN
INSPECTION AND MAINTENANCE REPORTS:
1. THE CONSTRUCTION CONTRACTOR'S QUALIFIED INSPECTOR SHALL INSPECT
ALL POINTS OF DISCHARGE INTO SURFACE WATERS, ALL DISTURBED AREAS OF
CONSTRUCTION THAT HAVE NOT BEEN FINALLY STABILIZED, AREAS OF
STORAGE MATERIALS THAT ARE EXPOSED TO PRECIPITATION, STRUCTURAL
CONTROLS AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT
LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE
END OF A STORM THAT IS 0.50 INCHES OR GREATER. WHEN THE SITE HAS BEEN
FINALLY STABILIZED, THE INSPECTION SHALL OCCUR AT LEAST MONTHLY. ALL
INSPECTIONS SHALL BE DOCUMENTED IN THE SWPPP USING THE SWPPP
INSPECTION REPORT FORM.
2. THE EROSION CONTROL SHALL BE MAINTAINED IN GOOD AND EFFECTIVE
OPERATING CONDITIONS, AND REPAIR TO IMPACTED SYSTEMS SHALL BE
INITIATED AND COMPLETED IMMEDIATELY. WHERE EROSION CONTROL
MEASURES ARE DEEMED INEFFECTUAL BY THE CONSTRUCTION CONTRACTOR,
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE OR THE CONTRACTING
OFFICER, THE CONSTRUCTION CONTRACTOR SHALL IMMEDIATELY COORDINATE
CORRECTIVE MEASURES FOR REPAIR AND REPLACEMENT. ALL REGULAR AND
SPECIAL MAINTENANCE SHALL BE RECORDED IN THE SWPPP ON THE
MAINTENANCE REPORT FORM. ALTERNATIVE MEASURES, REPAIRS, AND
REPLACEMENT SHALL BE IMMEDIATELY IMPLEMENTED AND RECORDED WITH
THE FORM FOR CHANGES TO THE SWPPP. IN NO CASE SHALL IMPLEMENTATION
OF THE REPAIR OR REPLACEMENT OCCUR MORE THAN 7 CALENDAR DAYS
FOLLOWING THE INSPECTION.
3. THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE'S QUALIFIED
INSPECTORS SHALL PERIODICALLY REVIEW THE CONSTRUCTION
CONTRACTOR'S INSPECTION REPORTS FOR ADEQUACY AND COMPLETION AND
REPORT IN WRITING, TO THE CONTRACTING OFFICER ANY DEFICIENCIES IN THE
REPORTING. THE CONSTRUCTION CONTRACTOR SHALL ADJUST THE
REPORTING REQUIREMENTS TO THE SATISFACTION OF THE CONTRACTING
OFFICER. THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE REPORTS
SHALL ALSO BE MADE A RECORD OF THE SWPPP.
4. ALL REPORTS, PLANS, AND AMENDMENTS SHALL BE MADE PART OF THE
SWPPP. SUCH REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE.
WHEN A REPORT DOES NOT IDENTIFY ANY INCIDENCES OF NONCOMPLIANCE,
THE REPORT SHALL CONTAIN A CERTIFICATION THAT THE FACILITY IS IN
COMPLIANCE WITH THE SWPPP AND GENERIC PERMIT. THE REPORT SHALL BE
SIGNED IN ACCORDANCE WITH THE GENERIC PERMIT.
NON-STORM WATER DISCHARGES
DEWATERING DISCHARGES:
1. DEWATERING ACTIVITIES ARE SUBJECT TO REVIEW OF THE JURISDICTIONAL
STATE AGENCIES, THE CONTRACTING OFFICER AND UNITED STATES AIR FORCE
ENVIRONMENTAL AND IRP OFFICES. DISCHARGES SHALL PROVIDE PROVISIONS
SO THAT NO UPSTREAM FLOODING OR IMPOUNDMENT OCCURS AND NO
SILTATION, EROSION, OR TURBID DISCHARGES OCCURS IN VIOLATION OF STATE
WATER QUALITY STANDARDS. ALL TEMPORARY WORKS SHALL BE COMPLETELY
REMOVED AND ALL AREAS RESTORED TO GRADES, ELEVATIONS AND
CONDITIONS THAT OCCURRED BEFORE CONSTRUCTION AS SOON AS POSSIBLE.
2. IT IS NOTED HERE THAT GROUNDWATER DEWATERING ACTIVITIES AT
CONSTRUCTION SITES CANNOT BE CONDUCTED UNDER THE GENERIC PERMIT
FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION
ACTIVITIES. PURSUANT TO SECTION 62-621.300(2, FAC, A SEPARATE PERMIT,
ENTITLED, GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND
WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY, MUST BE APPLIED FOR
TO CONDUCT GROUND WATER DEWATERING ACTIVITIES, IF NECESSARY.
TERMINATION PLAN
1. WHEN THE SITE HAS BEEN FINALLY STABILIZED AND ALL STORMWATER
DISCHARGES FROM CONSTRUCTION SITES ELIMINATED, THE CONSTRUCTION
CONTRACTOR SHALL SUBMIT A NOTICE OF TERMINATION (N.O.T.) WITHIN 14
DAYS OF FINAL STABILIZATION WITH A SUFFICIENT AMOUNT OF ESTABLISHED
PERMANENT VEGETATION.
2. AFTER FILING N.O.T., THE CONSTRUCTION CONTRACTOR SHALL SUBMIT THE
FINAL SWPPP, INCLUDING ALL REPORTS AND RECORDS, TO THE CONTRACTING
OFFICER. THE OWNER SHALL THEN BE RESPONSIBLE TO RETAIN A COPY OF
THE POLLUTION PREVENTION PLAN FOR A PERIOD OF THREE YEARS FROM THE
DATE THE SITE IS FINALLY STABILIZED.
CERTIFICATION:
"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY
WITH, THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL
CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION
PLAN PREPARED THEREUNDER."
R E
P A
G
H
V
O L T
A G
E
D
U C
T
B
A N
K
L A
U N
M
P L E
X
R
O A
D S
P
M b a r v
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L E
N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
E-005
J
M
A Y
H E
W
M
M
A Y
H E
W
S T
O R
M W
A T
L L U
T I O
N
P
R E
V E
N T
I O
N
P L A
N
D
E T
A I L
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
SILT FLOW
M
I N
FILTER FABRIC
ELEVATION
SECTION
EROSION CONTROL NOTES:
1. AFTER EACH STORM EVENT, THE SILT FENCE SHALL BE INSPECTED. SEDIMENT DEPOSITS SHALL BE REMOVED AND
WASHOUTS/STRUCTURAL FAILURES SHALL BE REPAIRED IMMEDIATELY.
2. TWO SILT FENCES SHALL BE ATTACHED BY PLACING THE END POST OF THE SECOND FENCE INSIDE THE END POST
OF THE FIRST FENCE. BOTH POSTS SHALL BE ROTATED AT LEAST 180° IN A CLOCKWISE DIRECTION TO CREATE A
TIGHT SEAL WITH THE FABRIC MATERIAL. DRIVE BOTH POSTS 18" INTO THE GROUND & BURY FLAP.
3. SILT FENCES SHALL BE REMOVED ONLY AFTER DISTURBED AREAS HAVE BEEN STABILIZED.
WOOD POST @ 10' O.C.
MIN 1" X 2" X 3'
TRENCH MIN 4" X 4"
BURY MIN 8" OF FABRIC IN TRENCH
GEOTEXTILE SILT SCREEN
STAPLE TO POST
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA
(SLOPES NO GREATER THAN 5 PERCENT) WHERE SHEET OR OVERLAND FLOWS (NOT EXCEEDING 0.5 cfs)
ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS. SUCH AS
IN STREET OR HIGHWAY MEDIANS.
FABRIC SEDIMENT FILTER
SPECIFIC APPLICATION
BURLAP FABRIC
STAKES
BURIED BURLAP
FABRIC
RUNOFF WATER
WITH SEDIMENT
FILTERED WATER
CATCH BASIN INLET SEDIMENT TRAP
SILT FENCE
R E
P A
G
H
V
O L T
A G
E
D
U C
T
B
A N
K
L A
U N
M
P L E
X
R
O A
D S
P
M b a r v
S
D
S
D x x
H
H
E x x
M
H x x
M
H x x
M
H x x x
M
H x x
M
H
H x x
M
H
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
A
B
A
N
D
O
N
E
D
6 D
I
A
B
A
N
D
O
N
E
D
6 A
C
A
B
A
N
D
O
N
E
D
4 T
B
D
A
B
A
N
D
O
N
E
D
6 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
6 T
BD
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
2 T
B
D
A
B
A
N
D
O
N
E
D
6 T
BD
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
F M
F M
F M
A
B
A
N
D
O
N
E
D
6 A
C
S
S
S
S
S
S
S
W
W
AIP
AIP
W
A I P
A I P
A I P
A I P
AIP
A I P
A I P
AIP
AIP AIP
AIP
A I P
A I P
A I P
A I P
W
AIP
W
W
W
W
W
H I
H I
H I
F W
W
W
W
W
A
B
A
N
D
O
N
E
D
6 A
C
W
W
F W
FW
FW
HI-21-17
A
B
A
N
D
O
N
E
D
8 A
C
W
F W
F W
F W
FW
FW
A
B
A
N
D
O
N
E
D
6 T
BD
W
W
W
S S
S S
S S
SS
SS
SS SS
S S
S S
S S
SS
SS
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S S
S S
S S
S S
S S
SS
S
S
S
S
S
C
O
C
O
OHE
U
B
W
O
O
D
U
W
O
O
D
U
W
O
O
D
U
W
O
O
D
U
I
F
W
O
O
D
N
A
W
O
O
D
N
A
W
O
O
D
U
A
W
O
O
D
U
I
F
W
O
O
D
U
I
F
W
O
O
D
U
A
W
O
O
D
X X
X X
R
N
C
LBS
4S10
MODI2
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X
X X
X
X X
X X
X X
X X
X
E
E
E
E
E
E
E
E
E
E
E
E
S
T
G
C
O
M
W
S
E
H
E
A
V
Y
Q
O
P
E
L
O
P
H
E
A
O
P
A
R
G
H
A
Z
M
A
T
SSI1
n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
ED-101
J
M
A Y
H E
W
M
M
A Y
H E
W
U L
I N
E
D
E M
O L
I T
I O
N
P
L A
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
PLAN
NORTH
N
SCALE:
U-LINE DEMOLITION PLAN 1
1" = 50'
FLAG NOTES:
1. REMOVE EXISTING OVERHEAD U-LINE BETWEEN POLES U10-1B AND U10-5A. CIRCUITS CONSIST OF (3) 1/C #2
OPEN WIRE, (1) 1/C #4 STATIC WIRE AND LOW VOLTAGE CIRCUITS. REMOVE ALL OVERHEAD CONDUCTORS, POLES, POLE MOUNTED EQUIPMENT, GUYS, ANCHORS AND ASSOCIATED HARDWARE.
2. REMOVE EXISTING POLE-MOUNTED 150KVA TRANSFORMER ON POLE U10-1A.
3. REMOVE EXISTING POLE-MOUNTED 75KVA TRANSFORMER ON POLE U10-2IF.
4. REMOVE EXISTING LOW VOLTAGE OVERHEAD FEED TO BLDG 1625. CIRCUIT: (1) 3/C 250MCM CABLE. REMOVE
ASSOCIATED 30' CONC POLE R17.
5. REMOVE EXISTING (2) WOOD POLES AND ASSOCIATED OVERHEAD LOW VOLTAGE CIRCUIT. CIRCUIT CONSISTS
OF (3) 1/C 250MCM. REMOVE EXISTING DOWN CONDUCTORS AND DISCONNECT SWITCH AT END-OF-LINE POLE.
RETAIN DISCONNECT SWITCH FOR REINSTALLATION.
6. SWMU C049 IS KNOWN TO CONTAIN SOIL CONTAMINANTS INCLUDING INDUSTRIAL WASTE PRODUCTS.
CONTRACTOR SHALL APPLY LAND USE CONTROLS TO WORK IDENTIFIED IN SWMU. ALL SOILS MUST BE
RETAINED ON SITE. WORKERS SHALL UTILIZE PROPER PPE AGAINST SOIL CONTAMINANT EXPOSURE. SEE
SPECIFICATION SECTION 01 57 19 REGARDING EXCAVATION, DIRECTIONAL DRILLING AND DEWATERING IN
THIS AREA.
PRIMARY_OH
U_LINE
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
SWMU C049
P R
I M
A R
Y
O H
U
L I N
E
S A
M U
E L
C
P
H I L L I P
S
P
K W
Y
PRIMARY_OH
U_LINE
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
MATCH LINE - SEE SHEET ED-102
M A
T C
H
L
I N
E
S
E
M A
T C
H
L
I N
E
S
E
P
M b a r v i r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S D
SD
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
A
B
A
N
D
O
N
E
D
T
B
D
A
B
A
N
D
O
N
E
D
6 T
BD
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
2 T
BD
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
10 A
C
A
B
A
N
D
O
N
E
D
4 T
B
D
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
SS
F M
F M
F M
F M
F M
F M
F M
F W
S
S
A I P
S
F W
C
O
C
O
W
W
W
W
W
W
W
W
AIP
AIP
AIP
AIP
W
W
W
W
W
W
W
A I P
A I P
A I P
A I P
W
A I P
A I P
A I P
A I P
A I P
W
AIP
A I P
A I P
W
W
W
W
W
W
H I
H I-15-07
HI-15-01
H I-15-04
W
W
W
A
B
A
N
D
O
N
6 A
C
W
FW
F W
W
W
FW
FW
FW
FW
F W
A
B
A
N
D
O
N
E
D
8 A
C
F W
S S
S S
S S
S S
SS
SS
SS
S S
SS
S S
S S
SS
SS
SS
SS
S S
S S
SS
SS
SS
S
S
S
O H
E
O H
E
U
W
O
O
D
U
I
F
W
O
O
D
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
U
I
F
W
O
O
D
U
E
W
O
O
D
U
I
F
U
A
I
P
U
G
E
MODI1
W
HSE2
U64-1
623-IF
O H
E
X
X
X
X
U G
E
S
U
P
P
S
E
O
P
T
I
C
U
I
P
W
H
S
E
S
U
P
P
L
Y
W
H
S
E
W
H
S
E
H
U
M
I
D
I
T
L
W
H
S
E
G
S
U
P
P
O
R
T
B
L
D
G
OEST
E n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
ED-102
J
M
A Y
H E
W
M
M
A Y
H E
W
U L
I N
E
D
E M
O L
I T
I O
N
P
L A
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
PLAN
NORTH
N
SCALE:
U-LINE DEMOLITION PLAN 2
1" = 50'
FLAG NOTES:
1. REMOVE EXISTING OVERHEAD U-LINE BETWEEN POLES U6-1IF AND U6-15. CIRCUITS CONSIST OF (3) 1/C #2
OPEN WIRE, (1) 1/C #4 STATIC WIRE AND LOW VOLTAGE CIRCUITS. REMOVE ALL OVERHEAD CONDUCTORS, POLES, POLE MOUNTED EQUIPMENT, GUYS, ANCHORS AND ASSOCIATED HARDWARE.
2. REMOVE EXISTING POLE-MOUNTED 3X37KVA TRANSFORMER ON POLE U6-3IF.
3. REMOVE EXISTING OVERHEAD LV SERVICE ENTRANCE BETWEEN POLE U6-4IF AND BLDG 1623.
4. REMOVE (2) EXISTING CIRCUITS AND POLE RISERS AT POLE U6-5E. CUT, CAP AND SEAL EXISTING CONDUITS
BELOW ASPHALT PAVING. ABANDON IN PLACE. PATCH ASPHALT FOLLOWING POLE REMOVAL.
5. POLE U6-1AIP: REMOVE AND RETAIN EXISTING POLE MOUNTED RECLOSER AND ASSOCIATED CONTROLS.
DELIVER RECLOSER TO CONTRACTING OFFICER.
P R
IM
A
R Y
O
H
U L
IN
E
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
S A
M U
E L
C
P
H I L L I P
S
P
K W
Y
SAB R
O
AD
P R
IM
A
R Y
O
H
U L
IN
E
M A
T C
H
L I N
E
S
E
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
MATCH LINE - SEE SHEET ED-101
P
M b a r v i r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x x x x x x x x x x x
S
D
S D x x
H
H
A x x
M
H
A x x
M
H
B x x
H
H
B x x
H
H
B
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
S D
O
F x
E
R C
P
A
B
A
N
D
O
N
E
D
6 T
BD
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
6 T
B
D
S
A I P
S
A I P
A
IP
AIP
A I P
AIP
AIP
A I P
A I P
W
W
W
W
HI-16-04
H I-16-05
W
W
W
W
W
W
W
W
W
W
W
W
W
W
F
W
F
W
H I
W
A
B
A
N
D
O
N
E
D
6" A
C
A
B
A
N
D
O
N
8 A
C
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
TBD
T
BD
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
TBD
T
BD
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
6" A
C
SS
SS
SS
S
S
S S
S S
SS
F M
S
L
O H
E
O H
E
OHE
O
H
E
U
I
F
W
O
O
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
U
W
O
O
D
U
W
O
O
D
U
I
F
W
O
O
D
U
I
F
W
O
O
D
U
W
O
O
D
U
W
O
O
D
U
I
F
W
O
O
D
U I F
U A
I F
U
G
E
U
G
E
MODI4
M
ODI3
SASI
GYM
SASC3
SASI2
GENI1
X
X
X
ESI
X
X
X
X X
X X
X X
X X
U
G
E
U
G
E
U
G
E
U
G
E
E
MH 572
LBS
H
EIV
M H
E
E
U
G
E
MH 574
UG
E
UG
E
U G
E
U
G
E
S
E
A
R
C
H
L
I
G
H
T
S
H
O
P
A
D
M
I
N
G
E
N
E
R
A
T
O
R
S
H
O
P
S
A
B
S
E
C
U
R
I
T
Y
G
Y
M
S
A
B
X
X
X
X
X
X
X
X
X
X X
MH 571
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
U G
E
U G
E
U G
E U
G
E n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
ED-103
J
M
A Y
H E
W
M
M
A Y
H E
W
U L
I N
E
D
E M
O L
I T
I O
N
P
L A
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
PLAN
NORTH
N
SCALE:
U-LINE DEMOLITION PLAN 3
1" = 50'
FLAG NOTES:
1. REMOVE EXISTING OVERHEAD U-LINE BETWEEN POLES U6-1IF AND U6-15. CIRCUITS CONSIST OF (3) 1/C #2
OPEN WIRE, (1) 1/C #4 STATIC WIRE AND LOW VOLTAGE CIRCUITS. REMOVE ALL OVERHEAD CONDUCTORS, POLES, POLE MOUNTED EQUIPMENT, GUYS, ANCHORS AND ASSOCIATED HARDWARE. REMOVE EXISTING
DOWN CONDUCTORS AND (3) 1/C #2 EPR PRIMARY FEED TO EXISTING TRANSFORMER GENI1.
2. REMOVE EXISTING POLE RISER AND CONDUCTORS BETWEEN POLE U6-8IF AND EXISTING TRANSFORMER ESI.
3. REMOVE EXISTING PAD-MOUNTED, 13.KV-208/120V, 150KVA TRANSFORMER ESI.
4. REMOVE EXISTING POLE-MOUNTED 3X50KVA TRANSFORMER ON POLE U6-9-1IF.
5. REMOVE EXISTING POLE, RISER AND CONDUCTORS BETWEEN POLE U6-9IF AND POLE U6-9-1IF.
6. REMOVE EXISTING POLE RISER AND CONDUCTORS BETWEEN POLE U6-12IF AND EXISTING TRANSFORMER
SASI2. DO NOT DISTURB EXISTING AREA LIGHTING POLE ADJACENT TO POLE U6-12IF.
7. REMOVE EXISTING PAD-MOUNTED, 13.KV-480/277V, 150KVA TRANSFORMER SASI
8. REMOVE EXISTING PAD-MOUNTED, 13.KV-480/277V, 225KVA TRANSFORMER SASI2.
9. REMOVE EXISTING (1) 3/C PILC CABLE BETWEEN LBS HEIV7/4 AND LBS CCIG3/2. ASSUMED PATH IS VIA
MANHOLES 572, 571, 570, AND 569.
10. SEE SHEET ED-106 FOR FEEDER REMOVAL BETWEEN LBS SASI AND LBS HECV6A.
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
SAB R
O
AD
P R
IM
A
R Y
O
H
U L
IN
E
M A
T C
H
L
I N
E
S
E
M A
T C
H
L
I N
E
S
E
E A
R T
H
S
T A
T I O
N
R
O A
D
P R
IM
A
R Y
O
H
U L
IN
E
P R
IM
A
R Y
O
H
U L
IN
E
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
MATCH LINE - SEE SHEET ED-105
MATCH LINE - SEE SHEET ED-106
P
M b a r v i r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x x
M
H x x
M
H
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
S D
H
I
W
W
W
W
W
W
W
W
W
W
W
W
W
H I
O
H
E
O
H
E
O
H
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
U
I
F
W
O
O
D
U
W
O
O
D
U
G
E
U
G
E
U
G
E
E
M
H
U
W
O
O
D
G
P
S
C
G
P
S
I
U
G
E
L
B
S
G
P
S
C
G
X
X
X
X
X
X
X
X
X
X
X
X
X n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
ED-104
J
M
A Y
H E
W
M
M
A Y
H E
W
U L
I N
E
D
E M
O L
I T
I O
N
P
L A
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
PLAN
NORTH
N
SCALE:
U-LINE DEMOLITION PLAN 4
1" = 50'
FLAG NOTES:
1. REMOVE EXISTING OVERHEAD U-LINE BETWEEN POLES U6-1IF AND U6-15. CIRCUITS CONSIST OF (3) 1/C #2
OPEN WIRE, (1) 1/C #4 STATIC WIRE AND LOW VOLTAGE CIRCUITS. REMOVE ALL OVERHEAD CONDUCTORS, POLES, POLE MOUNTED EQUIPMENT, GUYS, ANCHORS AND ASSOCIATED HARDWARE.
2. REMOVE EXISTING POLE-MOUNTED 15KVA TRANSFORMER ON POLE U6-13-IF. REMOVE EXISTING AREA
LIGHT FIXTURE.
3. REMOVE EXISTING 15KV CIRCUIT FEEDING TRANSFORMER GPSI4. CAP AND SEAL U/G CONDUITS BELOW
FINISHED GRADE. ABANDON EXISTING DUCT BANK IN PLACE.
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
P
R
I M
A
R
Y
O
H
U
L I N
E
M A
T C
H
L
I N
E
S
E
M E
R C
U R
Y
G
E M
I N
I
R
O A
D
P
R
I M
A
R
Y
O
H
U
L I N
E
O
LD P
RESS S
IT
E R O
AD
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
P
M b a r v i r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x x x x x x x xx x x x x x x x x
S
D
S
D x x
M
H
D x x
M
H
C x x x
M
H x x x
M
H x x
P
B
R
B
C
C
C
C
C
C C C C C C C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C C C C C
C C
C C C
A
B
A
N
D
O
N
E
D
6 A
C
A
B
A
N
D
O
N
E
D
6 T
BD
S
S
S
S
W
W
W
W
W W W W W
W
AIP
W
W
W
W
W
W
W
W
W
W W
W W
W
H I
H I
H I-22-11
W
W
FM FM
FM FM
FM FM
FM FM
FM FM
FM
S
S
S
S
S S
S S
S S
SS
SS
FM
FM
FM
FM
FM
FM
FM
FM
FM
L
UGE
UGE
UGE
U
G
E
U G
E
GFSI
HAND
HOLE
U
G
E
U
G
E
U G
E
U G
E
E
E
EXPOSED PIPE
LBS
CCCIG3
LBS
5N5
LBS
CCCV1
MH 569
I
E
B
L
D
G
P
E
S
S
H
O
P
C
O
T
L
O
P
S
MH 570
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
ED-105
J
M
A Y
H E
W
M
M
A Y
H E
W
H E
I V
L
I N
E
U
N D
E R
G R
O U
M
O L
I T
I O
N
P
L A
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
PLAN
NORTH
N
SCALE:
HEIV7-LINE UNDERGROUND DEMOLITION - PLAN 5
1" = 50'
FLAG NOTE:
1. REMOVE EXISTING (1) 3/C PILC CABLE BETWEEN LBS HEIV7/4 AND LBS CCIG3/2. ASSUMED PATH IS VIA
MANHOLES 572, 571, 570, AND 569.
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
MATCH LINE - SEE SHEET ED-103
M A
T C
H
L
I N
E
S
E
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
CENTRAL CONTROL ROAD
P
M b a r v i r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text x x x x x x x x x x
S
D
S D
S
D
S
D
S D
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
A
B
A
N
D
O
N
E
D
6 T
BD
A
B
A
N
D
O
N
TBD
T
BD
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
6 T
B
D
A I P
W
W
S
S
A I P
AIP
A I P
A I P
A I P
AIP
A I P
AIP
A
IP
AIP
A I P
A I P
A I P
AIP
H I
HI-16-04
H I-16-05
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
FW
F W
F W
F W
F
W
F
W
H I
W
W
H I
H I
W
A
B
A
N
D
O
N
8 A
C
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
TB
D
T
B
D
ABAN
D
O
N
6 A
C
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TBD
T
BD
A
B
A
N
D
O
N
E
D
2.5
IP
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
TB
D
T
B
D
ABAN
D
O
N
TB
D
T
B
D
SS
SS
SS
S S
S S
SS
SS
SS
S S
SS
S S
S S
S S
F M
F M
F M
S
S
S
S
LBS 4S17
M H
MH
SASI
SSF1
GYM1
SASC3
SASI2
ESI
MH 572
LBS
H
EIV
M H
E
E
E
E
U G
E
UG
E
UG
E
U
G
E
MH 574
MH 576
LBS
HEIGA
LBS
HEIGB
LBS
HECV6A/B
LA2IF2
LA2IF
UG
E
UG
E
U G
E
U
G
E
S
A
B
S
E
C
U
R
I
T
Y
G
Y
M
S
A
B
S
A
B
A
N
N
E
X
H
A
N
G
H
A
N
G
G
E
U G
E
U G
E U
G
E n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
ED-106
J
M
A Y
H E
W
M
M
A Y
H E
W
H E
I V
L
I N
E
U
N D
E R
G R
O U
M
O L
I T
I O
N
P L
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
PLAN
NORTH
N
SCALE:
HEIV7-LINE UNDERGROUND DEMOLITION - PLAN 6
1" = 50'
FLAG NOTE:
1. REMOVE EXISTING (1) 3/C 4/0 FEEDER BETWEEN LBS HEIV7/1 AND LBS HECV6A/4. ASSUMED PATH IS VIA MHs
572, 573, 574, 576.
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
SAB R
O
AD
P R
IM
A
R Y
O
H
U L
IN
E
M A
T C
H
L
I N
E
S
E
M A
T C
H
L
I N
E
S
E
E A
R T
H
S
T A
T I O
N
R
O A
D
P R
IM
A
R Y
O
H
U L
IN
E
P R
IM
A
R Y
O
H
U L
IN
E
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
MATCH LINE - SEE SHEET ED-103
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
P
M b a r v i r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S
D
S
D x x
H
H
E x x
M
H x x
M
H x x
M
H x x x
M
H x x
M
H
H x x
M
H
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
A
B
A
N
D
O
N
E
D
6 D
I
A
B
A
N
D
O
N
E
D
6 A
C
A
B
A
N
D
O
N
E
D
4 T
B
D
A
B
A
N
D
O
N
E
D
6 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
2 T
B
D
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
F M
F M
F M
A
B
A
N
D
O
N
E
D
6 A
C
S
S
S
S
S
S
S
W
W
AIP
AIP
W
A I P
A I P
A I P
A I P
AIP
A I P
A I P
AIP
AIP AIP
AIP
A I P
A I P
A I P
A I P
W
AIP
W
W
W
W
W
H I
H I
H I
F W
W
W
W
W
A
B
A
N
D
O
N
E
D
6 A
C
W
W
F W
FW
FW
HI-21-17
A
B
A
N
D
O
N
E
D
8 A
C
W
F W
F W
F W
FW
FW
A
B
A
N
D
O
N
E
D
6 T
B
D
W
W
W
S S
S S
S S
SS
SS
SS SS
S S
S S
S S
SS
SS
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S S
S S
S S
S S
S S
SS
S
S
S
S
S
C
O
C
O
OHE
U
B
W
O
O
D
U
W
O
O
D
U
W
O
O
D
U
W
O
O
D
U
I
F
W
O
O
D
N
A
W
O
O
D
N
A
W
O
O
D
U
A
W
O
O
D
U
I
F
W
O
O
D
U
I
F
W
O
O
D
U
A
W
O
O
D
R
N
C
LBS
4S14
LBS
4S10
6W5
W
W
4W
W
4W5
W
W
HSE3
AP1
SSI1
MH 1201
SECT
4S14-1
MODI2
UGE
E
E
E
E
E
UGE
U G
E
E
E
E
E
E
E
E
T
E
E
E
E
E
E
E
E
E
S
T
G
C
O
S
E
H
E
A
O
P
E
L
O
P
H
E
A
O
P
A
R
G
H
A
Z
M
A
T
SSI1
U G
E
U G
E
U G
E
UGE
U G
E
EE
F W
F W
F W
S S
SS
S
C
O
E
E
E
E
E
E
E
E
E
E
E n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
EC-101
J
M
A Y
H E
W
M
M
A Y
H E
W
S
L
I N
E
U
N D
E R
G R
O U
E
C T
R I C
A L
N
L A
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
PLAN
NORTH
N
FLAG NOTES:
1. CONFIRM FIELD CONDITIONS INCLUDING UNDERGROUND UTILITY LOCATIONS PRIOR TO LOCATING NEW
8' X 8' X 8' MH 1201.
2. INSTALL NEW 6-WAY, SOLID DIELECTRIC LBS 4S14:
4S14/1: (3) 1/C 4/0 15KV EPR CONDUCTORS FROM EXISTING LBS 4S10/2 TO NEW
LBS 4S14/1 VIA NEW MH 1201.
4S14/2: SPARE
4S14/3: SPARE
4S14/4: (3) 1/C #2 15KV EPR CONDUCTORS FROM NEW LBS 4S14/4 TO NEW 150KVA
TRANSFORMER WHSE3
4S14/5: (3) 1/C #2 15KV EPR CONDUCTORS FROM NEW LBS 4S14/5 TO EXISTING
TRANSFORMER SSI1 (SIGN SHOP).
4S14/6: SPARE
3. INSTALL NEW PAD MOUNTED 13.2KV-208/120V, 150KVA, 3 PHASE TRANSFORMER WHSE3.
4. INSTALL 2W5 DUCT FROM NEW MH 1201 TO EXISTING LBS 4S10.
5. INSTALL 6W5 DUCT FROM NEW MH 1201 TO NEW LBS 4S14.
6. INSTALL 2W5 DUCT FROM NEW MH 1201 TO NEW TRANSFORMER WHSE3.
7. INSTALL (1) 2 1/2"C-SPARE AND (1) 2 1/2"C WITH (3) 250 MCM, (1) 250 MCM NEUTRAL THHN/THWN. REMOVE
EXISTING WEATHERHEAD. CUT EXISTING 2 1/2"C AND USE EXISTING WALL PENETRATION TO RE-FEED
SERVICE ENTRANCE TO EXISTING PANEL P-1. CAP SPARE AT EXTERIOR OF BLDG 1625.
8. INSTALL (1) 3/4"C, (3) #8, (1) #8 NEUTRAL SERVICE ENTRANCE TO EXISTING 30A DISCONNECT SWITCH ON
EXTERIOR OF BLDG 49820.
9. INSTALL 2"C (PVC) FROM NEW TRANSFORMER WHSE3 TO NEAR POLE U10-3. INTERCEPT EXISTING 2"C
NEAR POLE U10-3. INSTALL NEW SERVICE ENTRANCE (3) #4/0, (1) #4/0 NEUTRAL TO J-BOX AT NW
CORNER OF BLDG 1628.
10. EXTEND 2W4 TO EXISTING TRANSFORMER SSI1. RE-FEED EXISTING TRANSFORMER SSI1 WITH NEW (3)
1/C #2 FROM LBS 4S14/5.
11. INSTALL NEW PAD MOUNTED 480V-208/120V, 75KVA, 3 PHASE, DETLA-WYE TRANSFORMER AP1. INSTALL
(3) #2, (1) #6 GND IN 1 1/4" CONDUIT FROM SSI1 SECONDARY TO NEW TRANSFORMER AP1.
12. RELOCATE AND RE-USE EXISTING 200A, 3P DISCONNECT SWITCH AT EXISTING END-OF-LINE POLE.
PROVIDE AND INSTALL CONC PAD AND PEDESTAL MOUNT FOR RELOCATED SWITCH. SEE DETAIL D, SHEET E-506. INTERCEPT EXISTING SERVICE ENTRANCE TO BUILDING 49835. RE-FEED BLDG 49835
FROM TRANSFORMER AP1 THROUGH 200A DISCONNECT SWITCH.
13. SWMU C049 IS KNOWN TO CONTAIN SOIL CONTAMINANTS INCLUDING INDUSTRIAL WASTE PRODUCTS.
CONTRACTOR SHALL APPLY LAND USE CONTROLS TO WORK IDENTIFIED IN SWMU. ALL SOILS MUST BE
RETAINED ON SITE. WORKERS SHALL UTILIZE PROPER PPE AGAINST SOIL CONTAMINANT EXPOSURE.
SEE SPECIFICATION SECTION 01 57 19 REGARDING EXCAVATION, DIRECTIONAL DRILLING AND
DEWATERING IN THIS AREA.
14. NOTE: BLDG 49835 IS SCHEDULED FOR DEMOLITION. DISREGARD FLAG NOTE 11 AND 12 AND DETAIL D IF
FACILITY HAS BEEN REMOVED.
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
SWMU C049
S A
M U
E L
C
P
H I L L I P
S
P
K W
Y
N
TRUE
NORTH
EC-104
EC-103
EC-102
EC-101 EC-105
1 1/4"C, (3) #2, (1) #6 GND
EXISTING 2"C:
NEW (3) #4/0, (1) #4/0 NEUT
EC-106
N
TRUE
NORTH
60'40'20'0'20'
GRAPHIC SCALE 1" = 20'
SEE ENLARGED
VIEW - MH1201
THIS SHEET
SCALE:
4S14 LINE UNDERGROUND ELECTRICAL - NEW - PLAN 1
1" = 50'
SCALE:
ENLARGED VIEW - MH1201
1" = 20'
MH
LBS
4S10
LBS
4S14
WHSE3
S T
G
6W5
W
W
4W
2"C,
(3) #4/0,
(1) #4/0 NEUT
3/4"C, (3) #8, (1) #8 NEUT
(2) 2 1/2"C,
(3) 250 MCM
(1) 250 MCM NEUT
(1) SPARE CONDUIT
04A
03 04
R E
P A
G
H
V
O L
T A
C
T
B
A N
K
L A
U N
M
P L
A
D S
EC-107
D
E-506
DISCONNECT SWITCH
SUPPORT DETAIL
M A
T C
H
L
I N
E
S
E
MATCH LINE - SEE SHEET EC-102
STA 4+75
NEW SECT 4S14-1
S
TA
N
E W
M H
S
TA
R
T O
F D
U C
TB
A
N K
S
TA
E
N D
O F
D U
C T
B A
N K
SCALE:
KEY PLAN - NEW
NONE
04A
P
M b a r v i r
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S D
SD
x x
M
H
F x x
M
H
G x x
M
H x x x
M
H x x
M
H
E x x
M
H x x x
M
H
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
2 T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TBD
T
BD
A
B
A
N
D
O
N
E
D
10 A
C
A
B
A
N
D
O
N
E
D
4 T
B
D
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
6 T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
TB
D
T
B
D
A
B
A
N
D
O
N
E
D
8 A
C
SS
F M
F M
F M
F M
F M
F M
F M
F W
S
S
S
A I P
S
F W
C
O
C
O
W
W
W
W
W
W
W
AIP
AIP
AIP
W
W
W
W
W
A I P
A I P
W
A I P
A I P
A I P
A I P
W
AIP
A I P
W
W
W
W
W
H I
H I-15-07
HI-15-01
H I-15-04
W
W
W
A
B
A
N
D
O
N
6 A
C
W
FW
F W
W
W
FW
FW
FW
FW
A
B
A
N
D
O
N
E
D
8 A
C
F W
S S
S S
S S
SS
SS
SS
SS
S S
S S
SS
SS
SS
SS
S S
S S
SS
SS
SS
S
S
S
O
HE
LBS 4S15
U
G
E
UGE
M H
MH
6W
W
2W
4W
6W
W
W
4W
W
4W
W
M
ODI1
W
HSE2
U64-1
623-IF
U
G
E
O H
E
U G
E
E
E
E
U G
E
4W
E
S
U
P
P
S
E
O
P
T
I
C
U
I
P
W
H
S
E
S
U
P
P
L
Y
W
H
S
E
W
H
S
E
H
U
M
I
D
I
T
L
W
H
S
E
G
S
U
P
P
O
R
T
B
L
D
G
OEST
E
LBS 4S9
M H 2 n g i n e e r i n g I n c
L L
E N
E A
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
EC-102
J
M
A Y
H E
W
M
M
A Y
H E
W
S
L
I N
E
U
N D
E R
G R
O U
E
C T
R I C
E
W
P
L A
N
C
H
A R
T N
E T
T
D B
G
B
E A
R D
D B
C C
A F
S
F
L
FLAG NOTES:
1. INTERCEPT EXISTING U/G FEED FROM 4S9/3 TO POLE U6-1IF. EXTEND FEED TO NEW LBS 4S15/1 VIA
NEW MH 1202. INSTALL NEW (3) 1/C 4/0 FROM 4S9/3 TO 4S15/1.
2. INSTALL NEW 6-WAY, SOLID DIELECTRIC LBS 4S15:
4S15/1: (3) 1/C 4/0 15KV EPR CONDUCTORS FROM EXISTING LBS 4S9/3 TO NEW LBS 4S15/1 VIA NEW
MH 1202.
4S15/2: (3) 1/C 4/0 15KV EPR CONDUCTORS FROM NEW LBS 4S15/2 TO NEW LBS 4S16/1.
4S15/3: (3) 1/C #2 15KV EPR CONDUCTORS FROM NEW LBS 4S15/3 TO EXISTING 150KVA
TRANSFORMER OEST AT BLDG 49841 .
4S15/4: (3) 1/C #2 15KV EPR CONDUCTORS FROM NEW LBS 4S15/4 TO NEW 75KVA TRANSFORMER
WHSE2.
4S15/5: (3) 1/C #2 15KV EPR CONDUCTORS FROM NEW LBS 4S15/5 TO EXISTING TRANSFORMER
U64-1623.
4S15/6: SPARE
3. INSTALL NEW PAD MOUNTED 13.2KV-208/120V, 75KVA, 3 PHASE, DELTA-WYE TRANSFORMER WHSE2.
4. CONFIRM FIELD CONDITIONS INCLUDING UNDERGROUND UTILITY LOCATIONS PRIOR TO LOCATING NEW
8' X 8' X 8' MH 1202.
5. INSTALL 4W5 DUCT FROM NEW MH 1202 TO NEW MH 1203.
6. INSTALL (1) 2 1/2"C-SPARE AND (1) 2 1/2"C WITH (3) 250 MCM, (1) 250 MCM NEUTRAL THHN/THWN.
REMOVE EXISTING WEATHERHEAD. CUT EXISTING 2 1/2"C AND USE EXISTING WALL PENETRATION TO
RE-FEED SERVICE ENTRANCE TO EXISTING PANEL P-1. CAP SPARE AT EXTERIOR OF BLDG 1623.
7. INSTALL 2W5 DUCT FROM NEW MH 1203 TO EXISTING TRANSFORMER MODI1. RE-FEED MODI1 WITH (3)
1/C #2 15KV EPR CONDUCTORS FROM NEW LBS 4S16/3.
8. INSTALL REPLACEMENT SERVICE ENTRANCE TO BLDG.49831. INSTALL 2 1/2"C WITH (3) 250 MCM, (1) 250
MCM NEUTRAL THHN/THWN FROM TRANSFORMER WHSE2 TO EXISTING SE DISCONNECT SWITCH.
150'50'0'50' 100'
GRAPHIC SCALE 1" = 50'
S A
M U
E L
C
P
H I L L I P
S
P
K W
Y
SAB R
O
AD
M A
T C
H
L I N
E
S
E
PLAN
NORTH
N
SCALE:
4S15 LINE UNDERGROUND ELECTRICAL - NEW - PLAN 2
1" = 50'
N
TRUE
NORTH
(2) 2 1/2"C:
(3) 250 MCM
(1) 250 MCM NEUT
(1) SPARE CONDUIT
2 1/2"C,
(3) 250 MCM
(1) 250 MCM NEUT
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .