Atch_4_-_SXHT_14-1006_SOW.pdf

PDF 18 KB Posted

Attached to
Single-Award IDIQ Task Order Contract Federal contract opportunity
Solicitation number
FA2521-15-R-0031
Issued by
Department of the Air Force Space Command

About this file

Initial Requirement Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Single-Award IDIQ Task Order Contract, newest first.
File Type Posted
Atch_2_-_SXHT_14-1006_Specs.pdf PDF
Atch_7_-_GPP.pdf PDF
Atch_11_-_Site_Visit_ROE.doc DOC document
Atch_13_-_Site_Visit_Q A.doc DOC document
FA2521-15-R-0031_RFP.pdf PDF
Atch_10_-_Breakdown_Template.xlsx XLSX spreadsheet
Atch_8_-_Solid_Waste_Disposal_Diversion_Tracking.pdf PDF
Atch_3_-_SXHT_14-1006_Drawings.pdf PDF
Atch_6_-_SXHT14-1006_Haz_Waste_Form.doc DOC document
Atch_10_-_Breakdown_Template-Sample.xlsx XLSX spreadsheet
Atch_1_-_Scope_of_Work.pdf PDF
Atch_5_-_DBWD_FL150001_8MAY15.pdf PDF
Atch_12-_Site_Visit_EAL_Request.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4

FA2521-15-R-0031

Attachment 4

STATEMENT OF WORK

PROJECT SXHT14-1006, Rpr HVAC/Fire Prot, Control Tower

2 Jun 15

The work to be performed under this project is located at Patrick Air Force Base (PAFB), The contractor shall provide all labor, materials, equipment, transportation, and supervision to accomplish the following statement of work. All work shall be done in accordance with all local building codes, and the requirements contained on the drawings and in the specifications, dated December 2014.

Contractor work hours shall be 0800 to 1700, Monday through Friday, excluding federal holidays. Should it become necessary for work to be accomplished during weekends and holidays, the contractor is to provide written notification 72 hours prior to the desired days. Since the government must provide a security escort, holiday and weekend work will be subject to approval.

Scope: The work to be performed under this project consists of providing all necessary labor, equipment and materials to remove and replace the stairwell pressurization system in the Air Traffic Control Tower (Bldg 1317) that provides protection for means of emergency egress upon activation of the fire alarm. Work includes but is not limited to removing and replacing the supply fan, louver damper, controls located on third floor and the louver, motorized damper and controls on the fifth floor. Provide weather seal at all exterior locations. Connect system to fire alarms and Energy Management Control System (EMCS) and test the facility’s entire fire alarm system for proper operation.

Work will be performed inside the Air Traffic Control Tower which is considered a critical facility and a secured area. A free zone will need to be established for the working area. Only authorized personnel will be permitted into area. All personnel must be vetted by 45 SFS and added to an Entry Authority List (EAL) for access into the facility. This is a manned facility and will remain fully operational throughout the duration of this project. Due to the critical nature of the work location, all work pertaining to this contract shall be completed with minimal disruption to the operation of building 1317.

All materials shall be approved prior to installation. If there is a question or concern about an item ask the project manager prior to initiating the work. Work shall be completed within 90 days after receipt of notice to proceed.