Atch_4_-_SXHT_14-1006_SOW.pdf
PDF 18 KB Posted
- Attached to
- Single-Award IDIQ Task Order Contract Federal contract opportunity
- Solicitation number
- FA2521-15-R-0031
About this file
Initial Requirement Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_2_-_SXHT_14-1006_Specs.pdf | ||
| Atch_7_-_GPP.pdf | ||
| Atch_11_-_Site_Visit_ROE.doc | DOC document | |
| Atch_13_-_Site_Visit_Q A.doc | DOC document | |
| FA2521-15-R-0031_RFP.pdf | ||
| Atch_10_-_Breakdown_Template.xlsx | XLSX spreadsheet | |
| Atch_8_-_Solid_Waste_Disposal_Diversion_Tracking.pdf | ||
| Atch_3_-_SXHT_14-1006_Drawings.pdf | ||
| Atch_6_-_SXHT14-1006_Haz_Waste_Form.doc | DOC document | |
| Atch_10_-_Breakdown_Template-Sample.xlsx | XLSX spreadsheet | |
| Atch_1_-_Scope_of_Work.pdf | ||
| Atch_5_-_DBWD_FL150001_8MAY15.pdf | ||
| Atch_12-_Site_Visit_EAL_Request.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
FA2521-15-R-0031
Attachment 4
STATEMENT OF WORK
PROJECT SXHT14-1006, Rpr HVAC/Fire Prot, Control Tower
2 Jun 15
The work to be performed under this project is located at Patrick Air Force Base (PAFB), The contractor shall provide all labor, materials, equipment, transportation, and supervision to accomplish the following statement of work. All work shall be done in accordance with all local building codes, and the requirements contained on the drawings and in the specifications, dated December 2014.
Contractor work hours shall be 0800 to 1700, Monday through Friday, excluding federal holidays. Should it become necessary for work to be accomplished during weekends and holidays, the contractor is to provide written notification 72 hours prior to the desired days. Since the government must provide a security escort, holiday and weekend work will be subject to approval.
Scope: The work to be performed under this project consists of providing all necessary labor, equipment and materials to remove and replace the stairwell pressurization system in the Air Traffic Control Tower (Bldg 1317) that provides protection for means of emergency egress upon activation of the fire alarm. Work includes but is not limited to removing and replacing the supply fan, louver damper, controls located on third floor and the louver, motorized damper and controls on the fifth floor. Provide weather seal at all exterior locations. Connect system to fire alarms and Energy Management Control System (EMCS) and test the facility’s entire fire alarm system for proper operation.
Work will be performed inside the Air Traffic Control Tower which is considered a critical facility and a secured area. A free zone will need to be established for the working area. Only authorized personnel will be permitted into area. All personnel must be vetted by 45 SFS and added to an Entry Authority List (EAL) for access into the facility. This is a manned facility and will remain fully operational throughout the duration of this project. Due to the critical nature of the work location, all work pertaining to this contract shall be completed with minimal disruption to the operation of building 1317.
All materials shall be approved prior to installation. If there is a question or concern about an item ask the project manager prior to initiating the work. Work shall be completed within 90 days after receipt of notice to proceed.