Attch_11_Repair_F_G_and_J_Lines_SWPPP_Sheets.pdf
PDF 297 KB Posted
- Solicitation number
- FA2521-17-B-0001
About this file
Attachment 11 SWPPP Sheets for Repair FGJ Lines 2 pages, dated 14 Apr 17
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U S
A F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
B
I
T
D
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
C
O
F
A
D
R
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L E
N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G-005
A
R
O M
A N
L
C
O L
E M
A N
S T
O R
M W
A T
P
L L U
T I O
N
P
R E
V E
N T
I O
N
P L A
N
N
O T
E S
L
C
O L
E M
A N
D B
H
G
B
E A
R D
R E
P A
G
J
I N
E S
D B
C C
A F
S
F
L
SITE DESCRIPTION
OWNER AND ADDRESS: UNITED STATES AIR FORCE
1224 JUPITER STREET, BUILDING 534
PATRICK A.F.B., FLORIDA 32925
LOCATION: CAPE CANAVERAL AIR FORCE STATION
LATITUDE: 28° 30' 47" N LONGITUDE: 80° 34' 19" W
SECTION / TOWNSHIP / RANGE: 8 / 23 S / 38 E
PROJECT NAME: REPAIR F, G, J LINES
PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF EXCAVATION WORK
FOR THE INSTALLATION OF NEW UNDERGROUND UTILITIES.
SITE MAPS:
* CONSULT ASSOCIATED PLANS FOR EROSION AND SEDIMENT CONTROLS,
STORMWATER DISCHARGE POINTS LOCATION OF SURFACE WATER AND
CONSTRUCTION IMPACT.
SITE AREA:
1. TOTAL AREA OF SITE = 25 AC
2. TOTAL AREA DISTURBANCE = 10 AC
3. WETLAND AREA = NONE
4. RECEIVING WATER = BANANA RIVER
CERTIFICATION OF COMPLIANCE WITH FEDERAL,
STATE AND LOCAL REGULATIONS
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL
LAWS REGARDING EROSION AND TURBIDITY CONTROLS, THE FOLLOWING
PERMITS HAVE BEEN OBTAINED AND ARE AVAILABLE ON-SITE:
D.E.P. PERMIT: NONE
C.O.E. PERMIT: NONE
S.J.R.W.M.D. E.R.PERMIT: NONE
D.E.P. N.O.I.: TO BE SUBMITTED BY CONTRACTOR
SEQUENCE OF MAJOR ACTIVITIES
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. SUBMIT NOTICE OF INTENT (N.O.I.)
2. FLAG THE WORK LIMITS & MARK TREE OR PROTECTED AREA BUFFER, IF
APPLICABLE.
3. COORDINATE PRE-CONSTRUCTION MEETING WITH DESIGNATED SITE
SUPERINTENDENT AND INSPECTOR(S) IN CHARGE OF SWPPP REQUIREMENTS
4. INSTALL REQUIRED PERIMETER CONTROLS
5. PERFORM DEMOLITION OPERATIONS, IF APPLICABLE.
6. INSTALL STRUCTURES
7. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE
8. INSTALL PERMANENT SEEDING/SODDING AND PLANTING AND WATER AS
REQUIRED UNTIL PERMANENTLY ESTABLISHED
9. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS
STABILIZED, COORDINATE INSPECTION OF ALL WORK AREAS.
10. REMOVE ANY EROSION CONTROL DEVICES AND RESEED/SOD AS REQUIRED.
11. SUBMIT NOTICE OF TERMINATION (N.O.T.)
CONSTRUCTION CONTRACTOR REQUIREMENTS
IN ADDITION TO THE RESPONSIBILITIES OUTLINED IN THE ABOVE SECTIONS, IT IS
ALSO THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
FOLLOWING IS CONDUCTED:
* N.O.I. FORM IS COMPLETED AND SUBMITTED WITH APPROPRIATE FEE AT LEAST
48 HOURS PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY
* CONSTRUCTION CONTRACTOR AND ALL CONSTRUCTION SUB-CONTRACTORS
COMPLETE CERTIFICATION SIGNIFYING THAT THEY ARE AWARE OF TERMS AND
CONDITIONS OF THE GENERIC PERMIT
* CHANGES TO SWPPP ARE COMPLETED, AS NEEDED, TO ENSURE COMPLIANCE
WITH FEDERAL, STATE AND LOCAL REQUIREMENTS AND THE REPORT FORM
FOR CHANGES TO SWPPP IS COMPLETED, WHEN NECESSARY.
* SITE INSPECTIONS ARE PERFORMED AND THE INSPECTION REPORT FORM
COMPLETED AS INDICATED BY PLAN BY CONSTRUCTION CONTRACTOR'S
QUALIFIED INSPECTOR.
* MAINTENANCE ON BMPs AND MAINTENANCE RECORD COMPLETED AS
INDICATED BY PLAN.
* N.O.T. FORM IS COMPLETED AND SUBMITTED AS INDICATED BY PLAN.
IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE
BEST MANAGEMENT PRACTICES (BMPs) AS SHOWN ON THE SITE PLAN AND AS
CONTAINED IN THIS SWPPP. IT IS ALSO THE CONSTRUCTION CONTRACTOR'S
RESPONSIBILITY TO ENSURE THESE BMPs ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED
WATER FROM LEAVING THE PROJECT SITE. THE CONSTRUCTION CONTRACTOR
SHALL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON THE SITE
PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED TO ENSURE
THE SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY
CONTROL REQUIREMENTS. BEST MANAGEMENT PRACTICES SHALL BE
IMPLEMENTED BY THE CONSTRUCTION CONTRACTOR AS REQUIRED TO MEET
THE SEDIMENT AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE
BY THE REGULATORY AGENCIES.
THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION,
MITIGATION, & REPAIR COSTS ASSOCIATED WITH NON-COMPLIANCE. IT IS THE
CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL
MEASURES TO ATTAIN IMMEDIATE COMPLIANCE, SHOULD VIOLATIONS BE
IDENTIFIED.
EROSION AND SEDIMENT CONTROLS
PERIMETER CONTROLS:
1. SILT FENCE: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING
LIMITATIONS:
A. WHERE THE MAXIMUM DRAINAGE AREA IS 1/4 ACRE PER 100 FEET OF
LENGTH.
B. USE 4"x4" TRENCH & 8" FABRIC EXTENDED INTO GROUND BEFORE BACKFILL
& COMPACTION.
C. MAXIMUM USEFUL LIFE 6 MONTHS.
SWALE / LIVE STREAM SILT / SEDIMENT CONTAINMENT:
1. SEE FDOT INDEX 102, CHART 1, SHEET 1 FOR SPACING REQUIREMENTS FOR
TYPE I AND II SYNTHETIC BALE BARRIERS & SILT FENCES.
2. TURBIDITY CURTAINS SHALL BE LOCATED PARALLEL TO FLOW OF A MOVING
BODY OF WATER & SHALL NOT BE PLACED ACROSS THE MAIN FLOW OF A
SIGNIFICANT BODY OF MOVING WATER.
3. SOIL PARTICLES SHALL BE ALLOWED TO SETTLE A MINIMUM OF 6-12 HOURS
BEFORE REMOVAL OF TURBIDITY CURTAIN.
4. LAND DISTURBING ACTIVITY SHALL NOT CREATE VIOLATIONS OF WATER
QUALITY STANDARDS. MONITORING OF TURBIDITY LEVELS SHALL OCCUR IN
ACCORDANCE WITH PERMIT CONDITIONS.
STOCKPILING MATERIAL:
1. NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS
TO DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT
WATER BODY OR STORM WATER COLLECTION FACILITY.
VEGETATION:
1. TEMPORARY STABILIZATION SHALL BE APPLIED TO AREAS OPENED BY
CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE
RE-DISTURBED AND RECEIVE FINAL STABILIZING TREATMENT WITHIN 14 DAYS.
IF, AFTER 14 DAYS FROM TIME OF STABILIZATION, THE TEMPORARY GRASSED
AREAS HAVE NOT ATTAINED A MINIMUM OF 70% GOOD GRASS COVER, THE
AREA WILL BE REWORKED AND ADDITIONAL MEASURES APPLIED SUFFICIENT TO
ESTABLISH THE DESIRED VEGETATIVE COVER.
2. PERMANENT STABILIZATION SHALL BE PERFORMED IN ALL AREAS THAT
HAVE BEEN DISTURBED BY CONSTRUCTION ACTIVITY UNLESS OTHERWISE
DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE FUNCTION OF
CRITICAL SCRUB HABITAT. FINAL STABILIZATION MUST BE INITIATED NO MORE
THAN 7 DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED IN THAT AREA.
UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE PERMITTED TO CAUSE
A DEGRADATION OF OFFSITE WATER QUALITY. IF SEED IS USED THE SEEDING
MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH
SEASONAL VEGETATION. SLOPES STEEPER THAN 4:1 SHALL BE SODDED.
3. DISTURBED SIDE SLOPES OF DRAINAGE CONVEYANCE SWALES OR
SURFACE WATERS SHALL BE IMMEDIATELY SODDED. SOD SHALL BE PEGGED
OR STAPLED TO RESIST WASHOUT.
4. CONSTRUCTION CONTRACTOR SHALL STABILIZE COMPLETED PORTIONS OF
THE PROJECT AS WORK PROGRESSES TO PROTECT AGAINST EROSION UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE
FUNCTION OF CRITICAL SCRUB HABITAT. CONSTRUCTION CONTRACTOR SHALL
IMMEDIATELY REPAIR, FILL AND SOD ERODED AREAS OF THE PROJECT THAT
RESULT FROM THE CONSTRUCTION LAND ALTERATIONS.
5. ALL AREAS THAT ARE SEEDED/SODDED SHALL BE INSTALLED AND
WATERED UNTIL THE GROUND COVER IS FULLY ESTABLISHED.
POLLUTANT SOURCE CONTROLS:
WASTE DISPOSAL:
1. WASTE MATERIALS AND RUBBISH SHALL BE COLLECTED AND STORED IN
CONTAINERS OR, IF APPROPRIATE, IN PILES. SEPARATE, SELF-CLOSING,
NONFLAMMABLE, NON-REACTIVE CONTAINERS SHALL BE USED FOR GARBAGE.
OILY FLAMMABLE AND DANGEROUS WASTES, NON-SALVAGE MATERIAL AND
DEBRIS SHALL BE REMOVED FROM WORK AREAS AND DISPOSED OF DAILY. THE
CONSTRUCTION CONTRACTOR SHALL USE A LANDFILL OUTSIDE OF THE BASE
FOR DISPOSAL OF CCAFS AND PAFB C&D IN ACCORDANCE WITH FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PERMITS.
2. ASBESTOS WASTE SHALL BE DISPOSED OF OUTSIDE OF THE BASE IN
ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REGULATIONS.
3. PORTIONS OF THE PROJECT INCLUDE REMOVING AND REPLACING CABLE
ALONG EXISTING DUCT BANKS. THE CONTRACTOR SHOULD BE AWARE THAT
THERE IS POTENTIAL ORANGEBURG PIPING IN/AROUND OLDER DUCT BANKS ON
THE INSTALLATION. IF ORANGEBURG PIPE IS KNOWN TO EXIST, THE
CONTRACTOR MAY ABANDON THE PIPING IN PLACE AND NOTIFY THE
INSTALLATION ENVIRONMENTAL COMPLIANCE OFFICE OF ITS PRESENCE. IF
ORANGEBURG PIPING IS DISCOVERED OR PULLED, THE CONTRACTOR SHALL
MAINTAIN THE PIPING ON SITE AND NOTIFY THE INSTALLATION ENVIRONMENTAL
COMPLIANCE OFFICE OF INTENT TO ABANDON THE PIPING IN PLACE OR
COORDINATE WASTE REMOVAL.
4. REFER TO SPECIFICATIONS FOR FURTHER WASTE AND DISPOSAL AND
RECORD KEEPING REQUIREMENTS.
HAZARDOUS / NON HAZARDOUS:
1. ALL HAZARDOUS WASTE SHALL BE MANAGED IN ACCORDANCE WITH STATE
AND FEDERAL REGULATIONS, INCLUDING 45 SW OPLAN 19-14, BY THE
CONSTRUCTION CONTRACTOR AND SHALL BE TURNED OVER TO THE AIR FORCE
FOR DISPOSAL UNDER THE AIR FORCE'S EPA IDENTIFICATION NUMBER.
2. AT THE PRE-CONSTRUCTION CONFERENCE, THE CONSTRUCTION
CONTRACTOR SHALL PROVIDE THE CONTRACTING OFFICER WITH A LIST OF ALL
HAZARDOUS MATERIALS TO BE INCORPORATED INTO THE PROJECT INCLUDING
THE MATERIAL SAFETY DATA SHEET IN ACCORDANCE WITH DFARS 52.223-3,
HAZARDOUS WASTE MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
AND PROJECT SPECIFICATIONS. THE CONSTRUCTION CONTRACTOR SHALL
SUBMIT COPIES OF SIGNED INTERNAL MANIFESTS TO THE CONTRACTING
OFFICER MONTHLY.
3. THE CONSTRUCTION CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY IF ANY CONTAMINATED SOIL, GROUND WATER OR
SUSPECT DEBRIS IS ENCOUNTERED DURING EXCAVATION, DEMOLITION OR
CONSTRUCTION OF THE PROJECT.
SANITARY WASTE:
1. ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS
AS NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE SHALL BE
COLLECTED AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL
WASTE DISPOSAL REGULATIONS FOR SANITARY SEWER.
OFFSITE VEHICLE TRACKING:
1. A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED, WHERE
NECESSARY, TO HELP REDUCE VEHICLE TRACKING OF SEDIMENT. THE PAVED
STREET ADJACENT TO THE SITE ACCESS SHALL BE SWEPT DAILY TO REMOVE
ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS
HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED WITH
A TARPAULIN.
FERTILIZERS, PESTICIDES, HERBICIDES:
1. THE SPECIFIED REQUIREMENT FOR FERTILIZERS, PESTICIDES, AND
HERBICIDES SHALL BE IDENTIFIED. THE QUANTITIES AND METHODS OF
APPLICATION SHALL BE CHECKED TO ASCERTAIN THEY ARE APPROPRIATE AND
CONSISTENT WITH LOCAL GUIDELINES.
GOOD HOUSEKEEPING:
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED
ONSITE DURING THE CONSTRUCTION PROJECT:
1. ALL CONSTRUCTION EQUIPMENT SHALL BE IN PROPER WORKING ORDER
AND INSPECTED REGULARLY. ALL EQUIPMENT SHALL HAVE THE BUILT-IN
CAPACITY, STABILITY, AND NECESSARY SAFETY FEATURES TO FULLY COMPLY
WITH THE PROJECT SPECIFICATIONS AND REQUIREMENTS, WITHOUT SHOWING
EVIDENCE OF UNDUE STRESS OR FAILURE. CONSTRUCTION CONTRACTOR
PERSONNEL SHALL BE IN SUFFICIENT NUMBER OF COMPETENT WORKERS ON
THE JOB AT ALL TIMES TO INSURE WORK IS MADE A TIMELY AND SATISFACTORY
MANNER. A COMPETENT AND EXPERIENCED SUPERVISOR, REPRESENTING THE
CONSTRUCTION CONTRACTOR, SHALL BE IN DIRECT CHARGE AND CONTROL OF
OPERATIONS AT ALL TIMES. EQUIPMENT BREAKDOWNS OR OTHER
UNFORESEEN WORK STOPPAGES SHALL IMMEDIATELY CONSIDER THE
PROTECTION OF SURFACE WATERS FROM POTENTIAL POLLUTION.
2. DRIP PANS SHALL CONTAIN LEAKS OR SPILLS WHENEVER NECESSARY FOR
MAINTENANCE ACTIVITIES. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
3. AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS
REQUIRED TO DO THE JOB.
4. ALL MATERIALS STORED ONSITE SHALL BE STORED IN NEAT, ORDERLY
MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A
ROOF OR OTHER ENCLOSURE.
5. PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
ORIGINAL MANUFACTURER'S LABEL.
6. SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
7. WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE
DISPOSING OF THE CONTAINER.
8. MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL
SHALL BE FOLLOWED.
INSPECTION AND MAINTENANCE PLAN
INSPECTION AND MAINTENANCE REPORTS:
1. THE CONSTRUCTION CONTRACTOR'S QUALIFIED INSPECTOR SHALL INSPECT
ALL POINTS OF DISCHARGE INTO SURFACE WATERS, ALL DISTURBED AREAS OF
CONSTRUCTION THAT HAVE NOT BEEN FINALLY STABILIZED, AREAS OF
STORAGE MATERIALS THAT ARE EXPOSED TO PRECIPITATION, STRUCTURAL
CONTROLS AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT
LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE
END OF A STORM THAT IS 0.50 INCHES OR GREATER. WHEN THE SITE HAS BEEN
FINALLY STABILIZED, THE INSPECTION SHALL OCCUR AT LEAST MONTHLY. ALL
INSPECTIONS SHALL BE DOCUMENTED IN THE SWPPP USING THE SWPPP
INSPECTION REPORT FORM.
2. THE EROSION CONTROL SHALL BE MAINTAINED IN GOOD AND EFFECTIVE
OPERATING CONDITIONS, AND REPAIR TO IMPACTED SYSTEMS SHALL BE
INITIATED AND COMPLETED IMMEDIATELY. WHERE EROSION CONTROL
MEASURES ARE DEEMED INEFFECTUAL BY THE CONSTRUCTION CONTRACTOR,
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE OR THE CONTRACTING
OFFICER, THE CONSTRUCTION CONTRACTOR SHALL IMMEDIATELY COORDINATE
CORRECTIVE MEASURES FOR REPAIR AND REPLACEMENT. ALL REGULAR AND
SPECIAL MAINTENANCE SHALL BE RECORDED IN THE SWPPP ON THE
MAINTENANCE REPORT FORM. ALTERNATIVE MEASURES, REPAIRS, AND
REPLACEMENT SHALL BE IMMEDIATELY IMPLEMENTED AND RECORDED WITH
THE FORM FOR CHANGES TO THE SWPPP. IN NO CASE SHALL IMPLEMENTATION
OF THE REPAIR OR REPLACEMENT OCCUR MORE THAN 7 CALENDAR DAYS
FOLLOWING THE INSPECTION.
3. THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE'S QUALIFIED
INSPECTORS SHALL PERIODICALLY REVIEW THE CONSTRUCTION
CONTRACTOR'S INSPECTION REPORTS FOR ADEQUACY AND COMPLETION AND
REPORT IN WRITING, TO THE CONTRACTING OFFICER ANY DEFICIENCIES IN THE
REPORTING. THE CONSTRUCTION CONTRACTOR SHALL ADJUST THE
REPORTING REQUIREMENTS TO THE SATISFACTION OF THE CONTRACTING
OFFICER. THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE REPORTS
SHALL ALSO BE MADE A RECORD OF THE SWPPP.
4. ALL REPORTS, PLANS, AND AMENDMENTS SHALL BE MADE PART OF THE
SWPPP. SUCH REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE.
WHEN A REPORT DOES NOT IDENTIFY ANY INCIDENCES OF NONCOMPLIANCE,
THE REPORT SHALL CONTAIN A CERTIFICATION THAT THE FACILITY IS IN
COMPLIANCE WITH THE SWPPP AND GENERIC PERMIT. THE REPORT SHALL BE
SIGNED IN ACCORDANCE WITH THE GENERIC PERMIT.
NON-STORM WATER DISCHARGES
DEWATERING DISCHARGES:
1. DEWATERING ACTIVITIES ARE SUBJECT TO REVIEW OF THE JURISDICTIONAL
STATE AGENCIES, THE CONTRACTING OFFICER AND UNITED STATES AIR FORCE
ENVIRONMENTAL AND IRP OFFICES. DISCHARGES SHALL PROVIDE PROVISIONS
SO THAT NO UPSTREAM FLOODING OR IMPOUNDMENT OCCURS AND NO
SILTATION, EROSION, OR TURBID DISCHARGES OCCURS IN VIOLATION OF STATE
WATER QUALITY STANDARDS. ALL TEMPORARY WORKS SHALL BE COMPLETELY
REMOVED AND ALL AREAS RESTORED TO GRADES, ELEVATIONS AND
CONDITIONS THAT OCCURRED BEFORE CONSTRUCTION AS SOON AS POSSIBLE.
2. IT IS NOTED HERE THAT GROUNDWATER DEWATERING ACTIVITIES AT
CONSTRUCTION SITES CANNOT BE CONDUCTED UNDER THE GENERIC PERMIT
FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION
ACTIVITIES. PURSUANT TO SECTION 62-621.300(2, FAC, A SEPARATE PERMIT,
ENTITLED, GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND
WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY, MUST BE APPLIED FOR
TO CONDUCT GROUND WATER DEWATERING ACTIVITIES, IF NECESSARY.
TERMINATION PLAN
1. WHEN THE SITE HAS BEEN FINALLY STABILIZED AND ALL STORMWATER
DISCHARGES FROM CONSTRUCTION SITES ELIMINATED, THE CONSTRUCTION
CONTRACTOR SHALL SUBMIT A NOTICE OF TERMINATION (N.O.T.) WITHIN 14
DAYS OF FINAL STABILIZATION WITH A SUFFICIENT AMOUNT OF ESTABLISHED
PERMANENT VEGETATION.
2. AFTER FILING N.O.T., THE CONSTRUCTION CONTRACTOR SHALL SUBMIT THE
FINAL SWPPP, INCLUDING ALL REPORTS AND RECORDS, TO THE CONTRACTING
OFFICER. THE OWNER SHALL THEN BE RESPONSIBLE TO RETAIN A COPY OF
THE POLLUTION PREVENTION PLAN FOR A PERIOD OF THREE YEARS FROM THE
DATE THE SITE IS FINALLY STABILIZED.
CERTIFICATION:
"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY
WITH, THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL
CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION
PLAN PREPARED THEREUNDER."
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
B
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
C
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L E
N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
G-006
A
R
O M
A N
L
C
O L
E M
A N
S T
O R
M W
A T
P
L L U
T I O
N
P
R E
V E
N T
I O
N
P L A
N
D
E T
A I L
L
C
O L
E M
A N
D B
G
B
E A
R D
R E
P A
G
J
I N
E S
D B
C C
A F
S
F
L
SILT FLOW
M
I N
FILTER FABRIC
ELEVATION
SECTION
EROSION CONTROL NOTES:
1. AFTER EACH STORM EVENT, THE SILT FENCE SHALL BE INSPECTED. SEDIMENT DEPOSITS SHALL BE REMOVED AND
WASHOUTS/STRUCTURAL FAILURES SHALL BE REPAIRED IMMEDIATELY.
2. TWO SILT FENCES SHALL BE ATTACHED BY PLACING THE END POST OF THE SECOND FENCE INSIDE THE END POST
OF THE FIRST FENCE. BOTH POSTS SHALL BE ROTATED AT LEAST 180° IN A CLOCKWISE DIRECTION TO CREATE A
TIGHT SEAL WITH THE FABRIC MATERIAL. DRIVE BOTH POSTS 18" INTO THE GROUND & BURY FLAP.
3. SILT FENCES SHALL BE REMOVED ONLY AFTER DISTURBED AREAS HAVE BEEN STABILIZED.
WOOD POST @ 10' O.C.
MIN 1" X 2" X 3'
TRENCH MIN 4" X 4"
BURY MIN 8" OF FABRIC IN TRENCH
GEOTEXTILE SILT SCREEN
STAPLE TO POST
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA
(SLOPES NO GREATER THAN 5 PERCENT) WHERE SHEET OR OVERLAND FLOWS (NOT EXCEEDING 0.5 cfs)
ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS. SUCH AS
IN STREET OR HIGHWAY MEDIANS.
FABRIC SEDIMENT FILTER
SPECIFIC APPLICATION
BURLAP FABRIC
STAKES
BURIED BURLAP
FABRIC
RUNOFF WATER
WITH SEDIMENT
FILTERED WATER
CATCH BASIN INLET SEDIMENT TRAP
SILT FENCE
| Sheets and Views |
| G-005 STORMWATER POLLUTION PREVENTION PLAN NOTES |
| G-006 STORMWATER POLLUTION PREVENTION PLAN DETAIL |
File details come from the government source that posted it. Updated .