About this file

Hazardous Waste Form

View the file

Other files for this federal contract opportunity

Other files attached to Single-Award IDIQ Task Order Contract, newest first.
File Type Posted
FA2521-15-R-0031_RFP.pdf PDF
Atch_10_-_Breakdown_Template.xlsx XLSX spreadsheet
Atch_8_-_Solid_Waste_Disposal_Diversion_Tracking.pdf PDF
Atch_3_-_SXHT_14-1006_Drawings.pdf PDF
Atch_2_-_SXHT_14-1006_Specs.pdf PDF
Atch_7_-_GPP.pdf PDF
Atch_11_-_Site_Visit_ROE.doc DOC document
Atch_13_-_Site_Visit_Q A.doc DOC document
Atch_10_-_Breakdown_Template-Sample.xlsx XLSX spreadsheet
Atch_1_-_Scope_of_Work.pdf PDF
Atch_5_-_DBWD_FL150001_8MAY15.pdf PDF
Atch_4_-_SXHT_14-1006_SOW.pdf PDF
Atch_12-_Site_Visit_EAL_Request.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION

PROJECT #:
SXHT14-1006
PROJECT TITLE:
Rpr HVAC/Fire Prot, Control

CONTRACTOR:

POINT OF CONTACT:

PHONE:

FAX:

HAZARDOUS MATERIAL:
DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL

(INCLUDE METHOD OF APPLICATION)

DESCRIPTION OF WASTE:
QUANTITY:

Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.

Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:

1) Must remove and dispose of paints, building components, or equipment containing hazardous materials (lead, mercury, etc.)

2) Submits an MSDS for approval of use of a material known to be hazardous.

On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.

1. Project #: Provide installation project number.

2. Project Title: Provide installation project title.

3. Contractor: Enter complete name of contractor performing process.

4. Point of Contact: Provide name of individual knowledgeable on requirements of materials listed.

5. Phone/Fax: Provide phone and fax numbers for point of contact.

6. Hazardous Material: Provide common name of each hazardous material

7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).

8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.

9. Quantity: Estimate quantity of waste to be generated

10. Sign and date each form at bottom

CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________